ML20196A761

From kanterella
Revision as of 11:08, 13 November 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards NRC Initial Operator Licensing Exam Schedule for Next Year or So as Requested in 990607 Telcon with F Guenther.Exam Schedules Change Frequently & Updated Monthly
ML20196A761
Person / Time
Issue date: 06/18/1999
From: Gallo R
NRC (Affiliation Not Assigned)
To: Post R
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
NUDOCS 9906220306
Download: ML20196A761 (20)


Text

. --

r .'

'j ,g 'he t- "M fune 18, 1999 i

i Mr. Robert E. Post, Senior Project Manager Nuclear Energy Institute i

~ Suite 400 1776 Eye Street, NW rs LWashington', D.C. 20006-3708

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION SCHEDULE

Dear Mr. Post:

As requested in your telephone conversation with'Mr, Fred Guenther of my staff on June 7,1999, I am enclosing a copy of the NRC's initial operator licensing examination schedule for the next year or so. Please note the exam schedules change frequently and are updated monthly.

' I trust that the schedule will prove helpful in collecting the examination performanc'e indicators that we discussed during our meeting last week. Please call me on 301-415-1031 if you have any questions.

Sincerely, Original signed by:

Robert M. Gallo, Chief Operator Licensing, Human Performance and Plant Support Branch j Office of Nuclear Reactor Regulation

Enclosure:

As stated c7S/09 DISTRIBUTION:

B F .I',a' PUBLIC f f BBoger/FGillespie

  • See previous concurrence  ;

FILE NAME: G:/lOHS/GUENTHER/NEl-SCHED.WPD .

  • C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "h No OFFICE NAMEo lOLB/DIPM FGuenther:fg/rc lC IOLS/DIPM -lE IQi,.B@ LPM l f 1 DTrimble R4%Ilo
k. DATE s 06/08/99*. 06/09/99* 06 6 /99 '

l "

OFFICIAL RECORD COPY-- ,/O

/

n 303".

6 gu- \,PT55 t <

gg6agggg ggagc L ,

J

,. ' M' %.

p'.1 G20g g* \ UNITED STATES j

NUCLEAR REGULATORY COMMISSION WASHinfGToN, D.C. 20666-0001 4

9***** June 18, 1999 Mr. Robert E. Post, Senior Project Manager Nuclear Energy Institute Suite 400 1776 Eye Street, NW Washington, D.C. 20006-3708

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION SCHEDULE

Dear Mr. Post:

As requested in your telephone conversation with Mr. Fred Guenther of my staff on June 7,1999, I am enclosing a copy of the NRC's initial operator licensing examination schedule for the next year or so. Please note the exam schedules change frequently and are updated monthly.

I trust that the schedule will prove helpful in collecting the examination performance indicators that we discussed during our meeting last week. Please call me on 301-415-1031 if you have any questions.

Sincerely, Robert M. Gallo, Chief Operator Licensing, Human Performance and Plant Support Branch Office of Nuclear Reactor Regulation

Enclosure:

As stated

(

L' . . . . . . . . . . . . . .

REGION III POWER REACTOR EXAMINATION SCllEDULE FY 1999, FY 2000, AND FY 2001 - REVISED JUNE 1,1999 til EKAM WEEK (2) F ACluTY/ 131 NOJTYPE OF idi TYPE OF 151 CHIEF EX AMINER. tel PLANT CONTACT. (7) EXAM ist DOCKET NO. C ANDIDAT ES EAAM OR NAME/ PHONE NO. NAME/ PHONE NO. AUTHOR REGIONAL INSPECTION E XAMINERS ASSaGN FO m--mm 10/12/98 Dresden Initial D. McNeil J. Almon Exam Prep D. McNeil 50-237/249 Prep / Val 630-829-9737 815-942 2920 D. Muller TR Jones 10/19/98 Perry Requal R. Bailey E. Root inspect R. Bailey 50-440 Inspection 630-829-9750 440-280.5646 Requal A.M. Stone 10/26/98 Dresden 3RO Initial D. McNeil J. Almon I AC WR. D. McNeil 50-237/249 3 SRO 630-829-9737 815 942-2920 RO/SRO D. Muller (2-1 & 1 U) 1JPM TR Jonce 5 SCEN NRC A9.;

6 OPER 11/16/98 Davis-Besse Requal R. Bailey J. House inspect R. Bailey 50 346 Inspect;on 630-829-9750 419 321-7331 Requal TR Jones 11/30/98 Byron Requal D. McNeil T. Schnsde Inspect D. McNeil 50-454/455 Inspection 630-829-9737 815-234-5441 Requal TR Jones 11/30/98 Duane Arnold Requal II. Peterson K. Young Inspect H. Peterson 50-331 Inspection 630-829-9707 319-851-7229 Requal D Smith 01/04/99 Clinton Requal M. Bielby J. Hanson inspect M. Bielby i THRU 50-461 Inspection 630-829-9762 217-935-8881 Requal D. Muller 02/19/99 '

02/22/99 DC Cook CANCEL Requal ,

50-335/316 Inspection 03/01/98 Perry laitial D. MeNeil J. Duffield Exam Prep D. McNeil  ;

50-440 Prep / Val 630-829-9737 440-280-5651 D. Muller D. Roth 03/08/99 Monticello Requal H. Peterson M. Mitchell lampect H. Peterson 3 50-263 Inspection 630-829-9707 612-295 1569 Requal D. Pelton  !

03/I5/99 Perry 7RO Initial D. McNeil J. Duffield DECi D. McNeil

.50-440 2 SRO 630-829-9737 #4G 280-565 i WR RO/SRO D. Muller (I-I & 1-U) 1JPM D. Roth 6 SCEN D. Pelton 8OPER 03/22/99 AND DC Cook CANCEL Initial J)/29/99 50-315/316 05/03/99 Prairie Island laitial D. McNeil M. Ladd Exam Prep D. McNeil 50 282/306 Prep / Val 630-829-9737 612-388-1165 D. Muller 05/17/99 Prairie faland 3RO Initial D. McNeil M,Ladd FAC MR: D. McNeil 50-282/306 630-829-9737 612-388-1165 RO D. Muller i JPM 4 SCEN NRC AD: y 3 OPER

_ ]

1 05/24/99 Duane Arnold 1RO Initial Retake M.Bielby K. Young FAC ML M. Bielby l 50 331 6304 29 9762 319-851-7229 IE i 1

I I

1

l l

l fil EX AM WEEK (21 F ACILITY/ (31 NO./ TYPE OF I41 TYPf 0F 15i Chit F EX AM'NLR, I6p PLANT CONT ACT 171 EX AM (8!

DOCKETNo. C AND10 AT ES EK AM OR NAME: PHONE NO N AME, PHONE NO. AUTHOR RE GaON AL

%PECTION EX AMIN ERS AssicNro 6m----mm

  • 05/24/99 Braidwomi Initial 11. Peterson *R. Coon Exam Prep H. Peterson 50-456/457 Prep / Val 630-829-9707 815-458-2801 D. Smith D. Pelton M.Ernstes (RIT) 05/24/99 Palisades Initial R. Bailey E. ChatGeld Exam Prep R. Bailey 50-255 Prep / Val 630-829-9750 616 764 2839 M. Bielby J. Hansen_

06/07/99 Palisades 3RO Initial R. Bailey E. ChatGeld FAC WR: R. Bailey 50-255 4 SRO-! 630-829-9750 616-764-2839 RO/SRO M. Bielby 1JPM J. Hansen 6 SCEN NRC AD:

7 OPER

  • 06/07/99 Braidwomi iRO Initial 11. Peterson *R. Coon MC WR: H. Peterson 50-456/457 '3 SRO 630-X29-9707 815 458-2801 RO/SRO D.Snsth IJPM D. Pelton 4 SCEN M.Ernates NRC AD: (RII)
  • 4 OPER 07/12/99 Point Beach Initial D. McNeil W. Walter Exam Prep D. McNeil 50-266/301 Prep / Val 630-829 9737 920-755-6347 M. Bielby B. Hughes D. Smith (CERT)

D. Pelt <m (CERT)

  • 07/19/99 D. C. Cook Requal *H. Peterson B. Wallace inspect 'H.

50-385/316 Inspection 630-N29-9707 616-466-3314 Requal Peterson

  • 07/19/99 Quad Cities ' MOVED TO Requal 50-254/265 10/18 AND Inspection 10/25/99 07/26/99 Point Beach 4RO Initial D. McNeil W. Walker b@,[J D. McNeil 50-266/301 6 SRO 630-829-9737 920-755-6347 WR RO/SRO M. Bielby 1JPM B. Hughes 4 SCEN D. Smith 10 OPER (CERT)

D. Pelkin (CERT)

  • 08/02/99 D. C. Cook
  • MOVED TO Requal 50-315/316 07/19/99 Inspection 08/09/99 Monticello initial R. Bailey T. Witschen Exam Prep R. Bailey 50-263 Prep / Val 630-829-9750 612-271-2626 D. Muller 08/16/99 Pois Beach Requal M. Bielby W. Walker inspect M. Bielby 50-266/301 Inspection 630-829-9762 920-755-6347 Requal D. Smith 08/23/99 Monticello 5RO laitial R. Bailey T. Witschen FAC WRt R. Bailey 50-263 1 SRO U 630-829-9750 612-271-2626 RO/SRO D. Muller i JPM 4 SCEN NRC AD:

6 OPI'R C3/30/99 Davis-Beau initial II. Peterson J. House Exam Prep H. Peterson 50-346 Prep / Val 630-829-9707 410-321-7331 P. Bimt (Recion Il 2

i 4 4 l

(t)(AAM WL(K 421 F ACILITY/ (3! NOJTYPE OF tal TYPE OF 16) CHIEF f a AMiNER. 461 PL AN r C ON T ACT. W [xAM (B)

DOCKET NO. CANDaDATES EXAM OR NAM (! PHONE NO. NAME/ PHONE NO. AUTHOR RE O!ON AL INSPECTION EXAMINER $

mmMNNmm 09/06/99 Duane Arnold laitial D. McNeil K. Young Exam Prep D. McNeil 50-331 Prep / Val 630-829-9737 319-851 7229 G. Larina '

D. Roth A.M. Stone 1 (CERT)

  • 09/13/99 12Salle Requal R. Bailey G. Kaegi
  • inspect R. Bailey l 50-373/374 Inspection 630-829-9750 815-357-6761 Requal (JPM) D. Muller 1

09/13/99 Davis Besse 8RO Initial H. Peterson J. House FAC WPJ H. Peterson )

I 50-346 630-829-9707 419-321 7331 RO P. Bissett 1JPM (Region I) 4 SCEN NEC AD.

8OPER 09/20/99 Duane Arnold 5RO initial D. McNeil K. Young fAC WRt D. McNeil 50-331 4 SRO 630-829-9737 319-851-7229 RO/SRO G. larizza 1JPM D. Roth 6 SCEN A.M. Stone NRC AD: (CERT) 9 OPfR

  • 09/27/99 Braidwood Requal R. Bailey *R. Coon Inspect R. Ibiley )

50-456/457 Inspection 630-R29-9750 815-448-2801 Requal *M. Bielby 10/04/99 Clinton Requal M. Bielby J. Hanson Inspect M. Bielby 50-461 innpection 630-829-9762 217-935-RRR 1 Requal D. Muller

  • 10/18/99 LaSalle Requal R. Bailey G. Kaegi
  • Inspect R. Bailey 50-373/374 Inspection 630-A29-9750 215 357-6761 Requal (SIM) D. Muher
  • I0/18/99 Prairie Island
  • MOVED TO Requal 50 282/306 11/01 AND inspection i I/08/99 )

l

  • 10/18/99 Quad Cities Requal H. Peterson F. Tsakerr;s inspect H. Peterson AND 10/25/99 50 254/265 Inspection 630-829-9707 309-654-2241 Requal *A.M. ,

Sinne I

  • lI/01/99 Prairie faland Requal *M.Bielby M. Ladd Inspect *M. Bielby AND il/08/99 50-282/306 Inspection 630-R29-9762 612-388-1165 Requal A.M. Stone 11/22/99 Fermi Requal D. McNeil J. Davis Inspect D. McNei! l 50-341 Inspection 630-829.9737 734-586 40!! Requal D. Muller '
  • I1/29/99 laSalle Requal R. Bailey G. Kaegi
  • Inspect R. Bailey 50-373/374 Inspection 630-R29.9750 815-357-676i Requal (WR)
  • 01/03/00 Fermi
  • MOVED TO Initial 50-341 01/10/00 Prep / Val
  • 01/10/00 Fermi Initial M. Bielby J. Davis Exam Prep M. Bielby 50-34i Prep / Val 630-829-9762 734-586-4000 H. Peterson R. Bailey
  • 01/24/00 Feemi 6RO Initial M. Bielby J. Davis FAC WR: M. Bielby
  • AND 50-341 6SRO 630-829-9762 734-586-4011 RO/SRO H. Peterson
  • 01/31/00 2 JPM R. Bailey 6 SCEN NRC AD:

12 OPI3 02/14/00 Quad Cities initial D. McNeil F. Taskeres Exam Prep D. McNeil .

50-254/265 Prep / Vel 630 829-9737 309-654-2241 G. Larina D. Muller A.M. Stone (CHIEF CERT) 3

1

.x o l

i til EXAM WE EK L2p F ACluTY/ L3) NO./ TYPE OF (46 TYPE OF (61 PLANT CONT ACT, i61 CHIEF EXA%NER. 171 EX AM (8)

DOCKET NO. CANOiOATES EXAM OR N AME. PHONE NO. NAME/PMONE NO. AUTHOR RE GION AL INSPECTION E X AMIN ER$

ASSIGNED NN mm--- l 03/06/00 Quad Cities 7RO laitial D. Me Neil F. Taakeres FAC WR: D. McNeil AND 50-254/265 4 SRO 630-829-9737 309-654-2241 RO/SRO G. Larina 03/13/00 (1 1 & 3.U) , 1JPM D. Muller 8 SCEN A.M. Stone NRC AD: (CHIEF 11 OPER CERT) 03/06/00 Dresden Requal H. Peterson . Almon inspect H. Peterson 50-237/249 Inspection 630-N29 9707 814 942-2920 Requal D. Smith 03/06/00 Palisades Requal R. Bailey E. Chatfield Inspect R. Bailey 50-255 Inspection 630-829-9750 616 764-2839 Requal M. Bielby 03/27/00 Monticello Requal D. Smith T. Witschen Inspect D. Sndth 50-263 Inspection 630-829-9719 612-271 2626 Written Requa!

04/24/00 Kewaunee Requal H. Peterson J. Brown Inspect H. Peterson 50-305 Innpection 630-H29-9707 920-388 8430 Requal D. Muller 04/24/00 Prairie taland initial M. Bielby M. Ladd Exam Prep M. Bielby 50-282/306 Prep / Val 630-829-9762 612 388-1165 A.M. Stone 05/15/00 Prairie faland 4 SRO-U Initial M.Bielby M. LaJd F AC WR M. Biciby 50-282/306 630'829-9762 612-388-1165 SRO A.M Stone iJPM iSCEN D.E.C:

4 OPER 05/15/00 Clinton initial R. Bailey J. Hanson Exam Prep R. Bailey 50-461 Prep / Val 630-829-9750 217-935-8881 D. Muller D. Roth 05/29/00 Byron Initial D. McNeil T. Schndd4 Exam Prrp D. Mc Neil 50-454/455 Prep / Val 630-829-9737 815 234-5441 D. Sndth

. D, Pelton 06/05/00 AND Clinton 6RO Initial R. Bailey J. Hanson FAC WK R. Bailey 06/12/00 50-461 12SRO 630 829-9750 217-935 8881 RO/SRO D. Muller (10-1 & 2-U) 2 JPM D. Roth 8 SCEN D.EC:

18 OPTR 06/19/00 AND Byron 9RO Initial D. McNeil T. Schmidt FAC MR D. McNeil 06/26/00 50-454/455 6 SRO I 630-829-9737 815-234-5441 RO/SRO D. Smith 2JPM D. Pelton 6 SCEN NRC AD 15 OPER 07/03/00 D.C. Cook Initial A. M. Stone B. Wallace Exam Prep A .M. Stone 50-315/316 Prep / Val 630-829-9729 616-466 3314 D. Snuth G. Larizza ,

l 07/03/00 Paliaules initial H. Peterson E. Chatfield Exam Prep H. Peterson 50-255 Prep / Val 630-829-9707 616-764-2839 J. Hansen 07/17/00 Quad Citica Requal R. Bailey F. Tsakeres laspect R. Bailey 50 254/265 Inspection 630-829-9750 309 4 54-224i Requal D. Muller 07/24/00 AND D. C. Cook 6RO laisial A. M. Stone B. Wallace F AC WR A.M. Stone 07/31/00 50-315/316 6SRO 630-829-9729 616-466-3314 RO/SRO D. Sndth 2 JPM G. larina 6SCEN NRC AD 12 OPER 4

D i ItEGION 111 POWER REACTOR EXAMINATION SCllEDULE FY 1999, FY 2000, AND FY 2001 - RE'dSED JUNE 1,1999 1 i

til EX AM WEEK. (2) F ACILITVI (3l NO./ TYPE OF 44l TYPE OF (6I CHIEF EXAMINER, 16) PLANT CONT ACT, 17l EX AM 18)

DOCKET NO. CANDIDATES EXAM OR NAME/ PHONE NO. NAME/ PHONE NO. AUTHOR REGIONAL INSPECTION EXAMINER $

Assichro 10/12/98 Dresden Initial D. McNeil J. Almon Exam Prep D. McNeil 50-237/249 Prep / Val 630-829-9737 815-942-2920 D. Muller TR Jones 10/19/98 Perry Requal R. Bailey E. Root inspect R. Bailey 50-440 Inspection 630-829 9750 440-280-5646 Requal A.M. Stone 10/26/98 Dnaden 3RO Initial D. Mc Neil J. Alnen FAC WR: D. McNeil 50-237/249 3 SRO 630-829-9737 815 942-2920 RO/SRO D. Muller (21 & 1 U) 1JPM TR Jones 5 SCEN NRC AD:

6 OPF.R I1/16/98 Davis-Benne Requal R. Bailey J. Ilouse Inspe6 R. Bailey 50-346 Innpection 630-829-9750 419-321-7331 Requal TR Jones 11/30/98 Byron Requal D. McNeil T. Schmidt Inspect D. McNeit 50-454/495 Inspection 630 829-9737 815-234-5441 Requal TR Jones 11/30/98 Duane Arnold Requal H. Peterson K. Young inspect H. Peterson 50-331 Inspection 630-829-9707 319-851-7229 Requal D. Smith 01/04/99 Clinton Requal M. Bielby J. Ilanson luspect M. Bielby THRU $0-461 Inspection 630-829-9762 217-935-8881 Requal D. Muller 02/19/99 02/22/99 DC Cook CANCEL Requal 50-315/316 Inspection 03/01/99 Perry Initial D. McNeil J. Dufrield Exam Prep D. McNeil 50-440 Prep / Val 630-829-9737 440-280-5651 D. Muller D. Roth 03/08/99 Monticello Requal H. Peterson M. Mitchell Ir.Jpect H. Peterson ,

50-263 Inspection 630-829.9707 612 295-1569 Requal D. Pelton l 03/15/99 Perry 7RO initial D. McNeil J. Duffield N.I!Q D. McNeil l 5t'd'0 2 Sko 630-829 9737 440-280-5651 WR RO/SRO D. Muller I (1 1 & l-U) 1JPM D. Roth 6 SCEN D. Pelton 8 OPER 03/22/99 AND DC Cook CANCEL Initial 03/29/99 50-315/316 05/03/99 Prairie Island Initial D. McNeil M. Ladd Exam Prep D. McNeil 50-282/306 Prep / Val 630-829-9737 612-388-1165 D. Muller 05/17/99 Prairie taland 3 RO Initial D. McNeil M. Ladd FAC WR: D. McNeil 50-282/306 630-829-9737 612-388-1165 RO D. Muller

! JPM 4 SCEN NRC AD:

3 Orr3t 05/24/99 Duane Arnold 1RO laitial Retale M.Bielby K. W ung F AC WR M. Bielby 50-331 630 829-9762 319-851-7229 RO 1

e s

IllEkAM WEEK (2) F ACILITY/ 131 NO./ TYPE OF idl TYPE OF 16! CHIEF E R AMINER, 161 PL ANT CON T AC T, thEAAM isi OOCKET NO. C ANDID A T ES EXAM OR N AME,PHO$eE NO. N AME PHONE NO. AUTHOR REGION AL INSPECTION EXAMINERS A%GNFD mm--m m

  • 05/24/99 Braidwo uf Initial II. Fetermn *R. Coon Exam Prep 11. Peterson 50-456/457 Prep / Val 630-829-9707 815-458-2801 D. Smith D. Pelton M.Ernstes (RID 05/24/99 Palisades initial R. Bailey E. Chatfield Exem Prep R. Bailey 50255 Prep / Val 630-829 9750 616,764-2839 M. Bielby J. Hanun 06/07/99 Palisades 3RO Initial R. Bailey E. Chatfield FAC WR: R. Bailey 50-235 4 SRO-1 630-829-9750 616-764-2839 RO/SRO M. Bielby 1JPM J. Hansen 6 SCEN NRC AD:

7 OPER

  • 06/07/99 Braidwmmi iRO Initial II. Peterson *R. Coon FAC WR H. Peterson 50-456/457 '3 SRO 630-829 9707 815-458-2801 RO/SRO D.Sndth IJPM D. Pelton 4SCEN M Ernstes I SRC AD: (RH)
  • 4 OPER l

, 07/12/99 Point Beach Initial D. McNeil W. Walker Exam Prep D. McNeil 50-266/301 Prep / Val 630-829 9737 920-755-6347 M. Bielby B. Hughes D. Smith (CERT)

D. Pelton (CERT)

  • 07/10/99 D. C. Cook Requal *H. Peterson B. Wallace laspect *H.

50-315/316 Inspectinn 630-829-9707 616466-3314 Requal Peterson

  • 07/19/99 Quad Cities
  • MOVED TO Requal 50-254/265 10/18 AND Inspection 10/25/09 07/26/99 Point Beach 4RO initial D. McNeil W. Walker EI?C,; D. McNeil 50 266/301 6 SRO 630-829-9737 920-755-6347 WR RO/SRO M. Bielby l 1JPM B. Hughes l 4 SCEN D. Smith 10 OPER (CERT) l D. Pelton (CERT) 808/02/99 D. C. Cook
  • MOVED TO Requal 50-315/316 07/19/99 Inspection 08/09/99 Monticello Initial R. Bailey T. Witschen Exam Prep R. Bailey i 50-263 Prep / Val 630-829-9750 612-271-2626 D. Muller '

08/16/99 Point Beach Requal M. Bielby W. Walker Inspect M. Bielby I 50-266/301 Inspection 630-829 9762 920-755-6347 Requal D. Smith i 08/23/99 Monticello 5RO Initial R. Bailey T. Witschen FAC WR: R. Bailey 50-263 1 SRO-U 630-829-9750 612-271-2626 RO/SRO D. Muller iJPM 4 SCEN SRC AD:

6 OPER 08/30/99 Davis-Besse h.itial H. Peterson J. House Exam Prep H. Peterson 50-346 Prep / Val 630-829-9707 419 321 7331 P. Bissett m erinn D 2

6 (11 EXAM WEEK 421 F ACILITY/ (3) NOJTYPE OF (al TYPE OF $1 CHIEF EA AMiNER. 161 PLANT CONTACT, (h EXAM tal DOCKET NO. C ANDIDAT E S EXAM OR NAME/ PHONE NO. NAME/ PHONE NO. AUTHOR RE OIONAL INSPEch0N EX AMIN ER$

NNNNNmmM 09/06/99 Duane Arno!J Initial D. McNeil K. Young Exam Prep D. McNeil 50-331 Prep / Val 630-829-9737 319-851-7229 G. Larizza D. Roth A.M. Stone (CERT)

  • 09/13/99 LaSalle Requal R. Bailey G. Kaegi *! aspect R. Bailey 50-373/374 Inspection 630-829-9750 215-357-6761 Requal (IPM) D. Muller 09/13/99 Davis-Besse 8RO Initial H. Peterson J. House F AC WR H. Peterson 50-346 630-829-9707 419-321 7331 RO P. Bissett iJPM (Region I) 4 SCEN NRC AD:

8OPER 09/20/99 Duane Arnold 5 RO Initial D. McNeil K. Young FAC WR: D. McNeil 50-331 4 SRO 630-829-9737 319 851 7229 RO/SRO G. larizza 1JPM D. Roth 6 SCEN A.M. Stone NRC AD. (CERT) 9 OPER i

  • 09/27/99 Braidwood Requal R. Bailey *R. Coon Inspect R. Bailey 50-456/457 Inspection (30-829-9750 N 15-458-2R01 Requal *M. Bielby l 10/04/99 Clinton Requal M. Bielby J. Hannon Inspect M. Bielby 30-461 Inspection 630-829-9762 217-935-8R A I Requal D. Muller

~

  • l0/18/99 LaSalle Requal R. Bailey G. Kaegi
  • Inspect R. Bailey 50-37 /374 Inspection 630-829.9750 R 15-357-6761 Requal (SIM) D. Muller

+10/18/99 Prairie Island

  • MOVED TO Requal 50-282/306 11/0! AND Inspection 11/08/99
  • 10/18/99 Quad Cities Requal H. Peterson F. Tsakeres Inspect H. Peterson AND 10/25/99 50-254/265 Inspection 630-829-9707 309 454-2241 Requal 'A.M. j Stone
  • 11/01/99 Prairie Island Requal *M.Bielby M. ladd Inspect *M. Bielby AND il/08/99 50-282/306 Inspection 630-829-9762 612-388-1165 Requal A.M. Stone 11/22/99 Fermi Requal D. McNeil J. Davis Inspect D. McNeil 50-34I In=pection 630-829-9737 734-586 soli Requal D. Mu!!er
  • 11/29/99 LaSalle Requal R. Bailey G. Kaegi
  • Inspect R. Bailey 50-373/374 Inspection 630-829-9750 R15-157-676I Requal (WR) i
  • 01/03/00 Fermi
  • MOVED TO Initial l 50-341 01/10/00 Prep / Val
  • 01/10/00 Fermi Initial M. Bielby J. Davis Exam Prep M. Bielby 50-341 PrepNat 630-829-9762 734-586-4000 H. Peterson R. Bailey
  • 01/24/00 Fermi 6RO Initial M. Bielby J. Davis FAC WR: M. Bielby

'AND 50-341 6SRO 630-829-9762 734-586-4011 RO/SRO H. Peterson

  • 01/31/00 2 JPM R. Bailey 6 SCEN NRC AD.

12 OPER 02/14/00 Quad Cities Initial D. MeNeil F. Tsakeres Exam Prep D. McNeil 50-254/265 PrepNat 630-829-9737 309 454-2241 G. Larizza D. Muller A.M. Stone (CHIEF CERT) 3

e (Il EXAM WEEK t21 F ACILITYi 13# NOffYPE OF (41 TYPE OF I6l CHIEF Exam %ER. (61 PL ANT CON T AC T. (h EX AM '81 DCCKET NO. C ANDID Aflh EXAM OR N AME! PHONE NO. N AME, PHONE NO. AUTHOR REGIONAL INSFECilON EXAMINERS mmm---- Assicuro 03/06/00 Quad Cities 7RO Initial D. McNeil F. Tsakeres FAC WR: D. McNeil AND 50-254/265 4 SRO 630-829 9737 309-654-2241 RO/SRO O. Larizza 03/13/00 (1-1 & 3.U) 1JPM D. Muller 8SCEN A.M. Stone ,

NRC AD. (CHIEF 11 OPER

{

CERT) l I

03/06/00 Dresden Requal H. Peterson J. Almon inspect H. Peterson l 50-237/249 ini.nection 630-829-9707 815-942-2920 Requal D. Smith  !

03/06/00 Palisades Requal R. Bailey E. Chatfield Inapest R. Bailey 50-255 Inspection 630-829-9750 616-764-2830 Requal M. Bielby 03/27/00 Monticello Requal D. Smith T. Witschen Inspect D. Smith 50-263 Inspection 630-829 9719 612-271-2626 Written Requal 04/24/00 Kewaunee Requal H. Peterson J. Brown inspect H. Peterson 50-305 Inspection 630-829-9707 920-388-8430 Requal D. Moller 3 04/24/00 Prairie Island initial M. Bielby M, Ladd Exam Prep M. Bielby 50-282/306 Prep / Val 630-829-9762 612-388 1165 A.M. Stone 05/15/00 Prairie faland 4 SRO-U Initial M.Bielby M. Ladd F AC WR M. Bielby 50-282/306 630-829 0762 612-388 1165 SRO A.M. Stone IJPM iSCEN M!C:

4 OPFR 05/15/00 Clinton Initial R. Bailey J. Hanson Exam Prep R. Bailey 50461 Prep / Val 630-829-9750 217 935-8881 D. Muller D. Rosh 05/29/00 Byron Initial D. McNeil T. Schmidt Exam Prep D. McNeil 50-454/455 Prep / Val 630-829-9737 815-234-5441 D.Snsth D. Pelton 06/05/00 AND Clinton 6RO Initial R. Bailey J. Hanson F AC %R R. Bailey 06/12/00 50-461 12 SRO 630-829-9750 217-935-888I RO/SRO D. Muller (10-I & 2-U) 2 JPM D. Roth 8 SCEN SIC 18 OPER 06/19/00 AND Byron 9RO initial D. McNeil T. Schmidt i AC WR D. McNeil 06/26/00 50-434/455 6 SRO-I 630-829-9737 815-234 544i RO/SRO D. Smith 2 JPM D. Pelton 6SCEN NRC AD 15 OPFR 07/03/00 D.C. Cook initial A. M. Stone B. Wallace Exam P:sp A.M. Stone 50-315/316 Prep / Val 630-829-9729 616-466-3314 D. Smith G. Larizza 07/0300 Palisades Initial II. Peterson E. Chatfield Exam Prep H. Peterson 50-255 Prep / Val 630-829-9707 616-764-2839 J. Hansen 07/17/00 Quad Cities Requal R. Bailey F. Taskeres inspect R. Bailey 50-254/265 Inspection 630-879-9750 309-654-2241 Requal D. Muller 07/24/00 AND D. C. Cook 6RO Initial A. M. Stone B. Wallace FAC WR A.M. Stone 07/31/00 50-315/316 6 SRO 630429-9729 616-466-3314 RO/SRO D. Smith 2 JPM O. Larizza 6 SCEN NRC AD:

12 OPER 4

a til EXAM WEEK (217 ACIUTYI (31 NOjTYPE OF (41 TYPE OF (6t CHtEF EX AMiNER. 168 PLANT CONT ACT, (FIEXAM tal DOCKETNO. C AND10 ATES EXAM OR N AMEPHONE NO. N AME PHONE NO. AUTHOR REGIONAL ANSPECTION EXAMINERS ASSIONFD Nmmm-mmm 07/24/00 Palisades 4 SRO-l Initial H. Peterson E. Chatfield H. Peterson FAC WR:

50-255 630-829-9707 616-764-2839 SRO J. llansen 1JPM 3 SCEN NRC AD:

4 OPER 08/21/00 D. C. Cook Requal D. Mc Neil B. Wallace Inspect D. Mc Neil 50-315/316 Inspection 630-R 29-9737 616-466-3314 R. equal D. Muller 09/04/00 Clinton Requal R. Bailey J. Ilanson Inspect R. Bailey 50 461 Impection 630-829 9750 217-935 RRRI Requal D. Smith 09/11/00 Davis-Besse Initial H. Peterson J. House Exam Prep H. Peterson 50-346 Prep / Val 630-R29 9707 419-321-7331 J. Hansen 10/02/00 Davis-Besse 4 SRO-U Initial H. Peterson J. House FAC WR H. Peterson 50-346 630-829-9707 419-321-7331 SRO J. Ilansen 1JPM 1SCEN NRC AD:

4 OPER 10/02/00 12Salle Requal A. M. Stone G. Kaegi inspect A.M. Stone 30-373/374 Inspection 630-829-9729 815-357-6768 Requal R. Bailey 10/02/00 Point Beach initial M. Biethy W. Walker Exam Prep M. Bielby 50-266/301 Prep / Val 630-829-9762 920-755-6347 D. Muller D. Smith

  • 10/16/00 Point Beach *8RO Initial M. Bielby W. Walker h,RC: M. Bielby
  • AND 50-266/301 *7 SRO-I 630-829-9762 920-755-6347 WR RO/SRO D. Muller
  • 10/23/00 +3 SRO-U I JPM D. Smith 4SCEN
  • lROPER 10/23/00 Byron Requal A. M. Stone T. Schmidt inspect A.M. Stone 50-454/455 Inspection 630-829-9729 R15-234-544! Requal 10/23/00 Duane Arnold Requal R. Bailey K. Young Inspect R. Bailey 50-331 Inspection 630-829-9750 319-851-7229 Requal 10/23/00 D.C. Cook laitial B. Wallace Exam Prep 50-335/316 Prep / Val 616-466-3314 10/30/00 LaSalle Initial D. McNeil G. Kaegi Exam Prep D. McNeil 50-373/374 Prep / Val 630-829-9737 815-357-6761 D. Muller D. Roth 11/06/00 AND D. C. Cook 9RO Imtial B. Wallace b'RC:

11/13/00 50-315/316 9 SRO 616-466 3314 WR RO/SRO 2 JPM 8 SCEN 18OPER j l

11/13/00 AND LaSalle 8RO Initial D. McNeil G. Kaegi b'RC: D. McNeil 1 1I/20/00 50-373/374 4 SRO-I 630 829-9737 815-357-676i WR RO/SRO D. Muller f 1JPM D. Roth  !

4 SCEN l 12 OPER 11/13/00 Davie-Besse Requal J. House Inspect 50-346 Inspection 419-321-7331 Requal 11/13/00 Braidumd initial J. Walker Exam Prep 50-456/457 Prep / Val 815-458-2R01 ]

11/20/00 Dresden Initial J. Almon Exam Prep 50-237/249 Preri/ Val 815 042-2020 5

I o

(1) (AAM W((K (21 F ACiUTYI OI NO./TYPf 07 (41 TYPC OF (61 CHif F EX AM:NER. 16t PLAN T CONT AC T, diEAAM :3)

DOCKET NO. C ANDID AT E S EXAM OR N AM(/ PHONE NO. NAMf/ PHONE NO. AUTHOR REGIONAL INSPECTION EXAMINERS mmmm---

11/27/00 Kewaunee initial J. Brown Exam Prep 50-305 PrepNat 920-388-8430 11/27/00 Monticello initial T. Witwhen Exam Prep 50-263 PrepNa! 612-271-2626 11/27/00 Perry Initial, J. Dumeld Exam Prep 50-440 Prep / Val 440-280 4 651 12/04/00 AND Braidwant 8RO Initial J. Walker E:

12/11/00 50-456/457 8 SRO-1 815-458-2801 WR RO/SRO l 2 JPM 8 SCEN 16 OPER 12/04/00 AND Dresden 2RO Initial J. Almon i AC WH 12/11/00 50-237/249 10 SRO 815-942 2920 RO/SRO 2JPM 6 SCEN NRC AD:

12 OPER 12/11/00 AND Kewaunee 6RO Initial J. Brown E:

12/18/00 50-305 4 SRO 920-388-8430 WR RO/SRO (21 & 2 U) 1JPM 6 SCEN 10 OPER i

12/11/00 Montice!!o 5SRO Initial T Witschen E:

50-263 (1 1 & 4 ll) 612-271-2626 WRSRO ,

1JPM l 2 SCEN l 5 OPER l 12/11/00 Perry 6RO Initial J. Dumeld E:

50-440 4 SRO 440-280-5651 WR RO/SRO 1JPM 6 SCEN 10 OPER 12/18/00 Perry Requal J. Dumeld Inspect 50-440 Inspection 440-280-5651 Requal 03/19/01 Monticello Requal T. Witschen Inspect 50-263 Inspection 612-271-2626 Requal

  • Indicates change.

Tha schedule for the First Quarter, FY 2001 reflects the f acilities' requests which f ar exceed available Region lit examiner resources during that period. Possible solutions are currently being evaluated. In the interim, specific assignments have not been finalized for several of these examinations.

6

i- 4 l

g REGION 1 FY-99

' POWER REACTOR EXAMINATION SCHEDULE

)

REVISED June 1,1999 Enem Week Facility / No. of Type of Chief Plant Exam Re9i onal Date Dock No Candidates Enam Examiner Contact- Author Examiners Name/ Name Assigned Phone No Phone No 10-19 98 Seabrook RO 4 initial Bissett R. Hickok FAC Barr 50-443 SRol-5 337-5286 603-773 7617 Caruso 10-19-98 Pilgrim RO 5 initial Williams M. Santiago FAC Dennis 50-293 SROI4 337 5124 508-830-7617 Fish 10-19-99 Ginne . RO3 initial Kenny R. Popp FAC D' Antonio 50-244 SROU 1 337-5287 716-771-6625 Maier 11 16 98 Indian Pt 3 RO 6 Initial Briggs D. Spoerry FAC Kenny Written 50-286 SROU 3 337-5366 914-788-2901 D' Antonio 11 13-98 11 16-98 Millstone 2 Requal W.lliams Williams 50-336 337-5124 11-30-98 Hope Creek Requal Caruso Caruso Chanced 50-354 337-5389 Fish fl.11:99.Ef 12-07-98 Hope Creek RO7 initial Sisco J. Nichols FAC Caruso 12 14-98 50 354 SRO 9 337-5076 Fish w/12-22 98 12-07 98 indian Pt 2 Requal Kenny Kenny 50-247 337 5287 D' Antonio 12 07 98 indian Pt 3 Requal D' Antonio Kenny 50-286 337-5085 D' Antonio 01 25 99 Calvert RO 5 initial Williams J. Hornick FAC Briggs 50-317/318 SRO 5 337-5124 D' Antonio SROU 1 01-25-99 Vermont RO 5 , initial Fish B. Finn FAC Caruso 50-271- SROI 1 337-5369 Dennis SROU 1 02 22 99 Salem Ro 8 initial Biesett J. Nichols FAC Silk 03-01-99 50-272/311 SRO 8 337-5266 609 339-3769 Fish 03 15-99 Limerick RO 5 initial Williams P. Orphenos FAC Sisco 50-352/353 SROI3 337-5124 610-718-4010 Dennis SROU 1 03-22-99. Beever V 2 RO 3 initial Brio 9s R. Undsey FAC Caruso 50-412 337-5366 OS-10-99 Susque SROI 4 initial Bri90s R. DeVore FAC Vogt-50-387/388 SROU 1 337-5366 570-542- Lowell 3882t Caruso May 10, .. Vermont Y RO 1 initial Williams , 'tosokamp FAC Williams 1999 50-271 RO 1 337 5124 , 't-258-4161 (w/rtk)

May 24, Oyster Requal Williams Caruso 1999 50-219 337 5124 f

L

< 2 l

06-14-99 indian Pt 2 R0 7 initial Kenny L. McNeal NRC D' A ntonio 06/21/99 50-247 SROI2 337 5287 JD Fish SROU 2 07 05 99 Limerick / LSRO 10 initial Dennis Orphanos Fac Sisco 07/12/99 Peach Bot 337 5240 718 4010 1 50 352/353 -

50-277/278 08-02 99 Beaver 1 Requal K.nny Fish 50-334 337-5287 I 08 23 99 Salem Requal Kenny Fish f.8/30/99 50-272/311 337-5287 1

08-30-99 Oyster SROI10 Initial Briggs J. Vecerto FAC D' Antonio 50-219 337-5366 Caruso 09 13 99 Peach Bot S/R 8 initial Williams L. MacEntee FAC Dennis 50-277/278 337-5124 Sisco September Hos;o Creek ROeSRO Initial Beiggs NRC Caruso l 27,1999 50-354 Retake (Retake) 337-5366 (Caruso) l l

i l

1 i

f

i

)

)

I l

Reaion i FY - 2000 l POWER REACTOR EXAMINATION SCHEDULE I JUNE 1.1999 Eram wgek . FacWty/ W Type of Chief Examinor Mant Contact Roulon Realonal M Docket No. Candidates Enam Name/ Phone No, Name' Phone No. [M E mandners  ;

si att.J.nald l Effort l l

10/04/1999 Ginna Requal P. Bissett J. Maciuska Caruso )

50-244 337 5266 717-771-6651 l 10/04/99 Pilgrim Requal Dennis Dennis 50-293 337-5.240 Fish 10/25/1999 Calvert Cl;ffs Requal L. Briggs B. Bemie J. D' Antonio ,

50-317/318 337-5366 410-495 2363 11/01/1999 Seabrook Requal T. Kenny Dan Roy T. Fish 50443 337-5287 603 773 7602 11/01/1999 Nine Mile 2 Requal P. Bissett J.Toothaker C. Sisco 50410 337-5266 315-349-2161 12/06/1999 Nine Mile 2 R5 13 initial J. Williams J. Reed Fac S, Dennis 12/13/1999 40410 17 337 5124 315-349-2155 C. Sisco U1 12/13/1999 Limerick Requal T. Kenny P. Orphenos J. Caruso 50-352/353 337 5287 610-7184010 1 '

01/10/2000 '

Salem R 20 Initial J. D' Antonio G. Blinde Fac B. Maler 01/17/2000 50-272/311 10 337 5085 609-339-3954 T. Fish I 8 U2 01/24/2000 Beaver Val 1 R 61 Initial D. Silk T. Kuhar Fac L Briggs j

  • Moved to 50-334 S6 337-5372 412-393-5719 J. Caruso FYO1 02/07/2000 TMi-1 R9 9 initial P. Bissett R. Parnou Fac S. Dennis 50-289 337-5266 717-948-2022 02/14/2000 Nine Mile 1 RS 11 initial J. Williams Fac C. Sisco 50-220 16 337-5124 T. Fish 03/13/2000 Seatwook U8 8 initial D. Silk T.Cassidy Fac J. Caruso 50443 337-5372 603 773-7651 03/13/2000 Mitstone 3 R2 12 initial L. Briggs R. Luenberg Fac J. D' Antonio 03/20/2000 50423 19 337 5366 860-437 2885 S. Dennis U1 04/03/2000 Limerick R3 9 inittel P. Bissett P. Orphanos Fac H. Williams ,

04/10/2000 50-352/353 14 337-5266 610-718-4010 B. M aler l U2

E L *' a-

.. ((

r.

2 05/01/2000- Pegrim R5 10 Initial S. Dennis Fac T. Fish 50-293 S 5 -' 337 5240 C. Sisco q

05/01/2000 e Ginna - R2 5' /n/t/a/ - D. Silk F. Maciuska Fac J. Caruso 50-244- I l' 337 5372 716-771-6651 J. D' Antonio U 2-05/29/2000 Susque R6- 9 initW L. Briggs - A. Fitch Fac J. D' Antonio Pot 6/19 50-387/388 S3! 337-5366- 717-542-3510 T. Fish 05/29/2000 Hope Creek A5 12 initial J. Williams B. Havens Fac P. Bissett 06/05/2000 50-364 S7 337 5124 609-339 3797 W . M aler 07/17/2000 Vermont Yan R6 8 initial J. Williams . M. Gosskamp Fac S. Dennis ,

Pot. 9-10/00 50-271- S2 337-5124 802-2584161 C. Sisco  !

07/31/2000' indian Pt 2 R6 12 initial P. Bissett L. McNeil . Fac B. M aier 08/07/2000- 50-247- I6 337-5266 914 271-7200 T. Fish 08/07/2000- Minstone 2 R4 12 initial D. Silk B. White Fac L. Briggs 08/14/2000 50-336 I8 337-5372 860437-2801 J. D' Antonio U0 08/14/2000 ' andian Pt 3 : S/R Initial D. Silk B. Christman Fac L. Briggs

'M:ved to 50-286 12 337-5372 914-788-2904 J. Caruso 11/06/00 at 11/13/00' 09/11/2000 Peach Bot S/R 8 Initial J. Caruso J. Armstrong NRC S. Dennis 50-277/278 8 337-5389 717456-7014 C. Sisco

. X3059 09/25/2000 Calvert C8ffs R3 8 initial J. Williams J. Nomick Fac L. Briggs 50-317/318: 13- 337-5124 4104954789- J. D' Antonio U2 Sum' 159 Count - 15 O

,p-

4 8

l'Y 1999 RI'GION II EXAMINATION SCIIEDULE Revised May 5.1949

.nm 9/28/98 Sequoyah 4SROU lastial U. Harper W. Huna Facwty Happer M 177 40s/562-4645 615/A414152 (Ran/M 10/5N8 Brunswick Requal L.Mellen H. Wall Mellen 5G 325 inwerke M5624Cl 910 457-??!3 10/5/98 Harru 2 RO lastaal R. Aiello R. Garner Facihty Aiello 50400 5SRO! 408/562 4641 919/362-3313 Stemer Ernstes 10/19/98 Crystal her Requal C. Payne K. McCall Payne SG 30' tenection 404 '56? A669 15?!5614%st 11/16/98 Oconec hutial Prep O. Happer P. Stovan Facility Happer 54269 404/562 4 645 864/885-33M Menen Ernstra 11/16/98 St. Lucie faitaal Ptep R. BaMwin Dennis Faddco facility BaMwin 50 335 404/562 4 642 561/467-7014 Aiello Steiner i1/16/98 Watta Bar Requal C. Payne John Roden Payr M390 _

innocetmn 404/562 4669 423 365-89R0 11/30/98 Oeunce 2 RO hutaal G. Hopper P. Stovall Facility Hwper 54269 5SROU 404/562 4645 864/885-3307 Melica Ernatra 11/30/98 St. Lancie 6RO Lutaal R. Baldwin Dennis Fadden Facility BaMwin 12/14/98 M335 3 SRO! 404/562 4642 Ml/467-7014 Aicilo sicmer

{

11/30/98 Catawbe Requal C. Payne S. Bradahaw Payne 504I1 In.ncetion 40s'567 4 669 Rol'pi t .it to 1/11/99 McGuire hutsa! Prep C. Payne A. Orton Payne 50 327 404/562 4 669 704/875-5397 Sicinct

/fM i/25/99 Crystal River Initial Prep O. Hopper K. McCall Hgper 54302 404/562 4645 352/5634 948 McAlce (kn/m f/25/99 McGuire 6RO laitaal C. Payne A. Orton Facihty Payne 2/1/98 50-327 3 SROI 404/562-4669 704/875-5397 Seeiner 4

7 SROU (fmJJ 1/25/99 Robinaan Requal M. Fenstes T. Natale Penates M761 Inspection 404/567 4617 803/A57-1823 2/8/99 Crystal her 6 RO laitial O. Happer K. McCan Facihty Harper 2/22/98 54302 5SROI 404/562-4645 352/56.14 948 (Bar*y)

Willem 2/1/99 Harris Requal R. Baldwin R. Garner Baldwin 50400 InspecGm 404/567-4647 919/362-3113 3/l/99 Tudey Pt. 4138 B. Holbrod P. Finegan Habrook 54250 404/567 4672 305/2414231 Siemer 3/15/99 Robinaan Tl-138 B. Holbrod T. Natale Holbrud 50 261 404'562 4672 903'957.1125 hbr 3/15/99 Surry laitial Prep it. BaMwit's H. McCalhan Baldwin

$4280 404/562 4642 757/365-2638 Metha Psyne 3/15/99 St Lucie Trainin8 Insp R. Aieno Dennis FadJen Aiello IP41500 404/562-4641 Harper Sartor 3/29/99 Surry 5RO Initial R. BlaMwin H.Me(Jum racihty Baldwin i 4/12/99 54280 2 SROI 404/562 4 642 757/365-2638 Meuca 5 SRotr Payne l

l l

8

" ' * " b""#"' '"" *" ki,, v., n, -

" " " ^ " ' " " "

b "'" " * ""

3/29/99 Watts Bar laitial Prep M. Ernstes John Roden Ernstes

$4390 4M/5624632 423-365 8980 Aiello an) 4/12/98 Waas Bar 5 RO Inasal M. Dustes John Roden Facility Ernstes 54390 2 SROI 404/562 4632 423-365-8980 Aiello 5 SROf f dar s 4/26/99 Tsiley Initial Prep O. Hopper B. OlFicki Harper S 348 4W/5624645 334/899-5156 Payne Gn/

Catawba Initial Prep R. Aiello T. Beadle Saciner 5/10/99 50413 404/562 4 641 803/831-3000 Aiello McIlen Farley 6 SRO! Initial O. Hopper B. Olfiekt FaciLty Hopper 5/10/99 iSROU 404/562 4 645 334/899-5156 Payne 54348 an)

Catawba 7 RO laitial R. Aicuo T. h6 Facihty Siemer 5/24/99 6 0/99 50413 5 SRoi 404/562-4641 803/831-3000 Aicuo 3 SROU Metlen 5/24/99 McGurie 1RO Rende R. Aicuo A. Ortim Facility R. Aiello M177 4W56?4M I 7N 't75-5397 Oconee Requal C. Payne P. Slovall Payne 5/31/99 M 269 fnweetinn 40t/5674669 RM/R#5 3107 Sunumer Requal O. Hopper A. Koon Hopper 6/7/99 50 395 Inspection 404/%24M5 803/931 5120 6/28/99 St. lacie 5 RO(RT) Initial Prep / R. Baktwin Dennis Fadden Fuility Baktwin 50 335 3 SROI laitial-Wnuen 404/562 4642 561/467 4 014 Hopper 2 SROU Retate-Wnaea Robinson laitial Prep M. Ernstes T. Natale Ernates 7/12/99 54261 404/M24632 803/857-1825 Meuca Steiner McGuire 1 RO Retake DalJwin A. Orton Facihty Baldwin 7/19/99 54327 Operating Test 404/562-4642 706/875-5397 3 RO laitial M. Ernstes T. Natale Facility Ersates 7/26/99 Rotlasca 404/5624632 803/857-1825 Menen

$4261 2 SROI 2 SROU Skiner St I.mek; Initial / Retake R. Baktwin D. Fadden Facilsty Baldwie 8/9/99 2 SROU 404/562 4 642 561/467-7014 Hopper 54M5 iSROI Operatag Test i ROntT) faitial Prep Aieno P. Fine 8an AieGo 8/16/99 Turkry Point 404/M2-4641 305/243-6833 Ernstes 54250 seemer Sequoyah Requal Melles W. Hunt Menen j 8/23/99 54377 laspection 404/567 4 531 615/84MI58 Requal C. Payne H. McCaDuin Payne 8/23/99 Surry j 54280 EW- 404/562 4669 757/365-2638 Requal O. Hopper B. Brown Hopper 8/23/99 Vortie I 50424 laspection 404/% 2 4645 706/826-3901 20 RO laitial Aicuo P. F'me8an Facility Aicuo 8/30/99 Turkey Point 404/M24641 305/2434833 Ernstes 9/13/99 54250 8'*i"

laitial Prep O. Hopper A. Koun Hopper 9/13/99 Sumsner 404/562 4645 803/931 5120 Baldwin 54395 Menen f

O. Hopper A. Koon NRC Hopper 9/27/99 Surnmer 4 RO Initial 408/%24645 803/931-5120 Baktwin 54395 Mellen

$ 4 l'Y 2000 REGION II EXAMINATION SCllEDULE l Revised Arn! 15,1999 l l

f

      • ?* '* * ' * " ***** _

$* ' ""*; ","$k $?"* ,

a 10/4/99 Hatch Imdal Prep C. Payne S. Grantham C. Payne 54321 404/562 4669 912/367-7857 R. Aicuo M Emntre 10/18/99 Hatch 10 SROI laidal C. Payne S. Grantham NRC C. Payne i 11/1/98 54321 2 SROU 404/5624669 912/367-7857 R. AieUo i M Prmtes )

11/8/99 Crystal River Requal O. Hopper W. Young G. Harper  ;

j 94302 tmecction 404/%?4M4 3 4?n954 f fr7 11/13 12/13/99 Browns Ferry Requal TBD R. Gampion TBD 54260 Inspection 256/7?9.1957 11/29/99 Vogtle Initial Prw R. Bakfwin B. Brown R. Baklwm 54424 4M/5624642 706/826-3901 P. Steener M Sykes 12/6/99 St. Lacie Requal O. Happer D. Fadden G. Hgper 54335 Inspection 404/562 4 645 561/4644 161 R. Acillo M Pmstan 1

12/13/99 Vogtle 3RO Ini6al R. Baktwas B. Brown NRC R. Bah m 1 i

54424 5SROI 404/M24642 706/826-3901 P. Steiner 7 SROf f M hken l I/142/14/00 Parley Requal TBD J. Deaver TBD i M 348 tranectim 314/814 4524 l l

I/142/7/00 Turkey Point Requal TBD P. Finegan TBD 50 7so f a meetim 105r?46 6476 1/31/00 Brunswick laidal Prry G. Hgper M. Herrell 0 Hopper 54325 404/% 24645 910/457 3059 R. Aiello 1.. Mellen 2/ 3/00 Nor1h Anna Requal TBD A. Royale TBD 50 33e inanectim 540/804-2446 2/14/00 Brunswick 12 RO Initial G. Hopper M. HerrcHI NRC O. Hopper 2/21/00 50-325 4 SRol 404/562 4 645 910/457-3059 R. Aiello L u,n,n 4/24/00 Farley Initaal Prep M. Ernseca J. Deavers M. Ernstes I 54348 404/562 4 643 334/899- M. Sykea 5156r6115 P tra' 4/24/00 McGuare laitial Prey C. Payne A. Orton C. Payne 54369 404/562-4669 704/875-5397 P. Seeiner L nartneve 5/8/00 Farley 6RO laidal M. Ernstes J. Deavers NRC M. Ernsees 5/22/00 54348 6SROI 404/562 4 643 334/899-5156 M. Sykes ittra*

5/8/00 McGuus 6RO laidal C. Payne A.OAm Ucenace C. Payne 5/22/00 50 369 2 SROI 404/M24669 704/875-5397 P. Secamer 5 SROtf L Rattlev*

1 L Menen 5/29/00 Bmwas Perry laisia! Prep L Menen R. nampson 54259 404/562 4 531 R. Baktwin n mahrtua* i 6/12 7/14/00 McGume Requal TBD A. Orton TBD mue --c.- 704/975.5397 6/12/00 Browna Ferry 10 RO lasdal L Mellen R. Champion NRC L Meuen 6/26/U0 54259 3 SROI 404/M24531 R. Baldwin 1 RRotf n mehrmA*

Oconce laitial Prep O. Hopper P. Slovalf G. Hopper 6/26/00

$4269 404/562 4 645 864/885-33M R. Aiello n salvers **

O i

l

  • " " " b**'* ' E "*"* b. .. .. .m f" 'i^"*- bff*E  !**

7/10/00 Ocmec 8 RO In16a! O. Hopper P. Slovall Licensee G. Hopper 1 7/17/00 54269 2 SROI 404/562/4645 8M/885-3307 R. Aicuo I 3 EROff G Lhers** I 7/24/00 Summer in 6al Piep M. I:rnstes A. Kuun M. Dustes

$4395 406/362 4 643 803/931 5120 M. Sykes n mrbra

  • 7/24/00 Sequoyah in hal Prep C. Pnne W. Hunt C. Payne i 54327 4 % %24069 423/8434158 L. Melke l P f n*

8/00 Hasch kequal TBD S. Grantham TBD insocction l 8n/00 Summer 8SROU Inahal M. Einstes A. Koon NRC M. &nstes 54395 404/5624M3 803/931 5120 M. Sykes B. Rotbnnk' 8/7/00 Sequoyah 4RO laitial C. Payne W. Hunt Licennec/NRC C. Payne j 54377 3 SROI 404/%24669 423/8434158 L. Mellen P. f_ca*

8/14/00 Crystal River laiual Prep P. Steurr K. McCall P. Siemer 54302 404/562 4 648 352/ % 3 4998 0. Hopper j J. Barticy*

8/28/00 Crystal River 3RO Ini6al P. Steiner K. McCall Licensee P. Steiner 9/11/00 50 302 3 SROI 404/562 4648 352/563-4998 0. Hopper ,

1 SROtf J. Rarticy* l 9/11/00 North Anna Inshal Prep R. Aiello A. Royale R. AieDo 54338 404/%24M t 540/894-2446 M. Ernstes C. Payne 9/11/00 Surry ladial Prep R. Baldmin H. McCallum R. Bakiwin 54280 404/562 4642 757/365-2638 L. Mellen M. Sykes 9/25/00 North Anna 7RO Ininal R. Aiello A. Royale Liccusec/NRC R. Aielk) 10/2/00 54338 1SROI 404/562 4 641 540/894-2446 M. Ernstea 3 SRoll C. Payne 9/25/00 Surry 8RO Ins 6al R. Daktwin H. McCalhun llenace/ NRC R. Baktwin 10/2/00 54280 2 SROI 404/ % 24642 757/365-2638 L Menen 3 SROU M Svtes FY XDi i1/13/00  % Lucie laidal Prep C. Payne D. Fadden Payne 54335 404/% 24669 MI/4684161 Baldwun AietL 11/13/00 Turkey Point Ini6al Prep O. Happer P. Finegan O. Hopper 54250 4061 % 2 4 645 305/24MA33 P. sieuxr M.Svken 11/27/00 Harris laitial Prey M. Ernsics R. Ontner M. Ernnes 50400 404/562 4643 919/% 2-3313 L. Mellen O. salvers **

12/4/00 St. Imie 4 SROI laitial C. Pey.ne D. Faddca Ucenace Payne 50 335 53ROU 404/ % ? 4 645 %I/468416i Baadwin nu 12/4/00 Turkey Point 16 Ini6al G. Hopper P. Finegan NRC O. Hopper 12/18/00 54250 404/ % 24 645 305/246 6833 L Meuce M. Svtes 12/11/00 Harris 3 RO Initial M. Ernstes R. Carner Licenace M. Ernsies 54400 2 SRO! 404/M24643 919/362-3313 L Melke 3 SROU O.SalYeM**

3/26/01 Robinson 7RO laitial TBD A. Williams TBD TBD 5a761 5 SROil 841/R 57.1450 4/01 Catawba 18 lainal TBD T. Bede Licenace TBD 54413 803/831-3000 ext $427

a e

in p> m en en 49 mmAns AUTuus e ammonAL Mand M DATB ese OFCANDIDAfts FM_2J.fVs

- Deter? 100 # m--~-.. G. .UIP

. MA&d.pSR.

m. . . R..JWr.F.m_WTM,*f.,

m m .

. R. ,AWD.el.RS SMI Waus Bar 7RO laitial TBD J. Roden Liernace TBD 54390 3 SROI 423 S 65-3757 6 SROU 8/01 Vogde 10 laitial TBD B. Brown NRC TBD S M 24 706/R76-3HH

  • DRP thanuner support
    • llP inspeciar mccrtafied as camminer i

i l

i i

l i

l

a

~

2.0 GENERIC KNOWLEDGES AND j ABILITIES 2.1 Conduct of Operations  !

2.1.1 Knowledge of conduct of operations requirements.

(CFR: 41.10 / 45.13)

IMPORTANCE RO 3.7 SRO 3.8 2.1.2 Knowledge of operator responsibilities during all modes of plant operation.

(CFR: 41.10 / 45.13)

IMPORTANCE R O 3.0 SRO 4.0 2.1.3 Knowledge of shift turnover practices.

(CFR: 41.10 / 45.13)

IMPORTANCE R O 3.0 SRO 3.4

]

2.1.4 Knowledge of shift stamng requirements. i (CFR: 41.10 / 43.2)

IMPORTANCE R O 2.3 SRO 3.4 2.1.5 Ability to locate and use procedures and directives related to shift stamng and activities.

(CFR: 41.10 / 43.5 / 45.12)

IMPORTANCE R O 2.3 SRO 3.4 2.1.6 Ability to supervise and assume a management role during plant transients and upset conditions.

(CFR: 43.5 / 45.12 / 45.13)

IMPORTANCE RO 2.1 SRO 4.3 2.1.7 Ability to evaluate plant performance and make operationaljudgments based on operating characteristics / reactor behavior / and instrument interpretation.

(CFR: 43.5 / 45.12 / 45.13)

IMPORTANCE RO 3.7 SRO 4.4 2.1.8 Ability to coordinate personnel activities outside the control room.

(CFR: 45.5 / 45.12 / 45.13)

IMPORTANCE RO 3.8 SRO 3.6 2-1 NUREG-1123, Rev. 2 l l

-