ML20153F805

From kanterella
Revision as of 00:05, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Licensee Meeting with Util on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp
ML20153F805
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/23/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9809290257
Download: ML20153F805 (6)


Text

. . . - -. . -. . ~ . . .. - . . . . - .

s.9REQu s

k UNITED STATES l [#

- # p, NUCLEAR REGULATORY COMMISSION HEGION IV

! tj j l S c 611 RYAN PLAZA DRIVE. SUITE 400 ARLINGTON. TEX AS 76011 8064

% * * . . . ,e l SEP 2 31998 -

NOTICE OF LICENSEE MEETING Name of Licensee: Entergy Operations, Inc (EOl)

Name of Facility: Waterford 3 Docket: 50-382 Date and Time December 16,1998 of Meeting: 1-3 p.m. (CST) -

Location of Meeting: Region IV office, Arlington, Texas Training Conference Room, Fourth Floor Purpose of Meeting: Discuss the actions being implemented in the Performance Improvement Plan for selected weaknesses identified during the Architect Engineer inspection NRC Attendees: Ellis W. Merschoff, Regional Administrator Thomas P. Gwynn, Director, Division of Reactor Projects (DRP)

John N. Hannon, Director, Project Directorate IV-1, Office of Nuclear Reactor Regulation (NRR)

Arthur T. Howell, Ill, Director, Division of Reactor Safety (DRS)

Phil H. Harrell, Chief, Project Branch D, DRP Thomas Stetka, Acting Chief, Engineering Branch, DRS Chandu Patel, Project Manager, Project Directorate IV-1, NRR Greg Pick, Senior Project Engineer, Project Branch D, DRP Licensee Attendees: Chuck Dugger, Vice President, Operations Ted Leonard, General Manager, Plant Operations Al Wrape, Director, Engineering Early Ewing, Director, Nuclear Safety and Regulatory Affairs Greg Pierce, Director, Quality Mike Brandon, Acting Manager Licensing NOTE:

l (1) :This meeting is open to attendance by members of the general public, i

-(2) NRC personnel, not listed above, that desire to attend this meeting should notify Phil Harrell at (817) 860-8250 by COB on December 11,1998.

Approved By #[ [

,,, Tho/nas P.G' wydn,6irector Division of Reactur Projects 9809290257 980923 "?

PDR ADOCK 05000382; 6 G-PDRf

- . . - . . . . . - . . . . . - . . - - . . . . - -_ . - , . - . . . . ~ . . - ....~ . .- -- .

s p

lt ..

. Entergy Operations, Inc. '

p l cc:

. Charles M.' Dugger, Vice President

.: Operations - Waterford 3 -

- Entergy Operations, Inc.

P.O. Box B -

- Killona, Louisiana 70066.

. Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995
Vice' President, Operations Support -

t Entergy Operations, ince P.O. Box 31995

~ Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway <

P.O.' Box 651 .

? Jackson, Mississippi 39205 General Manager, Plant Operations

' Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B Killona, Louisiana .70066 Manager - Licensing Manager

. - Waterford 3 SES Entergy Operations, Inc.

P.O. Box B 1 Killona, Louisiana 70066-Chairman Louisiana Public Service Commission One American Place, Suite 1630 y Beton Rouge, Louisiana 70825-1697 Director, Nuclear Safety &.

^ y . Regulatory Affairs

Waterford 3 SES L "Entergy Operations, Inc.

P.Ce Box B Killona, Louisiana 70066 i

~. .. - - . _ . . - . ... - ~ . - . . . . . - . - - . -. .. .- . . . , .- -- . ,

Entergy Operations, Inc.' .

l :-

William'H. Spell, Administrator Louisiana Radiation Protection Division

' P.O. Box 82135.

. Baton Rouge, Louisiana 70884-2135

. Parish Pr'esident St. Charles Parish P.O. Box 302 1

~ Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office  :

1- .

3 Metro Center ,

' , Suite 610 +

. Bethesda, Maryland 20814  !

Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502.

I i

e i

(.

e I

g

_,_ , , , y ,en -. ~ '

o e Entergy Operations, Inc. SEP 2 31998 E Mail To: FOR

() - NRC Attendees PMNS Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR BWS Acting, ADT/NRR BAB2 Acting ADP/NRR OEMAll D/OE LJC OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GMV M. Vasquez, Acting EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAT, DLF, JES4 DRP Div;sion CLG, LMB, NLH DRS Division CMS, CAM 3, WSW ~ DNMS Division LSO L. Ousley LPL- P.Longdo cc:

W Iis}Y i OEDO RIV Coordinator (16E15)

. ORA File RIV File DRP Filo i

'][. C Cll d DOCUMENT NAME: R:\_WAT\WT1216MN.DRP /

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N* = No copy RIV:PE:DRP/D l C:ORP/D PAO l RSLO l D:Qft$ l GAPick* PHHarrell* BWHenderson* CAHackney* ATWhell 9/10/98 9/16/98 9/17/98 9/17/98 (BWH) 9//OlbM D:DRP -

TPGwynn /, , r"fo 9/7/98 // 1

  • Previously Concurred OFFICIAL RECORD COPY i

u

l

, Entergy Operations, Inc.  !

SEP 2 31998 E-Mail To: FOR

() NRC Attendees PMNS Mtg Announcement Coordinator JKM DEDE PAB DEDR I FJM A/D/NRR BWS Acting, ADT/NRR l

BAB2 Acting ADP/NRR OEMAll D/OE LJC OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO -

l GMV M. Vasquez, Acting EO i BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAT, DLF, JES4 DRP Division CLG, LMB, NLH . DRS Division CMS, CAM 3, WSW DNMS Division LSO L. Ousley LPL P.Longdo cc:

DMB (IE 45) 1 OEDO RIV Coordinator (16E15)

ORA File RIV File DRP File DOCUMENT NAME: R:\_WAEWT1216MN.DRP /

To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" =flo copy RIV:PE:DRP/D C:DRP/D PAO RSLO D:Qld GAPick* PHHarroll* BWHenderson* CAHackney* ATM4 ell 9/16/98

= = = = = =

9/16/98 9/17/98 ammansummanmensmesmesumuss samma { 9 1 s ===mu D:DRP ,

TPGwynn / , Ma a 9/ 7198 /)

  • Previously Concurred OFFICIAL RECORD COPY

hl ., ..

- - - .. ,s -- icic l

Entergy Operations, Inc. l-E-Mail To: FOR

(-). NRC Attendees PMNS Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR BWS Acting, ADT/NRR BAB2 Acting ADP/NRR OEMAll D/OE LJC OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GMV M. Vasquez, Acting EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAT, DLF, JES4 DRP Division CLG, LMB, NLH DRS Division CMS, CAM 3, WSW DNMS Division LSO L. Ousicy LPL P.Longdo cc:

DMB (IE 45)

OEDO RIV Coordinator (16E15)

ORA File RIV File DRP File lY DOCUMENT NAME: RA_WAT\WT1216MN.DRP /

To receive copy of document, indicate in bar: "C" = Copy without enclosures "E" = Copy with enclAures *N" = No copy RIV:PE:DRP/D C:DRP/D . , PAO d RSLO / D:DRP GAPickW PHHarreff0W BWHenderson CAHackney TPGwynn m 9/W98 9/lb/98 9/l1/98 941/98 9/ /98 W OFFICIAL RECORD COPY l