ML20154P635

From kanterella
Revision as of 12:43, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Rev 1 to Licensee Meeting 88-143A on 881003 W/Util in King of Prussia,Pa to Discuss Licensee Action on Radiation Protection Program Weaknesses Described in Recent SALP Rept.Agenda Encl
ML20154P635
Person / Time
Site: Pilgrim
Issue date: 09/26/1988
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8810030125
Download: ML20154P635 (3)


Text

. - _ - - _ - _ _ _ _ _ _ _ _ _

SEP 2 61988 No. 88-143A (Revision 1)

U.S. NVCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee: Boston Edison Company Name of Facility: Pilgrim Nuclear Power Station Docket No.: 50-293 I

Time and Date of Meeting: 10:00 a.m., October 3, 1988 l l

Location of Meeting: Region I Office, King of Prussia, Pennsylvania Division of Radiation Safety and Safeguards Conference Room (DRSS)

Purpose of Meeting: Discuss Licensee Action on the Radiation Protection Program Weaknesses Described in the Recent Systematic Assessment of Licensee Performance (SALP) Report NRC Attendees: S. Ebneter, Director, Division of Radiation Safety and Safeguards (DRSS)

R. Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch, DRSS "

M. Shanbaky, Chief, Facilities Radiation Protection Section, FPSt*8, DRSS

  • T. Dragoun, Se:,ior Radiation Specialist, DRSS J. Wiggins, Chief, Reactor Projects Branch No. 3, Division of Reactor Projects (DRP)

R. Blough, Chief, Reactor Projects Section No 3B, DRP L. Doerflein, Project Engineer, Reactor Projects Section No. 3B, DRP R. Wessman, Director, Project Directorate I-3, Office of Nuclear Reactor Regulation (NRR)

D. Mcdonald, Project Manager, NRR Licensee Attendees: R. Bird, Senior Vice President-Nuclear H. Highfill, Station Director R. Sherry, Maintenance Manager J. Jens, Radiological Section Mariager R. Ledgett, Special Projects Director M R. Grazio, Regulatory Section Manager J. Alexander, Operations Manager Attendance by NRC personnel at this meeting should be made known by of

$o Note:

September 30, 1988, via telephone call to R. Blough, Region I, at g FTS 8-346-5146 or (215) 337-5146.

CAIGINAL SIGNED By Ng oo Prepared By:

Q4 A. Randy Blough, Chief o Reactor Projects Section No. 3B

$$o 0FFICIAL RECORD COPY MEETING NOTICE 88-143 - 0001.0.0 /,[

09/25/88

e F

Meeting Notice No.88-143 2 8EP 2 s 1900 Distribution:

V. Stello, Jr., Executive Director for Operations J. Taylor, Deputy Executive Director for Regional Operations B. Grimes, Acting Director, Division of Reactor Inspector & Safeguards, NRR J. Lieberman, Director Office of Enforcement L. Chand1r.r, Assistant General Counsel for Enforcement T. Murle.v. Director, Office of Nuclear Reactor Regulation F. Miraglia, Associate Director for Inspection & Technical Assessment, NRR S. Varga, Director, Division of Reactor Projects I-II, NRR B. Boger, Asristant Director for Region I Reactors, NRR R. Wr.ssman, Director, Project Directorate I-3, NRR D. Mcdonald,' Licensing Project Manager, NRR B. Clayton, Regional Coordinator, EDO Comonwealth of Massachusetts (2)

W. Griffin, Plymouth Board of Selectmen Hanorable William B. Golden, Massachusetts State Senator NFC Resident Inspector Public Document Room (PDR) local Public Document Room (LPDP.)

bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs State liaison Officer Region I Receptionist Public Affairs Officer DRP Files Bulletin Board M. J. DIDonato DRP DRMA Files RI:DRF RI:DRP RBlough/mjd Wiggins 9/K/89 9/ll/88 0FFICIAL RECORD COPY MEETING NOTICE 88-143 - 0002.0.0 09/25/88

7 AGENDA NRC-BECo Meeting on September 26. ItS8 Opening Remarks Olscussion of Purpose of Meeting NRC Presentation by Licensee to Include the Major BEco Initiatives, Expected Results, and Timetables for:

1. Methods to achieve substantial reductions in personnel exposures.
2. Initiation of performance based audits and comparisons to industry performance.
3. Improvements in vertical communications and morale in the Radiation Protection Section.
4. Improvements in RP staff qualifications and organizational stability.
5. Additional enhancements in relations between Engineering, Maintenance and Radiation Protection sections.

Discussion of Additional Issues / Questions if Needed NRC l Closing Remarks NRC i

f i

OFFICIAL RECORD COPY MEETING NOTICE 88-143 - 0003.0.0 i 09/25/83

~