ML20269A183

From kanterella
Revision as of 18:22, 7 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
GE Hitachi Nuclear Energy - ESBWR Design Certification 10 CFR 50.46 Annual Report - 2020, Emergency Core Cooling System Model
ML20269A183
Person / Time
Site: 05200010
Issue date: 09/25/2020
From: Michelle Catts
GE Hitachi Nuclear Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
M200131
Download: ML20269A183 (4)


Text

GE Hitachi Nuclear Energy Michelle P. Catts Senior Vice President Nuclear Programs 3901 Castle Hayne Road P.O. Box 780 M/C A-18 Wilmington, NC 28402 USA T 910 200-9836 Michelle.Catts@ge.com M200131 Docket 52-010 10 CFR 50.46 10 CFR 50.46(a)(3)(iii) 10 CFR Part 52, Appendix E September 25, 2020 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

ESBWR Design Certification Annual 10 CFR 50.46 Report for 2020 GE Hitachi Nuclear Energy (GEH), as the applicant for the ESBWR Design Certification (10 CFR Part 52, Appendix E), submits this annual report under 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Reactors." Specifically, is the 2020 annual report for the ESBWR Design Certification for emergency core cooling system (ECCS) evaluation model changes or errors that affect the peak cladding temperature (PCT) calculation. There is no change to any reported analysis results.

By this letter, GEH also notifies the licensees, DTE Electric Company for Enrico Fermi Nuclear Plant Unit 3, and Dominion Virginia Power for North Anna Unit 3, in accordance with 10 CFR 50.46(a)(3)(iii), because the licenses for these units reference the ESBWR Design Certification.

Please contact me if you have any questions regarding this information.

Sincerely, Michelle P. Catts Senior Vice President, Nuclear Programs

M200131 Page 2 of 2 September 25, 2020 Commitments: No additional commitments are made.

Enclosure:

1. ESBWR Design Certification 10 CFR 50.46 Annual Report - 2020 cc: N. Otto, NRC J. Colaccino, NRC M. Brandon, DTE R. Westmoreland, DTE D. Aitken, Dominion C. Sly, Dominion DBR-0033424 R5

Enclosure 1 M200131 ESBWR Design Certification 10 CFR 50.46 Annual Report - 2020

M200131 Page 1 of 1 ESBWR Design Certification 2020 Annual Report Under 10 CFR 50.46(a)(3)(iii)

Emergency Core Cooling System Model Plant Name: ESBWR Design Certification (Docket 52-010; 10 CFR Part 52, Appendix E)

Utility Name: GE Hitachi (as applicant for the ESBWR Design Certification)

Reporting Year: 2020*

Evaluation Model: TRACG Net PCT Absolute LBPCT Effect PCT Effect Analysis of Record Licensing Basis PCT 600°F (LBPCT), with prior updates Prior 10 CFR 50.46 Changes or Error Corrections A. PCT = +/- 0°F + 0°F

- Previous years Prior 10 CFR 50.46 Changes or Error Corrections B. PCT = +/- 0°F + 0°F

- This year (itemized below):

(None)

C. Absolute Sum of 10 CFR 50.46 Changes PCT = + 0°F + 0°F Projected LBPCT based on these changes 600°F

  • The reporting period is 9/30/2019 through 09/17/2020. The sum of the peak cladding temperature (PCT) from the most recent analysis using an acceptable evaluation model and the estimates of PCT effect for changes and errors identified because this analysis is less than 2,200°F.

Most Recent Previous Report (2019): Letter, M. P. Catts (GEH) to Document Control Desk (NRC),

M190171, ESBWR Design Certification Annual 10 CFR 50.46 Report for 2019, October 9, 2019.