ML20129E920

From kanterella
Revision as of 04:12, 23 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC RAI Re Proposed Amend to Licenses DPR-39 & DPR-48,removing Governing RCS Pressure & Temp Limit Requirements for Heatup,Cooldown,Low Temp Operation & Hydrostatic Testing from TSs
Date released: 05/22/2020 Download: ML20129E920


Rev 0 to Coms/Ltop Pressure Instrument Loop Accuracy Calculation.
ML20129E983
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 01/18/1996
From: Hallett C
COMMONWEALTH EDISON CO.
To:
References
Download: ML20129E983 (17)
Rev 3 to Wide Range RCS Cold Leg Temp Indication Uncertainty.
ML20129E975
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 10/18/1996
From: Hallett C
COMMONWEALTH EDISON CO.
To:
References
Download: ML20129E975 (16)
Rev 0 to Low Temp Overpressurization Protection (LTOP) Setpoint Calculation.
ML20129E949
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 05/14/1996
From: Evans D
COMMONWEALTH EDISON CO.
To:
References
Download: ML20129E949 (35)
Responds to NRC RAI Re Proposed Amend to Licenses DPR-39 & DPR-48,removing Governing RCS Pressure & Temp Limit Requirements for Heatup,Cooldown,Low Temp Operation & Hydrostatic Testing from TSs
ML20129E915
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 10/22/1996
From: Mueller J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20129E915 (7)