ML20132A791

From kanterella
Revision as of 20:06, 22 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-084/03L-0
Date released: 05/25/2020 Download: ML20132A791


/03L-0 on 790729:during Maint,Hpci Pump Suction Low Pressure Switch 2E41-N010 Found Inoperative.Caused by Ruptured Instrument Diaphragm.Instrument Replaced & Switch Tested Satisfactorily
ML20132A793
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/10/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20132A793 (1)
Forwards LER 79-084/03L-0
ML20132A787
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/10/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20132A787 (1)