ML20134A382

From kanterella
Revision as of 07:19, 21 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-443/85-26 on 850923-27.No Violation Noted
Date released: 05/27/2020 Download: ML20134A382


Insp Rept 50-443/85-26 on 850923-27.No Violation Noted.Major Areas Inspected:Preoperational Test Witnessing, Preoperational Test Procedure Review & Verification & Preoperational & Acceptance Test Results Evaluation Review
ML20134A389
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/25/1985
From: Briggs L, Eselgroth P, Wink L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20134A389 (13)
Forwards Safety Insp Rept 50-443/85-26 on 850923-27.No Violation Noted
ML20134A378
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/30/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: HARRISON R J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
Download: ML20134A378 (2)