ML20135H388

From kanterella
Revision as of 20:38, 19 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Evaluation Re Compliance W/License Condition 2.C.(12)(b),requiring Provisions or Mods to Assure That safety-grade Backup Means of RCS Depressurization Meets Requirements of Rev 1 to Branch Technical Position Rsb 5-1
Date released: 05/28/2020 Download: ML20135H388


Safety Evaluation Re Compliance W/License Condition 2.C.(12)(b),requiring Provisions to Assure That safety-grade Backup Means of RCS Depressurization Meets Requirements of Rev 1 to Branch Technical Position Rsb 5-1.Addl Info Needed
ML20135H389
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/12/1985
From:
NRC
To:
References
Download: ML20135H389 (10)
Forwards Safety Evaluation Re Compliance W/License Condition 2.C.(12)(b),requiring Provisions or Mods to Assure That safety-grade Backup Means of RCS Depressurization Meets Requirements of Rev 1 to Branch Technical Position Rsb 5-1
ML20135H387
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/12/1985
From: Varga S
Office of Nuclear Reactor Regulation
To: MCDONALD R P
ALABAMA POWER CO.
References
Download: ML20135H387 (2)