ML20136C358

From kanterella
Revision as of 16:20, 19 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Evaluation Accepting Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing Requirements in Existing Tech Specs for Reactor Trip Sys Components
Date released: 05/29/2020 Download: ML20136C358


Safety Evaluation Accepting Util 831104 & 850215 Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing Requirements in Existing Tech Specs for Reactor Trip Sys Components
ML20136C425
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/12/1985
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML20136C425 (2)
Forwards Safety Evaluation Accepting Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing Requirements in Existing Tech Specs for Reactor Trip Sys Components
ML20136C353
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/12/1985
From: Varga S
Office of Nuclear Reactor Regulation
To: MCDONALD R P
ALABAMA POWER CO.
References
Download: ML20136C353 (3)