ML20138G183

From kanterella
Revision as of 07:54, 17 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 960624 Ltr Requesting Rev to Relief Previously Granted to Licensee on 950808 from Requirements of 1986 Edition of ASME Boiler & Sys Pressure Tests Stated in IWA-5250.Proposed Alternative Acceptable.Ser Encl
Date released: 05/31/2020 Download: ML20138G183


SER Accepting Second 10-year Interval Inservice Insp Plan Request for Relief SPT-14,rev 1 Virginia Electric & Power Co North Anna Power Station,Unit 2
ML20138G193
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/16/1996
From:
NRC (Affiliation Not Assigned)
To:
References
Download: ML20138G193 (4)