ML20140H662

From kanterella
Revision as of 05:43, 16 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 97-024-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970409.Commitments Made within Ltr,Listed
Date released: 06/02/2020 Download: ML20140H662


:on 970409,miscoordination of Breakers Caused Loss of QA to non-QA Isolation.Caused by Inadequate Original Design,Mod Review & Commitment Tracking.Conducted Training for Electrical Engineering Personnel Coordination Issues
ML20140H664
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/09/1997
From: Robert Walpole
NORTHEAST NUCLEAR ENERGY CO.
To:
References
Download: ML20140H664 (3)
Forwards LER 97-024-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970409.Commitments Made within Ltr,Listed
ML20140H657
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/09/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20140H657 (2)