ML20148B254

From kanterella
Revision as of 21:58, 14 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 78-054/01T-0
Date released: 06/10/2020 Download: ML20148B254


/01T-0:on 781017,differential Pressure Between Drywell & Torus Could Not Be Established W/O High Leakage Rate.Caused by Improper Setting of Drywell Vacuum Breaker Valves.Valves Repaired
ML20148B255
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/24/1978
From: Nix R
GEORGIA POWER CO.
To:
References
Download: ML20148B255 (2)
Forwards LER 78-054/01T-0
ML20148B247
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/24/1978
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20148B247 (1)