|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] |
Text
. .
l - RonElfr Y. UENTON llattimore Gas and Electric company Vice President Calvert Chlfs Nuclear Power Plant Nuclear Energ~y 1650 Calvert Clip Parkway lanby, Maryland 20657 410 586 2200 Ext. 4455 lxcal 410 26c>-4455 llattimore May 27,1994 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 License Amendment Request; Extension of the Reactor Protection System and Engineered Safety Feature Actuation System Surveillances from Monthly to Ouarterly Pursuant to 10 CFR 50.90, the Baltimore Gas and Electric Company hereby requests an Amendment to Operating License Nos. DPR-53 and DPR-69 by incorporating the changes described below into the Technical Specifications for Calvert Cliffs Unit Nos. I and 2.
DESCRIPTION The proposed amendment would revise the Technical Specification surveillance test interval from monthly to quarterly for several channel functional tests for the Reactor Protective System (RPS) and the Engineered Safety Feature Actuation System (ESFAS). This proposed change is based on the analysis documented in CEN-327 (Reference a) and CEN-327, Supplement 1 (Reference b). The NRC approved these reports in Reference (c). In addition, an administrative change to the ESFAS table is proposed which removes an out-of-date footnote concerning the Emergency Diesel Generator (EDG) logic circuit modifications.
BACKGROUND The RPS and ESFAS provide actuation signals to the safety equipment needed to mitigate design basis accidents and transients. Periodic testing is performed to demonstrate the functionality of the system.
Frequent testing of these systems increases the possibility of test-induced system actuations and plant trips.
Increasing the surveillance test interval minimizes the potential for inadvertent RPS/ESFAS actuations and trips during surveillance testing.
- s .< zt o 9406010068 940527 i PDR ADOCK 05000317 P PDR j 05 2 TV)J87 M'/
l l Document Control Desk May 27,1994
~ Page 2 i
1 In Generic Letter 83-28 (Reference d), the NRC requested plants to review the RPS test intervals to I determine if they were consistent with achieving high RPS availability. Combustion Engineering (CE) performed a senstivity analysis to evaluate the availability of the RPS given the 30-day test in:erval required by the Technical Specifications. Later, as a follow-up to the original sensitivity analysis, the impact of extending the surveillance test intervals for selected components in the RPS and ESFAS was evaluated by CE. This analysis is documented in CEN-327 "RPS/ESFAS Extended Test Interval l Evaluation."
In CEN-327, four RPS fault tree models developed previously for the Combustion Engineering Owner's l Group (CEOG) were expanded to cover all RPS electronic trip parameters. The new models, which J
! included the Calvert Cliffs RPS design, were then used to determine the RPS reliability for both monthly !
and quarterly test intervals. The model considered common mode failures, operator errors, reduced !
redundancy, and random component failures. The study results show that for the Calvert Cliffs RPS, i adoption of a quarterly test interval yields a decrease in core melt frequency attributable to reduced exposure to test-induced transients. This decrease in core melt frequency was shown to be offset by an increase in system unavailability. The overall safety impact of the reduced testing was judged to be negligible.
Fault tree models were also constructed for each of the ESFAS signals for the different plant classes used for the RPS analysis. Each ESFAS fault tree model specifically addressed common mode failures, operator error, reduced redundancy, and random component failures. The study found that for Calvert i Cliffs, adoption of a quarterly test interval would yield a decrease in core melt frequency due to the reduced exposure to test-induced transients, and a small increase in core melt frequency due to the increase in system unavailability. For the Calvert Cliffs EFIAS, the net safety impact of extending the test interval to quarterly was shown to be negligible.
In March 1989, CE issued CEN-327, Supplement 1, which presented changes in RPS reliability that resulted from extending the test intervals from 30 days to 90 days for all RPS trip parameters, and recommended a 90-day test interval with sequential testing. CEN-327, Supplement 1, re-evaluated 19 RPS trip parameters which in CEN-327 had resulted in a slight increase in overall core melt frequency. The results of the re-analysis demonstrated that the surveillance test interval could be increased to 90 days with
! no significant increase in RPS unavailability.
l I
The analysis results presented in CEN-327 and CEN 327, Supplement 1, demonstrated that the surveillance test interval for RPS and ESFAS components can be increased with a negligible change in the core melt frequency. For the 90-day test interval, the overall impact of the reduced testing on safety is considered to be negligible. Extending the surveillance test interval does not change the trip-per-test frequency, but does reduce the trip-per-year frequency.
In November 1989, the NRC issued a Safety Evaluation Report (SER) for CEN-327 and CEN-327, Supplement 1. The NRC stated that is was acceptable to extend the surveillance test intervals for the RPS j and ESFAS from 30 days to 90 days for all CE plants (excluding Maine Yankee). This approval was j contingent on each plant confirming that instrument drin occurring over the proposed surveillance test l interval would not cause the setpoint values to exceed those assumed in the safety analysis and specified in l the Technical Specifications. The NRC SER stated that licensees must confirm that they have reviewed instrument drin information for each channel involved, and have determined that drift occurring in that !
l I
i
l
' Document Control Desk May 27,1994
~ Page 3 channel over the period of extended surveillance test interval would not cause the setpoint value to exceed the allowable value as calculated for that channel by the licensce's methodology; each licensee should have onsite records of the as-found and as-len values showing actual calculations and supporting data for planned future NRC audits; the records should consist of monthly data over a period of the last two to three years with the current plant-specific setpoint methodology used to derive the safety margins. The plant-specific evaluation for Calvert Cliffs concluded that instrument dria for the extended surveillance test interval do not exceed the current 30-day setpoint assumptions. Three jears of observed, monthly, as- l found and as-len data for each channel of the applicable instrumentation functions were reviewed for the ;
plant-specific evaluation. The onsite records of the as-found and as-len values showing the calculations and supporting data are available for future NRC audits.
In addition to the proposed changes in surveillance interval, a change is proposed which will remove an out-of-date footnote. Amendments 164/144 (Reference c), added a footnote to the ESFAS Table 4.3-2 that exempted the monthly tests for SIAS logic circuits A-10 and B-10 until the EDG logic circuit modifications were completed. These modifications have been completed and this footnote is no longer needed.
Table 4.3-2 is changed in this proposed amendment and, therefore, we propose deleting this footnote.
REOUESTED CIIANGE Change Specifications Table 4.3-1 and Table 4.3-2 of the Unit I and Unit 2 Technical Specifications and associated Bases as shown on the marked-up pages attached to this transmittal. The final Technical Specification pages will be renumbered to accommodate added and/or deleted pages. ;
SAFETY ANALYSIS The RPS and ESFAS provide actuation signals to the safety equipment needed to mitigate accidents and transients. The NRC has found it acceptable to extend the surveillance test intervals for the RPS and ESFAS based on CEN-327 and CEN-327, Supplement 1. For RPS and ESFAS instrumentation channels affected, CEN-327 and its associated supplement documented that extending the surveillance test intervals resulted in a decrease in core melt frequency due to the reduced exposure to test-induced transients and an increase in core melt frequency due to the increase in system unavailability. The net impact of extending the test interval from monthly to quarterly is a negligible change in core melt frequency. A plant-specific instrument dria analysis was conducted that analyzed the effect on instrument drift of extcading the RPS and ESFAS instrumentation functional surveillance test interval from monthly to quarterly. The plant-specific analysis is consistent with ISA-RP67.04 Part 11 (Reference f) and the Electric Power Research institute guidelines (Reference g). A 120-day driR interval was calculated to bound the quarterly interval plus the 25% maximum allowable extension period pennitted in the Calvert Cliffs Technical Specifications.
A review of all of the afTected RPS and ESFAS instrumentation channels determined that the instrument I driR for the extended surveillance test interval do not exceed the current 30-day setpoint assumptions.
Therefore, it is unnecessary to change any setpomts to acconunodate the proposed extended surveillance test intervals.
l Document Control Desk I Ma'y 2.7,1994 Page 4 I
l l
l He proposed removal of the footnote from the ESFAS Table 4.3-2 is an administrative change. The i modifications referenced in the footnote have been completed and this proposed change only removes obsolete information from the Technical Specifications.
DETERMINATION OF SIGNIFiCANT IIAZARDS The proposed change has been evaluated against the standards in 10 CFR 50.92 and has been determined to not involve a significant hazards consideration, in that operation of the facility in accordance with the !
proposed amendments:
- 1. Would not involve a sigmfcant increase in the probability or consequences of an accident previously evaluated i
The Reactor Protective System (RPS) and the Enginected Safety Features Actuation System (ESFAS) provide the actuation signals to safety equipment necessary to mitigate design basis accidents and transients. The proposed change would increase the surveillance test interval from monthly to quarterly for several of the RPS and ESFAS instrumentation channel functional tests.
The RPS/ESFAS instruments are not an initiator in any previously evaluated accidents. Therefore, the proposed changed does not involve an increase in the probability of an accident previously evaluated. The required plant-specific setpoint drift analysis for Calvert Cliffs demonstrated that the observed changes in instrument uncertainties for the extended surveillance test interval do not exceed the current 30-day setpoint assumptions. This provides confidence the 90-day *.est inten'al will not impact the ability to detect and monitor system degradation. Therefore. the proposed change will not change the ability of the RPS/ESFAS instrumentation to respond to and mitigate the consequences of any previously evaluated accident. In addition, an obsolete footnote is removed from ESFAS Table 4.3-2.
Therefore, the proposed change does not irreolve a significant increase in the probability or consequ, aces of an accident previously evaluated.
- 2. Would not create the possibility of a new or diferent type of accident from any accident previously evaluated.
The proposed extended surveillance test interval for the RPS and ESFAS and the removal of the obsolete footnote does not involve any changes in equipment or the function of these instruments.
The proposed change does not represent a change in the configuration or operation of the plant.
The RPS and ESFAS setpoints will not be changed as the instrument uncertainties resulting from l the proposed surveillance test interval (calculated using actual plant data) are less than the l instrument uncertainties assumed for the current surveillance interval. Therefore, the proposed i
change does not create the possibility of a new or different type of accident from any accident l previously evaluated.
i I
i 1
Document Control Dcsk I Ma'y 27,1994 l Page 5
- 3. Would not involve a significant reduction in a margin ofsafety.
The proposed change will not affect the functions of the RPS or the ESFAS instruments. The CEN-327 and CEN-327, Supplement 1, topical reports quantified the corresponding changes in
! core melt frequency for the representative fault tree models that were developed for Calvert Cliffs.
The proposed change has two principal effects with opposing impacts on core melt frequency. The first impact is a slight increase in core melt frequency that results from the increased unavailability l of the instrumentation in question. This assumed unavailability results from less frequent testing.
The unavailability of the tested instrumentation components represents the potential for the failure j of the reactor to trip, an Anticipated Transient Without Scram, or a failure of the appropriate 1 l engineered safety features to actuate when required. The opposing impact on core melt risk is the ;
corresponding reduction in core melt frequency that would result due to the reduced exposure of l the plant to test-induced transients. The two changes are nearly equal and the net result is no l distinguishable effect on plant safety. The NRC issued a Safety Evaluation Report which found l that these evaluations were acceptable for justifying the extensions in the surveillance test intervals for the RPS and ESFAS frcm 30 days to 90 days.
{
l The RPS and ESFAS setpoints will not be changed since the instrument drift resulting from the proposed surveillance test interval is less than the instrument drift presently assumed for the current surveillance inte Tal. This provides confidence the 90-day test interval will not impact the ability to detect and monitor system degradation.. The removal of the ESFAS Table footnote only removes obsolete information from the Technical Specifications. The conclusions of the accident analyses in the Calvert Cliffs Updated Safety Analysis Report remain valid and the safety limits j continue to be met. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
ENVIRONMENTAL ASSESSMENT I l The proposed amendment would change requirements with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 or changes to an inspection or surveillance requirement. We have determined that the proposed amendment involves no significant hazards consideration, and that operation with the proposed amendment would result in no significant ,
change in the types or significant increases in the amounts of any effluents that may be released offsite, and !
- in no significant increase in individual or cumulative occupational radiation exposure. Therefore, the ,
proposed amendment is eligible for categorical exclusion as set forth in 10 CFR 51.22(c)(9). Pursuant to l 10 CFR 51.22(b), no environmental impact statement or emironmental assessment is needed in connection with the approval of the proposed amendment.
l
! SCIIEDULE l This change is requested to be approved and issued by December 1,1994. However, issuance of this l amendment is not currently identified as impacting outage completion or continued plant operation.
i Document Control Desk i Ma'y 27,1994 l Page 6 l SAFETY COMMITTEE REVIEW These proposed changes to the Technical Specifications and our determination of significant hazards have been reviewed by our Plant Operations and Safety Review Conunittee and Offsite Safety Review Committee. They have concluded that implementing these changes will not result in an undae risk to the health and safety of the public.
Should you have any questions regarding this matter, we will be pleased to discuss them with you. l 1
Very truly yours, 1
? --
STATE 0F MARYLAND :
- TO WIT :
COUNTY OF CALVERT :
I hereby certify that on the 8 day of Not4/ . 19 b fore m= the subscriber, a Notary Public of the State of Maryland in and for / (' . personally appeared Robert E. Denton, being duly sworn, and states that he is Vice President of the13altimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response for the purposes therein set forth; that the statements made are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.
WITNESS my Hand and Notarial Seal:
I Notary Public
/. (
i i
I My Commission Expires: M /h@[f Dat l
RED /DJM/dtm Attachments: (1) Unit 1 Technical Specifications Revised Pages (2) Unit 2 Technical Specifications Revised Pages
. _ - , . . _ _ . . _ . _ . ~ . _ _ _ - _ . _ . . _ . . _ _
Document Control Desk May 27,1994
' Page 7 l
1 cc: D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. McLean, DNR l J. H. Walter, PSC
REFERENCES:
(a) CEN-327, "RPS/ESFAS Extended Test Interval Evaluation," dated May 1986 (b) CEN-327, Supplement 1, "RPS/ESFAS Extended Test Interval Evaluation," dated January 1989 (c) Letter from Mr. A. C. Thadani (NRC) to Mr. E. Sterling (APSC), dated November 6,1989, NRC Evaluation of CEOG Topical Report CEN-327, "RPS/ESFAS Extended Test interval Evaluation" (d) Generic Letter 83-28, " Required Actions Based on Generic Implications of Salem ATWS Events," dated July 8,1983 (c) Letter from Mr. D. G. Mcdonald, Jr. (NRC) to Mr. G. C. Creel (BGE),
dated October 31, 1991, Issuance of Amendments for Calvert Cliffs Nuclear Power Plant, Unit No.1 (TAC No. 81360) and Unit No. 2 (TAC No. 81361)
(f) ISA-RP 67.04 Part II, Draft 10 " Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation," August 1992 (g) EPRI TR-103335, " Guidelines for Instrument Calibration Extension / Reduction Programs," March 1994
I ATTACHMENT (1)
UNIT 1 TECIINICAL SPECIFICATION REVISED PAGES 3/43-6 3/4 3-7 3/4 3-19 3/4 3-20 3/4 3-21 3/4 3-22 B 3/4 3-1 1
l s -
- - - .