ML20175A150

From kanterella
Revision as of 01:09, 1 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

TR Verification Review Form MRP-221, Rev 1-A Supplemental Information
ML20175A150
Person / Time
Site: Electric Power Research Institute
Issue date: 06/25/2020
From: Joseph Holonich
Licensing Processes Branch
To:
Holonich J, NRR/DORL/LLPB, 415-7297
Shared Package
ML20175A148 List:
References
EPID L-2020-TOP-0034
Download: ML20175A150 (1)


Text

Office of Nuclear Reactor Regulation

-A Topical Report Verification Review Determination

-A Topical Report Information Review Information Report No.: MRP-227 Revision 1-A, Final Published Division/Branch: DNRL/NVIB Version Project Manager: J. Holonich

Title:

Materials Reliability Program: Pressurized Water Reviewer(s): J. Medoff Reactor Internals Inspection and Evaluations Guideline, ADAMS Accession No.: ML20175A114 EPID: L-2020-TOP-0034 Docket No.: 99902021 Staff Verification Determination ADAMS Accession Numbers for This Review Package: ML20175A148 Email: ML20175A149 This Form: ML20175A150 The NRC staff has determined that the topical report is acceptable to the extent X delineated in the NRC staffs safety evaluation dated May 26, 2020.

ADAMS Accession No.: ML20141L315 Based on its review of the changes documented in the topical report, the NRC staff has determined that the -A report is not acceptable for referencing in licensing actions.

Basis for Denial Approval Printed Name Signature Date Technical Branch Chief Hipo Gonzalez /RA/ Jun 25, 2020 Projects Branch Chief Dennis Morey /RA/ Jul 6, 2020