ML20141H558
| ML20141H558 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 05/20/1997 |
| From: | Mendonca M NRC (Affiliation Not Assigned) |
| To: | Berg W DAIRYLAND POWER COOPERATIVE |
| References | |
| NUDOCS 9705270014 | |
| Download: ML20141H558 (3) | |
Text
"
/ 1 l
May 20, 1997 )
I Mr. William L. Berg, General Manager l Dairyland Power Cooperative 3200 East Avenue South P. O. Box 817 )
La Crosse, Wisconsin 54602-0817
SUBJECT:
CHANGE IN OFFICE OF NUCLEAR REACTOR REGULATION PROJECT MANAGEMENT !
FOR THE LACROSSE FACILITY
]
1
Dear Mr. Berg:
l On the above'date, project management for the La Crosse Boiling Water l
Reactor will be assumed by Mr. Paul W. Harris of my staff. He can be reached j by telephone at (301) 415-1169. He will arrange for a site visit at a date convenient to both your staff and his scheduled activities. I Sincerely, original signed by: i Marvin M. Mendonca, Acting Project Director i' Non-Power: Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-409 Q cc: See next page ,
DISTRIBUTION: '
.. . , I
- DocketlFile 50-409 SWeiss OGC (015-B-18)
PUBLIC MMendonca MMasnik PDND r/f EHylton Region III MSlosson PHarris 6
PDND:P f P PDND:(A)SC PDND:(A)D PHarr vf Jon MMasnik M78^7 MMendonca
$/n / 7 5 /97 f/ fi/97 g/,M/97 0FFICIAL RECORD C0P DOCUMENT NAME: G:\SECY\ HARRIS \LACNEWPM 7 3 ra i g g m E R C O P Y 9705270014 970520 PDR ADOCK 05000409 P PDR
4 j
,7 i
) [pt* "%e-4 UNITED STATES l j
't NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055tM)o01
%,,,,,+ May 20, 1997 Mr. William L. Berg, General Manager Dairyland Power Cooperative ,
3200 East Avenue South P. O. Box 817 La Crosse, Wisconsin 54602-0817 L
SUBJECT:
CHANGE IN OFFICE OF NUCLEAR REACTOR REGULATION PROJECT MANAGEMENT FOR THE LACROSSE FACILITY
Dear Mr. B. erg:
On.the above date, project management for the La Crosse Boiling Water d
Reactor will be assumed by Mr. Paul W. Harris of my staff. He can be reached by telephone at (301) 415-1169. He will arrange for a site visit at a date convenient to both your staff and his scheduled activities.
Sincerely
- - %eb % >
Marvin M. Mendonca, Acting Project Director ;
Non-Power Reactors and Decommissioning :
4 Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-409 l cc: See next page l
3iw
, 4;
'n Dairyland Power Cooperative Docket No. 50-409 La Crosse Boiling Watar Reactor cc:
Fritz Schubert, Esq.
Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601 Whieler, Van Sickle.and Anderson '
Suite 801 25 W. Main Street Madison WI 53703-3398 J Mr. Roger Christians, Plant Manager La Crosse Boiling Water Reactor ;
Dairyland Power Cooperative '
P. O. Box 275 Gea;a, Wisconsin 54632 l l
Town Chairman Town of Genoa ;
Route 1 Genoa, Wisconsin 54632 !
Chairman ,
Wisconsin Public Service Commission P. O. Box 7854 Madison, Wisconsin 53707-7854 ATTN.-Mr. Lanning Smith i Regional Administrator ,
Region III- '
U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 4