ML20127M555

From kanterella
Revision as of 16:36, 9 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Mod 5,raising Contract Ceiling,To Elimination of Marginal Safety Requirements
ML20127M555
Person / Time
Issue date: 01/05/1993
From: Baker L, Reseigh M, Michael Scott
NRC OFFICE OF ADMINISTRATION (ADM), SCIENTECH, INC., SMALL BUSINESS ADMINISTRATION
To:
References
CON-FIN-L-1303, CON-NRC-04-90-059, CON-NRC-4-90-59 NUDOCS 9301280230
Download: ML20127M555 (4)


Text

--- .

p.cOro RACi so COut' "^ " " "^

  • AMENDMENT OF SOLICITN N/ MODIFICATION OF CONTRACT
  • 1 13 e.i m cTavl oAic e. aOOihn ON/v0.a c Rca. NO. s. eRO;i_Ci NO. gf ,,,,,w; v.AulNOuLeufuuOa.CA1 Ou NO.

Five (5) $N 51933 RWA # HES-%059 dtd 9M3/42 N2-W

s. e55vcD uY coot

' ' ^ "**"'""*8'*"'"'**"#"* al U.S. Nuclear Regulatory Commission Division of Contracts & Property Management Washington, DC 20555 e.NAMC AND ADOHL55 Of CONT RAC10R (No etreef. county.68ste sad TJP Code) -g 9A. AMENOMENT OF t>OUCtT ATION NO, Prine: US Small Nainess taninistratim Boise District Office *a. O^t t o rus Tu J J) 1020 Main Street, Suite 290 Boise, ID ;83702 10A. OtFICATION OF CONT RACT/OROU4

g. g g ech 13 4 M3 1690 International Riy X NM 9 Idaho Falls, ID 83402 los. DATLO ($LE RTKM J 8) lF ACILITY CODE 5/24/92 CODE 11.THIS ITEM ONLY APPLIES TO AMENOMENTS OF SOLICITATIONS is ehended, is not u.

The above numbered sendtetion is amended as set iorth in item 14. The hour and date specified fo'r asceipt of Offers

- ,ded.

Offers must acknowledge receipt of this e.w-Jiva prior to the hour and date specified in the soud totion or es amended.ty one of the fonowin copies of the eroendment: Itd By acknowledging receipt of this erwwdment on each copy of the oHer (a) Dy completing items 6 ord 15.and returning _

submitted; or Ic) By eeperate letter or telegram which includes a reference to the solicitation and amendment numbert FAllAJRE OF Y MENT IN REJECTION TO DE OFRECEIVED YOUR OFFEft. AT If by THE Pt.

virtue of thisACE DESIGNATED amendment you desire to FOR chanceTHE RECElf'T en offer OF OFFERS otready etemitted.euch changePRIOR may be TO mad letter,prov6ded each telegram or letter enskes reference to the solicitation and this amendment.end is received prior to the openleg

12. ACCOUNTINO AND AIPROPRIA100N DAT A (1/ evendavd) pg ORLTcmmt $20,000.00 APPN NO.: 31X0200.360 B&R NO.: 36019201100 FIN NO.: L1303
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS.

IT MODIFIESTHE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A.1Hl5 CHANGC OROC R 85 ISSUEO PORSUANT TO: (Sp4Nifauthodty)'iHE CHANGCS SCT FORTH 4N iiLM 84 ARE MADCIN THf. CONS O TRACT ORDER NO. lN 4 TEM loa.

D.THC ABOv0 NUMBE RCO CON TR ACT/OR OCR 15 SAOOtFICO TO REFLECT THE ADMINISTR ATIVE CHANGCS (such as changes in pa approprtation date. esc.) SET FORTH IN ITEM 14. PURSUANT TO THC AUTHORITY OF FAR 43.103(b).

C. T HI5 $UPPLLMLNTAL AGRELMLN145 LN1LRCD INTO PURSUANT TO AUTetOHil Y OFs

0. 01HCR lSpectly type of enodifecatian and authority)

X Mitual agreement of the partien 4 cop ies to the issuina OinCe.

E. IMPORTANT:

Contractor O is not. O i, requireo io sion shis eOcument .na return H. OLSCWellON OF AMENOMLNT/MOOtfICATION (Orrant <d by UcFacenoa headints,includins ochcitetsonnontmet enti/ vet mouer inherv feed Principal Investigator / Technical

Contact:

Vincent Panciera Telephone No. (301) 468-6425 A

k t

See Attached Pages. T@ l 9301280230 930105 UU PDR CONTR NRC-04-90-059 PDR f' Lucept as provierd herein, all terms and conditions of the docurnent eeferenced in item 9 A of IOA. as beretofore changed. . remaint unchanged and in tutt to and ef tect. 16A. rdAML AND 16 i LL Of CONIII ACT eriG Of't ICER (Type or Fr160 ISA, f 4 AME ANO 141 LL Of $4Gr4LH (Type or prinO SEE SIGNAUJHE PAGE SEE MGNNIME PAGE It>C. Od5E LIGNU IN3. CON T R AC 10H/Of f tJ HO H I SC. DAf t LiGrdLD 16ti. UFOI LO ST AT Ls or AMt. HIC A tlY _

(Wgnature of ConVoctmg Of(scer) t%4 naturs of person eutharded la sign) 3n. W STANDAHD FORM 30 (REV.10-e:

resta 7'.40 01.lS2-no 70 p,e se ntee d tw G S A PH4 vlot K f 01T 904 UnusADt.f f A D t 4 fl C F h ) 5.) ? d 3 l l

L TRIPARTATE AGREEMENT. ,

ContractNo.NRC-04-90-059/8 Modification No. 5 Signature Page-SUBCONTRACTOR:

Scientech, Inc. /

By: fA 4* Date: 12-22-9 6 v' -

Name: Mira 14. Reecirh. r)irector Contw:!mel/Alin13tration

Title:

PRIME CONTRACTOR:

V. S. SMALL SI) S MINIST ON By:

vb 1$$d) cl()- Date: ...

"k 7

Name: _ .

UOD00 J. Lbaker

Title:

Onntencting nlgh/.f ggg PROCURING OFFICE:

U. S. NUCLEAR REGULATORY COMMISSION By: Glmon go htcAQ, Oate: \-as -S3 Lit >f Name: _ Mary _Lynn Scott- _

4

Title:

Contracting Officer I

Contract No. NRC-04-90-059 Modification Five -(5)

Page 2 of.3-The purpose of this modification is to (1) raise the contract ceiling by

$20,000.00 from $305,891.97 to.$325,891.97, (2) revise Task 5 of C.1.3.5 to add an additional public meeting, (3) Extend the period of performance from 10/30/92 to 4/30/93 ar.d (4) revise the indirect rates. Accordingly, the contract is hereby modified as follows:

1.) Under section B.3 CONSIDERATION AND OBLIGATION--COST PLUS FIXED FEE (JUNE 1988) Paragraph a. and cc are deleted in their entirety and replaced with the following in lieu thereof:

a. The total estimated cost to the Government for full performance of this contract is $325,891.97, of which the sum of $292,641.41 represents the estimated reimbursable costs, of which $2,795.51 represents the facilities capital cost of money, and of which

$30,455.05 represents the fixed fee.

c. The amount obligated by the Government with_ respect to this contract is $325,891.97.

2.) Paragraph C.I.3.5, Task 5 of Section C is dele'ted in its entirety and replaced with the following:

"C.1.3.5 Task 5 The contractor shall perform logistical planning for conducting a second public workshop in the Washington, DC area to discuss the candidate regulatory changes-and to obtain feedback from the industry and other interested parties. This is intended to be a two (2). day workshop. The logistical planning should include but not limited to:

(a) identifying and reserving meeting facilities and equipment; (b) preparing copies of agenda and other materials necessary for the meeting; (c) preparing summaries and a proceedings of the workshop; (d) providing technical support to the NRC staf f for the conduct of.the workshop; and (e) transcription of the workshop. Attendees _shall be responsible for their own expenses / room accommodations / food.

The public meeting shall be scheduled for January 1993."

' E

~ Contract No. NRC-04-90-059 Modification Five (5)

Page 3 of 3 3.) Section F.6 0URATION OF CONTRACT PERIOD (MAR 1987), is revised to read as follows:

"This. contract shall commence on 5/24/90 and will expire on 4/30/93."

4.) Section G.1 INDIRECT COST RATES is revised to read as follows:

" CATEGORY RATE (%) COST BASE APPLICABLE PERIOD Overhead 99% total direct 11/1/92-1/31/93 labor costs Overhead l0RE total direct 02/1/93-4/30/93 labor costs G&A 12% total direct 11/1/92-1/31/93 costs and overhead G&A 12.43% total direct. 2/1/93-4/30/93 costs and overhead" A summary of obligations for this contract, from award date through the date of this action is given below:

Total FY 90 Obligation Amt $ 160,476.97 Total FY 91 Obligation Amt. $ _ 56.417.00 Total FY 92 Obligation Amt. $ 88,998.00 4 Total FY 93 Obligation Amt. $ 20,000.00 Cumulative total of NRC obligations $ 325,891.97 This modification obligates FY 93 funds in the amount of-$ 20,000.00.

All other terms and conditions of the contract remain the:same

- ,_ - .