ML20134D645

From kanterella
Revision as of 19:11, 2 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 850429 Request for Estimate of Date for Response to Congressman Markey 850418 Request for Review of Various Aspects of NRC Relationship W/Doe.Estimated Date of Issuances Is 850910
ML20134D645
Person / Time
Issue date: 05/20/1985
From: Connelly S
NRC OFFICE OF INSPECTOR & AUDITOR (OIA)
To: Palladino
NRC COMMISSION (OCM)
Shared Package
ML20134D595 List:
References
FOIA-85-357 NUDOCS 8508190307
Download: ML20134D645 (1)


Text

?

Dircks f' 'g UNITE D sT ATE s geg

{ 7.- NUCLE AR REGULATORY COMMISSION Stello s ( wasmwcvow.o c. mss Denton May 20,1985 Taylor Norry GCunningham Regions MEMORANDUM FOR: Chaiman Palladino FROM: Sharon R. Connelly, Director M Office of Inspector and Auditor

SUBJECT:

CONGRESSMAN MARKEY'S APRIL 18, 1985, REQUEST FOR A REVIEW Of VAR 1005 ASPECTS OF NRC'S RELATIONSHIP WITH THE ,

DEPARTMENT Of ENERGY This responds to your April 29, 1985, direction to initiate the subject review and your request for an estimate of a final report date. Based on our pre-liminary assessment of the time required to conduct the review and prepare a report, including getting coments from the Executive Director for Operations on a draft, we believe we can issue a final report by September 10, 1985.

cc: Comissioner Roberts Comissioner Asselstine Comissioner Bernthal Comissioner Zech S. Chilk, SECY M Dircks EDO H. Plaine, OGC J. Zerbe, PE C. Kamerer CA 1

CONTACT: Fred Herr, DIA 49-24462 h---

w

/

J A4 l 1

8508190307 850801 PDR FOIA ,

BELL 85-357 PDR

_ _ . _ _ _ _ _ . _ _ _ _ . . _ _ _ _ . - _ . - _ _ .