ML20138E869

From kanterella
Revision as of 06:46, 30 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Concurs W/Doe'S Slick Rock Remedial Action Plan
ML20138E869
Person / Time
Issue date: 04/29/1997
From: Cain C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rael G
ENERGY, DEPT. OF
References
REF-WM-86 NUDOCS 9705050181
Download: ML20138E869 (4)


Text

.

Mr. G:orge Rael,~ Acting Director '

U.S. Department of Energy Albuquerque Operations Office i

' ERO/UNTRA P.O. Box 5400 Albuquerque, NH 87185-5400

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION CONCURRENCE IN THE REMEDIAL ACTION PLAN FOR THE SLICK ROCK, COLORADO, URANIUM MILL TAILINGS SITF

Dear Mr. Rael:

On September 30, 1996, the U.S. Nuclear Regulatory Commission notified the U.S. Department of Energy (DOE), Uranium Hill Tailings Remedial f.ction Project Office, of.the completion of the NRC staff's review of the final Remedial Action Plan (RAP) and all; associated documents pertinent to the proposed remedial action;t the inactive uranium mill tailings site at Slick Rock,  !

Colorado (letter from Holonich to Sena). The staff's review was documented in i

the Final Technical Evaluation Report for the Slick Rock site, transmitted via the September 1995 letter.

I have signed the original signatufe pages (three copies enclosed) signifying the NRC's concurrence in the Slick Rock RAP. These pages were transmitted far i NRC's ::ignature and incorporation into the RAP by your letter of April 10, 1997. NRC's concurrence signifies that DOE's proposed remedial action complies with the 40 CFR Part 192, Subparts A-C, standards of the U.S. Environmental Protection Agency, with the exception of selection and l

performance of a groundwater cleanup program. . DOE has proposed deferral of this aspect of the remedial action at this time and plans to handle this action in the separate groundwater program. NRC considers the deferral to be acceptable; therefore, NRC's concurrence in the RAP does not include l

groundwater remediation. '

If you have any questions concerning this letter, please co.itact the NRC Project Manager, Ms. Charlotte Abrams, at (301) 415-5808.

Sincerely, (Original signed by)

Charles L. Cain, Acting Chief Uranium P.ecovery Branch 1 Division of Waste Hanagement [

970505o181 970429 Office of Nuclear Material Safety PDR WASTE and Safeguards WM-86 PDR cc: J. Pape, DOE Alb y/ I,

.3l"h?

S. Hamp, DOE Alb E., Artiglia, TAC Alb jp k 050003 File Center r

DLSJRIBUTION w/ Encl . : NMSS r/f UR8 r/f PUBLIC CNWRA ACNW JHolonich w/o Incl.: HFederline DOCUMENT NAME: _S:\DWM\ URB \CEA\SRKSIG OFC URB _& URh,c URB U' NAME CAbrh 9CiNn CCain h 0 DA3 04[//97 k 04/d/97 04/cf /97 0FFICIAL RECORD COPY MRE BE El$NtM

. .. - -. -- ~ ~ . - . .. .- _ - - . . - - - .-. .. . ..

l .

- U.S. Department of Energy Agreement No. DE-FC04-81ALl657  :

. Appendix B, RercediaJ Action Plan

! for Slick Rock, Colorado -

l

). The United States ofAmedea

( Department of Energy State of Colorado i

/ 7  :,.

By: // / _ By:

. Jiian' .W E11ars JeffDeckler l Con acting Officer UMTRA Program Manager Contracts and Procurement Division Remedial Programs Section

] Albuquerque Operations Office Hazardous Materials & Waste Division i i

Colorado Department of Public Health and Enviromnent i

FEB ! 2 !!$I I

) Date: Date:  ;

i

! CONCURRENCE:

i UNITED STKrES OF AMERICA NUCLEAR REGULATORY COMMISSION i i

By: bad,,y.0,w ta rJoseph J. Holonich, Chief Uranium Recovery Branch

Division of Waste Management Office of Nuclear Material Safety and Safeguards Date
Ad 2/ . / W 7

n  !

l ,

, U.S. Department of Energy Agreement No. DE-FC04-81AL1657 Appendix B, Remedial Action Plan for Slick Rock, Colorado I

1 The United States of America Dept aent of Energy State of Colorado i l

, ,}

B j'/ / By:

' Jup fiW(iiildni~ JeffDeckler trontracting Officer UMTRA Program Manager i Contracts and Procurement Division Remedial Prograrns Section 4 Albuquerque Operations Office Hazardous Materials & Waste Division

! Colorado Department ofPublic Health and Environment

}

Date: Date:

4 i l I

CONCURRENCE:

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION By: 0kJer.0,w 4,<- Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management Office ofNuclear Material Safety and Safeguards Date: <y d&Z/ Mf 7 i

. [' '

U.S. Department of Energy

-Agreement No. DE-FC04-81AL1657 l Appendix B, Remedial Action Plan i

for Slick Rock, Colorado l The United States of America 1

Department of Energy State of Colorado i

I By: _ __

e an D. Williams JeffDeckler

. Contracting OfIicer UMTRA Program Manager

! Contracts and Procurement Division Remedial Programs Section l Albuquerque Operations Office Hazardous Materials & Waste Division Colorado Department of Public

, Health and Enviroranent
Date:

ffB f> lHi Date:

l 4

i . 1 l CONCURRENCE:

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

! By:._, b ar I. b h ~

MJoseph f Holo'nich, Chief

Uranium Recovery Branch j Division of Waste Management Office of Nuclear Materis! Safety
and Safeguards Date
g/bo) 2/, /997 l /  ;

i i

i

, - - , , - , .