ML20140F725
| ML20140F725 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/06/1997 |
| From: | Doughty J SEACOAST ANTI-POLLUTION LEAGUE |
| To: | Milano P NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9706130215 | |
| Download: ML20140F725 (2) | |
Text
J, -
l Pec I
June 6, 1997 Patrick D. Milano, Acting Director Project Directorate 1-3 Office of Nuclear Reactor Regulation 0-14 B 20 US Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Milano:
Enclosed is the Seacoast Anti-Pollution League's comment on the proposed License Amendment to Seabrook Station, Unit No. 1, public notice of which was published on 6/4/97 in the legal notices section of the Portsmouth Herald.
I telephoned 301-415-1457 by direct dialed call on this date and reached your voice mail and read SAPL's comment.
When 1 later noted that the instructions said "by collect call", 1 tried twice to place a collect call to your number to resubmit our comment. Neither call was accepted. This raises a concern that other public comments may also have been attempted unsuccessfully. On this basis, SAPL would ask that the public comment period be extended.
Sincerely, C) = h % l Jane Doughty SAPL Staff l
Enclosure l
I Via Certified Mail 1 b
[
f t
t( VMdtM ,
l 9706130215 970606 l(ll(((ll((lll(ll(l((lli}(lo}{llil(ll.ll PDR ADOCK 05000443 . . . .
H PDR l
1 l
~
s.
l 1 l SAPL'S COMMENT ON NRC'S PROPOSED LICENSE AMENDMENT (Public Notification of which was published in the l
Legal Notices section of the Portsmouth Herald on 6/4/97) ]
It is the Seacoast Anti-Pollution League's position that there is a significant hazards consideration.in the matter of the NRC staff # s proposed amendment to the operating license at the Seabrook Station, Unit No. 1, which would amend the Seabrook Technical Specifications to l
explicitly identify the Westinghouse fuel assembly design at Seabrook consisting of either ZIRLO or Zircaloy-4 fuel cladding material.
There is a significant hazards consideration in this l
matter because it has become clear that there is a problem l with the Westinghouse fuel cladding in use at Seabrook l Station. The licensee has identified leaking fuel rods; two
- of the ZIRLO clad rods broke during refueling operations according to an event report made to the NRC on S/31/97.
This degradation of one of the principal safety barriers at
- the plant is a very serious matter. If root causes are not I
identified and remedied, there is every reason to expect that this degradation will continue in future and a condition could eventuate which could lead to serious public safety consequences. SAPL holds that the detection of a steam generator tube leak during the last operating cycle, which indicates that a second principal safety barrier at the l
plant is also degrading, is relevant to this matter. SAPL believes that the both the probability and consequences of previously evaluated accident scenarios are increased by l plant operation with degradeo fuel cladding. It is clear l that plant workers are already being subj ec ted to more
' hazardous working conditions as a consequence of the degraded fuel cladding. Operation of Seabrook Station with defective fuel cladding significantly reduces the margins of public safety.
l SAPL holds that a hearing should be held and a thorough
! investigation be made to determine the root causes of l existing fuel cladding degradation prior to any decisions I
being made to issue this license amendment and prior to plant start-up.
Submitted on 6/6/97 by:
a O O Jane Doughty 4
SAPL Staff 4
.