ML20137H311

From kanterella
Revision as of 19:19, 17 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Transcripts of Interview W/K Zahrt & R Sawyer After Objected to Receiving NOV for Deliberate Misconduct.W/O Encls
ML20137H311
Person / Time
Issue date: 11/22/1995
From: Sanborn G
NRC
To: Beth Brown, Chamberlain D
NRC
Shared Package
ML20137H118 List:
References
FOIA-96-434 NUDOCS 9704020126
Download: ML20137H311 (1)


Text

a 6

November 22, 1995 NOTE T0:

1. Bill Brown
2. Dwight Chamberlain
3. Office of Enforcement /IA File b

%E --) -

FROM: Gary Sanborn, Enforcement Officer #-

SUBJECT:

TRANSCRIPTS OF INTERVIEWS WITH ZAHRT, SAWYER (IAs95-046; 95-047)

Attached are transcripts of interviews with Ken Zahrt and Roland Sawyer, both of whom were interviewed by OI and DNMS after they objected to receiving NOVs for deliberate misconduct. As previously discussed with Joe Callan, DNMS will assume the primary responsibility for reviewing this ifcemation, as well as the written responses to the NOVs, and comparing this ; formation against the evidence compiled by Stier, Anderson & Malone.

The reason for the redaction of a portion of pages 106-107 of Mr. Sawyer's interview is that Mr. Sawyer makes a remark about the conduct of an NRC employee which is not relevant to our review and which is being treated separately.

cc w/o attachments:

1.JCallan  %

SJCollins i

h_

/ /f"{

yevQ ALU dwv

  • gkhid ificw 5 CuJ'V767 gi nd T'7 " A .,

/ (7Li Lf'll ARNING: ATA HED TERIA AY CONT N4INFORMATI ATjSHOUl.D'NOT:BE QMSEMINATE 'O ISCUSSEDLOUT rNRC.

/

9704020126 970324 PDR FOIA SAURO96-434 PDR 9761ohlX

_ . .i 1

I w 1 l

i; l r January 8, 1996 Reply to Notice of Violation (NRC INV No. 4-94-010)

E Pursuant to the provisions of 10 CFR 2.201, This is my l y).> .

written response to the Notice of Violation (NRC INV NO "~%.

4-94-010)

1. Violation of 10 CFR 50.5 (a) (2):

I Roland E.' Sawyer do hereby dispute any and all accusations made against me as outlined in Notice of violation letter IA 95-047. Especially the accusation of falsification of the HSF block. At no time in my career have ,

I falsified nor instructed any technician working E0E me to l falsify or intentionally create or recreate a survey that j was NOT performed. Due solely on the complexity of my l response I requested and received a meeting with Jonathan Armenta and Charles Kane on November 13, 1995. As part of my formal response I request a transcript of this meeting for my records and to make my attorney aware of what was put into the investigation based on my interview.  ;

2. Corrective steps taken and results acheived:

a.) SEG's corrective action was to remove myself from the Fort St. Vrain project and force my resignation dated 8/15/94 b.) The results were negligable at best based on the l fact that to this date the are as many or more problems than there was at the time of my termination from site. This project was doomed from its conception, problems that were  !

brought to light were passed up through the chain of command and squashed at the levels of Dick Sexton and Ed Parsons.

Even when Oakridge management (Neely and Arrowsmith) did happen-to'get wind of concerns or problems they, in I conjunction with Sexton and Parsons quickly shuffled them  !

under the carpet and expertly covered their tracks with a  ;

smoke screen.'As the dayshift RP Supv I was told many times '

to "Shpt up and do your job" or "That's not your concern".  ;

At many times throughout the project " upper management" .

deliberately intimidated me and forced me to work in an l atmosphere of subversion and duress if I did not "Do my job!'.

()

N.

W OB%

s iiw p m y.

a -

't .

3. Corrective steps that will be taken to avoid further violations:

Due to the carefully choreographed and premeditated nature of an investigation, that most people would call a

" WITCH HUNT", in which I was accussed of falsifying a HSF block survey even though there were many people who witnessed me doing the survey. This does nothing more than tell me that the investigation team had to find people that were expendable and they did just that. However, during the investigation the nightshift supervisors' name was on as many or more of the so called falsified surveys! Was this individual , Mike Miles, persecuted like I was? the answer is NO !

My corrective action is to retire from the nuclear industry after what I thought was 14 years of dedicated service to a profession that I still very much care about and enjoy . However the true corrective action vill have to come from you, the NRC , do your own investigation and then pass judgement. for instance find the original MORT Report, read my deposition, I don't think anyone even heard what I said. In my opinion the SAM report was nothing more than a case of bureaucratic lip service to both myself and Ken Zahrt.

4. Date when full compliance will be achieved:

August 16, 1994 i

Sincerely,  !

I Roland E. Sawyer January 8, 1996 cc:

/ file /personnal

/ file / attorney

/USNRC Attn: Document Control Desk

. Washington, D.C. 20555

/ Regional Administrator, Region IV

'611 Ryan Plaza Drive Suite 400 Arlington, Texas 76011 l

I 1

.