IR 05000730/2008001

From kanterella
Revision as of 23:19, 16 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Const Insp Rept 40-6659/85-05 on 851022-23.No Violation Noted.Corrective Actions Re Violations Noted During 850730-0801 Insp Not Reviewed
ML20137N687
Person / Time
Site: 04006659, 05000730
Issue date: 11/21/1985
From: Pettengill H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Jennifer Whitman
PETROTOMICS
Shared Package
ML20137N694 List:
References
TASK-TF, TASK-URFO NUDOCS 8512040206
Download: ML20137N687 (2)


Text

-

.

DISTRIBUTION 40-6659/GRK/85/11/15/0-1- "c/oDMBl(IE-07)

NOV 21 1985 LFMB DBangart, RIV GKonwinski HPettengill HRose owers, W URF0:GRK JPerry, Info Systems Docket No. 40-6659 YHughes, RIV License No. SUA-551 URF0 r/f Suspense File Petrotomics Company ATTN: Mr. Jud Whitman Shirley Basin Mill P.O. Box 2509 Shirley Basin, WY 82615 Gentlemen:

This refers to the special construction inspection conducted by Mr. Konwinski of this office on October 22 and 23,1985, of the activities authorized by NRC Source Material License SUA-551 and to the discussion of out findings held by the inspector with members of your ,

staff at the conclusion of the inspectio The enclosed NRC Inspection Report 40-6659/85-005 documents this inspectio The inspection was an examination of the activities conducted under the license as they relate to placement of an interim reclamation cover over the general mill site disposal area and to compliance with the Commission's rules and regulations, and the conditions c' the licens The inspection consisted of a field examination of the interim cover as well as observations of interim cover placement procedure The inspector did not review the corrective actions you had taken relative to those violations identified during our previous radiation safety inspection which was conducted on July 30-August 1, 198 The inspector observed no violations for those activities examined during this inspectio In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the 4'

NRC's Public Document Roo REC 4 LIC40 k\

SUA-0551 PDR 0FC : : : : : : :

2..__ ____________:____________:____________:________ .._:____________:____________:__________.

NAME :  : : : : : :

_____:____________:____________:_________ ._:____________:____________:____________:-__________

DATE :85/11/21 : : : : : :

.

.

40-6659/GRK/85/11/15/0-2_

Should you have any questions concerning this letter, we will be pleased to discuss them with yo

Sincerely, Harry J. P ttengill, Chief Licensing Branch 2 Uranium Recovery Field Office, Region IV Enclosure: Appendix A - Inspection Report 40-6659/85-005 cc: Wyoming, DEQ (2)

Wyoming, Radiological Health Dep t

,

.?

-

~.

0FC : R : L : U0 : UF :~ UR 0 : :

_____:_ _____:___J- , , ,

,

__

_ _:-___________:___________

NAME : winski : GPan burn : H se :HPet ill : RD . .1

-

,___ s_ _____.___ -_ __ ___._______'_ __:____________:-____----__

BATE $8511/21 $ _ _$_[(_J. g_ f(_ :_ _ //_ _ _ _ _//fyht,:

ll ik

_ _ _ : _ _ _ _ _fdI[f :

Y$