NUREG-1031, Forwards Sser 4 (NUREG-1031).W/o Encl

From kanterella
Revision as of 10:30, 15 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Sser 4 (NUREG-1031).W/o Encl
ML20137Z423
Person / Time
Site:  Dominion icon.png
Issue date: 12/06/1985
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
RTR-NUREG-1031 NUDOCS 8512110299
Download: ML20137Z423 (1)


Text

-

l Docket No.: 50-423 i DEC 0 61985 Mr. John F. Opeka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270

Dear Mr.-Opeka:

Subject:

Issuance of Supplement No. 4 to NUREG-1031 - Millstone Nuclear Power Station, Unit No. 3 The U. S. Nuclear-Regulatory Commission has issued Supplement No. 4 to the Millstone Nuclear Power Station, Unit No. 3 Safety Evaluation Report related to operation of the facility.

Two copies of this report (NUREG-1031 Supplement No. 4) are enclosed for your use. Twenty additional copies will be forwarded when they have returned from our printer-contractor.

Sincerely, l6l B. J. Youngblood, Director PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

NUREG-1031 Supplement No. 4 (2 copies)

DISTRIRUTION:

.Mi NRC'PDR ~ ~'"'S Local PDR PRC System NSIC PWR#4 R/F MRushbrook E0oolittle OELD JKopeck P ' WR-A PWR-A PWR 4 -A MR k:macj D itTTe BJYaun blood

/ y /85

(/85 f r)) Q 85 8512110299 851206 .

PDR ADOCK 05000423 E PDR u