ML20072E914
| ML20072E914 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 08/16/1994 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Borchardt R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20072E917 | List: |
| References | |
| MFN-097-94, MFN-97-94, NUDOCS 9408230142 | |
| Download: ML20072E914 (1) | |
Text
.
(.
9
. GENuclear Energy l
l P. W. Marriott, Manager GeneralEkctric Company 1 AdvnncedPlant Technologes 17S Curtner Avenue. MC 781 Sv1 Jose, CA 95125-1014 '
4% 9256948(phone) 408925-1193(facsimile) l l
l l
.i' August 16,1994 MFN No. 097-94 Docket STN 524)04 Document Control Desk l U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Richard W. Borchardt, Director Standardization Project Directorate -
Subject:
Transmittal of Simplified Boiling Water Reactor (SBWR)
Scaling Report Enclosed please find a copy of the report " Scaling of the SBWR Related Tests," -
datedJuly 1994.
Sincercly,
) l n)kV L P. W. M. rriott, Ma,hager '
Advanced Plant Technologies l
Enclosure . )l cc: F. W. Hasselberg (w/l copy of Enclosure)
M. Malloy (w/2 copies of Enclosure) l l
?
i 200CD'd .
Oh*
\ '
9408230142 940816 ,
PDR ADOCK 05200004
- A PDR