ML20076F984

From kanterella
Revision as of 14:09, 26 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 0 to Second 10-Yr Interval ISI Plan for Callaway Nuclear Power Plant for NRC Approval So That Changes May Be Implemented 950801,which Is Start of Second 10-yr ISI Interval.First ISI Interval Extended to 950731
ML20076F984
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/12/1994
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20076F985 List:
References
ULNRC-3086, NUDOCS 9410180372
Download: ML20076F984 (3)


Text

. . . , -, . . . . . ._. . -

b 1901 Choutisd Avenue '

Post Of6ce Box 149'- i St. loins, Muouri G3765 l 314-554-2650 J 1 l

1

l

'l o ~ 's m "c" Union E"$la,""^*"'

1

' ELECTRIC l b October 12, 1994 i

U.S. Nuclear Regulatory Commission )

ATTN.: Document Control Desk Mail Station P1-137 .!

Washington, DC 20555 Gentlemen: ULNRC- 30 8 6 CALLAWAY PLANT DOCKET NUMBER 50-483 i CALLAWAY PLANT INSERVICE INSPECTION PROGRAM PLAN i i

~!

Transmitted herewith is a copy of the Second Ten-Year Interval Inservice Inspection Program: Plan for ,

Callaway Plant. This program was developed.in l compliance with rules and regulations of 10CFR50.55a )

and Section XI of the ASME Boiler and Pressure Vessel l Code, 1989 Edition. NRC staff approval of this .;

submittal is rey ested so that these changes may be ,

implemented Aug' ,t 1, 1995, which is the start of the .:

second 10-year .SI interval. The first ISI inspection interval was.eltended from December 18, 1994 to  ;

July 31, 1995 as allowed by ASME Section XI, Paragraph.  ;

IWA-2430. j Changes to the Callaway ISI-Program are )

subject to the fee provisions of 10CFR170. Therefore, j Union Electric will accept charges incurred as a result of the NRC review. If you have any questions concern-ing this submittal, please contact us.

Ve truly ours, 9

Donald F. Schnell WEK/jdg Attachment

y. 0c4.t'. r CLor j

l j 9410180372 941012 PDR ADDCK 05000483

.PDR f {j  ;

o fg <

1 STATE OF MISSOURI )

) SS '

CITY OF ST. LOUIS )

Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

D6nald ~

F-. Schnell Senior Vic's President Nuclear SUBSCRIBED and sworn to before me this /o7 "

day of defdht) , 1994.

i MW f/ %

M//

(/ (/ (/

BARBARA J. PFAFF NOTARY PUBLIC-STATE OF MISSOURI MY COMMISSION EXPIRLS APRIL 22,1997 SI. LOUIS COUNTX i

cc: T. A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W. 1 Washington, D.C. 20037 1

M. H. Fletcher Professional Nuclear Consulting, Inc.

18225-A Flower Hill Way Gaithersburg, MD 20879-5334 L. Robert Greger Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, IL 60532-4351 Bruce Bartlett Callaway Resident Office U.S. Regulatory Commission RR#1 Steedman, MO 65077 L. R. Wharton (2)

Orfice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 l

,