Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217D7961999-10-12012 October 1999 Proposed Tech Specs Pages,Removing Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A ML20210R8281999-08-13013 August 1999 Revised Bases Page B.3/4.9-6 to TS Section 3/4.9,providing Clarity & Consistency with Sys Design Description in UFSAR Sections 8.3.2.1 & 8.3.2.2 ML20209J2321999-07-16016 July 1999 Proposed Tech Specs 3/4.7.D Replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Sfch with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs ML20196K1941999-06-30030 June 1999 Rev 2.0 to Chapter 11 of Quad Cities Offsite Dose Calculation Manual ML20209C2951999-06-29029 June 1999 Proposed Tech Specs Section 3/4.3.C, Reactivity Control - Control Rod Operability ML20211C3311999-04-30030 April 1999 Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205L2631999-04-0505 April 1999 Tech Spec Page B 3/4.5-2 to TS Section 3/4.5, ECCS, to Clarify Requirement Discussed in ML20205J9741999-03-30030 March 1999 Proposed Tech Specs,Deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info ML20205J9321999-03-30030 March 1999 Proposed Tech Specs 3/4.6.E Changing SRs 4.6.E.2 to Allow one-time Extension of 18 Month Requirement to Pressure Test or Replace One Half of MSSVs to Interval of 24 Months ML20205J9911999-03-30030 March 1999 Proposed Tech Specs Allowing Alternative Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable ML20199L6921999-01-21021 January 1999 Proposed Tech Specs Section 3/4.6.I,relocating from Chemistry TS Requirements to UFSAR ML20199L7741999-01-21021 January 1999 Proposed Tech Specs Bases for Sections 3/4.10.K & 3/4.10.L, Provides Description of Design & Operation of RHR SD Cooling Subsystem ML20196H4571998-11-30030 November 1998 Proposed Tech Specs 3/4.8.J, Safe Shutdown Makeup Pump, Reducing Current AOT from 67 Days to 14 Days ML20196F6451998-11-30030 November 1998 Proposed Tech Specs 3/4.1.A,3/4.10.B & 3/4.12.B,proposing Changes to Relocate Requirement to Remove RPS Shorting Links Which Enable non-coincident Scram for Neutron Instrumentation,To Licensee Controlled Document ML20196K5861998-11-0505 November 1998 Rev 3 to Qcap 0280-01, Process Control Program for Processing of Radioactive Wet Wastes at Quad Cities Nuclear Power Station ML20155D8091998-10-29029 October 1998 Proposed Tech Specs Bases Sections 3/4.2.D & 3/4.5.D, Providing Clarity & Consistency with Sys Design Description Contained in UFSAR Section 5.4.6.2 ML20195J9041998-09-24024 September 1998 Rev 0 to TR-VQ1500-02, Clean ECCS Suction Strainer Head Loss Test Rept ML20151S7991998-08-31031 August 1998 Proposed Tech Specs,Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig, IAW SR 4.7.D.6 ML20236W8401998-07-31031 July 1998 Proposed Tech Specs Bases 3/4.7.C & 3/4.7.12.C,clarifying Testing Requirements for Primary Containment Excess Flow Check Valves ML20247D7761998-05-0505 May 1998 Proposed Tech Specs Page B 3/4.4-1,changing Administrative Error.Bases for Net Quantity of Gallons for Solution Is Changed from 3254 (Correct Quantity) to 3245 ML20246Q3481998-04-29029 April 1998 TS Page B 3/4.5-3,reflecting Change to TS Bases for Section 3/4.5.C ML20217G1481998-03-27027 March 1998 Proposed Tech Specs Bases Section 3/4.5.A,reflecting Design Info Contained in Rev 4 to Ufsar,Dtd Apr 1997 ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20196G0271997-05-0101 May 1997 Proposed Tech Specs 4.9.A.8.b Revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3321997-04-29029 April 1997 Proposed Tech Specs,Permitting Loading of ATRIUM-9B Fuel in Plant Unit Core for Operational Modes 3,4 & 5.Modes Will Support Refueling Activities Such as Fuel Load,Vessel re- Assembly & Single Rod Timing ML20138B3231997-04-21021 April 1997 Proposed Tech Specs,Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Unit 2 Cycle 15 Operation Scheduled to Begin 970519 ML20137G3981997-03-26026 March 1997 Proposed Tech Specs 3/4.7.P Re Standby Gas Treatment & TS 5.2.C Re Secondary Containment ML20135F7321997-03-0303 March 1997 Proposed Tech Spec Bases 3/4.9.E,clarifying Purpose of SR 4.9.E ML20135D9461997-02-24024 February 1997 Proposed Tech Specs,Clarifying Bases for TS Surveillance 4.8.D.5.c ML20138L4011997-02-17017 February 1997 Proposed Tech Specs Section 2.1.B Re Thermal Power,Section 3/4.11 Re Power Distribution Limits,Section 3/4.6 Re Primary Sys Boundary,Section 5.3 Re Reactor Core & Section 6.9 Re Reporting Requirements ML20138L3701997-02-17017 February 1997 Proposed Tech Specs 4.9.A.8.h Re Diesel Generator Endurance Test Surveillance Requirements ML20134D2191997-01-27027 January 1997 Proposed Tech Specs Deleting marked-up Sentence from TS Bases for Section 3/4.7.K ML20129K3321996-10-18018 October 1996 Cycle 15 Startup Test Results ML20129C2391996-10-16016 October 1996 Proposed Tech Specs for Dresden 2 & 3 & Quad Cities 1 & 2, marked-up to Show Transition Verbiage ML20129D3981996-09-20020 September 1996 Proposed Tech Specs 3/4.6.K,updating Pressure-Temp Curves to 22 Effective Full Power Yrs & TS Bases ML20216H8841996-06-30030 June 1996 Revs to ODCM for Quad Cities,Including Rev 1.8 to Chapters 10,11,12 & App F ML20116F3971996-06-30030 June 1996 Rev 1.8 to ODCM, Annex,Chapters 10,11,12 & App F ML20113C3571996-06-25025 June 1996 Proposed Tech Specs Re Upgrade Program ML20113A7861996-06-10010 June 1996 Proposed Tech Specs,App A,To Reflect Transition of Fuel Supplier from General Electric to Siemens Power Corp ML20117D7121996-05-0606 May 1996 Proposed Tech Specs,Implementing New LCO & SR Re Revs to TS for 10CFR50,App J,Lrt ML20107A1881996-04-0404 April 1996 Proposed Tech Specs 3.4/4.4 Re Standby Liquid Control Sys ML20101H1381996-03-25025 March 1996 Complete Version of TS Upgrade Program Pages That Reflect Current Configuration of Plant & Specifies SRs That Will Not Be Current Upon Implementation of Tsup Project ML20097D9231996-02-0808 February 1996 Proposed Tech Specs,Upgrading Existing TS 3/4.5, Eccs ML20100C0441996-01-24024 January 1996 Secondary Containment Leak Test Summary ML20093K7721995-10-12012 October 1995 Quad-Cities Nuclear Power Station Unit 2 Cycle 14 Startup Test Results Summary ML20098A3821995-09-20020 September 1995 Proposed Tech Specs,Revising TS Upgrade Program & Improving Plant Submittals ML20086D4741995-06-30030 June 1995 Proposed Tech Specs Re TS Upgrade Program for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20087H8651995-05-0202 May 1995 Proposed Tech Specs Re TS Upgrade Program Section 3/4.10 ML20082H7481995-04-10010 April 1995 Proposed Tech Specs,Revising SR for HPCI & RCIC Sys ML20080K8171995-02-23023 February 1995 Proposed Tech Specs,Changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc 1999-08-13
[Table view] Category:TEST REPORT
MONTHYEARML20195J9041998-09-24024 September 1998 Rev 0 to TR-VQ1500-02, Clean ECCS Suction Strainer Head Loss Test Rept ML20129K3321996-10-18018 October 1996 Cycle 15 Startup Test Results ML20100C0441996-01-24024 January 1996 Secondary Containment Leak Test Summary ML20093K7721995-10-12012 October 1995 Quad-Cities Nuclear Power Station Unit 2 Cycle 14 Startup Test Results Summary ML20078M9041994-11-23023 November 1994 Quad-Cities Nuclear Power Station Unit One Cycle Fourteen Startup Test Results Summary ML20078B9221994-10-20020 October 1994 Reactor Containment Bldg Integrated Leak Rate Test,Quad- Cities Nuclear Power Station,Unit 1,940723-24 ML20059G0031993-10-29029 October 1993 Revised Quad-Cities Nuclear Power Station Unit 2 Cycle 13 Startup Test Results ML20056F7161993-08-24024 August 1993 Quad-Cities Nuclear Power Station,Unit 2 Cycle 13 Startup Test Results Rept ML20056F0621993-08-19019 August 1993 Quad-Cities Nuclear Power Station,Unit 1 Cycle 12 Startup Test Results ML20056F0631993-08-19019 August 1993 Quad-Cities Nuclear Power Station,Unit 2 Cycle 12 Startup Test Results ML20046B5781993-05-19019 May 1993 Reactor Containment Bldg Integrated Leak Rate Test Quad- Cities Nuclear Power Station. ML20044C0631993-03-0909 March 1993 Cycle 13 Startup Test Rept Summary. W/930309 Ltr ML20102A6931992-07-23023 July 1992 Quad-Cities Nuclear Power Station,Unit 2,Cycle 12 Startup Test Results ML20099H0521992-04-0606 April 1992 Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station Unit II for Period 920401-06 ML20085A9551991-07-19019 July 1991 Quad-Cities Nuclear Power Station Unit 1 Cycle 12 Startup Test Results ML20077G7941991-03-0202 March 1991 Reactor Containment Bldg Integrated Leak Rate Test. W/ ML20011F5141990-02-26026 February 1990 Quad-Cities Nuclear Power Station Unit 1 Cycle 11 Startup Test Results. W/900226 Ltr ML20011E7161990-02-0606 February 1990 Reactor Containment Bldg Integrated Leak Rate Test,Quad Cities Nuclear Power Station Unit 1,891114-15. ML20055C8591989-10-31031 October 1989 Special Neutron Attenuation Test for High Density Spent Fuel Racks (Wet), Final Rept ML20045H5641989-09-19019 September 1989 Equipment Qualification Rept for Moore,Isolator,Moore Signal Transmitter & Marathon Fuse Block,CWE-3840,890919. W/930713 Ltr ML20206F4641988-11-16016 November 1988 Reactor Containment Bldg Integrated Leak Rate Test, 880612-13 ML20205H1071988-10-19019 October 1988 Cycle 10 Startup Test Results ML20153G0421988-06-13013 June 1988 Reactor Containment Bldg Integrated Leak Rate Test ML20150C1541987-12-0606 December 1987 Reactor Containment Bldg Integrated Leak Rate Test ML20153G3481987-11-25025 November 1987 Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept ML20238E2911987-06-25025 June 1987 Rev 0 to Irradiation Study of Boraflex Neutron Absorber, Interim Test Data ML20205K1401987-03-26026 March 1987 Quad-Cities Nuclear Power Station Unit 2 Cycle 9 Startup Test Results ML20210C8591986-10-15015 October 1986 Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station,Unit 2,861014-15 ML20199F1321986-06-17017 June 1986 Quad-Cities Nuclear Power Station Unit 1 Cycle 9 Startup Test Results ML20197A7621986-03-23023 March 1986 Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station,Unit 1,860322-23 ML20134N7871985-08-28028 August 1985 Quad-Cities Nuclear Power Station Unit 2,Cycle 8,Startup Test Results ML20135F1211985-05-28028 May 1985 Reactor Containment Bldg Integrated Leak Rate Test, for 850526-28 ML20108A4921984-11-0808 November 1984 Cycle 8 Startup Test Results ML20100N1091984-08-31031 August 1984 Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept ML20107F0991984-07-24024 July 1984 Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station,Unit One,840724-27 ML20084N0341984-05-0808 May 1984 Cycle 7 Startup Test Results ML20100N1151984-03-31031 March 1984 Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 18, Final Rept ML20084F7091984-02-10010 February 1984 Reactor Containment Bldg Integrated Leak Rate Test ML20082V2381983-12-13013 December 1983 As-Found Type B & C Local Leak Rate Test Results for Unit 1 During Last Three Refueling Outages ML20071A8371983-02-17017 February 1983 Quad-Cities Nuclear Power Station,Unit 1,Cycle 7 Startup Test Results ML20028F1151983-01-20020 January 1983 Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station,Unit One,821216-17. ML20042A6411982-03-15015 March 1982 Quad-Cities Nuclear Power Station Unit 2,Cycle 6 Startup Test Results. ML19341D6711981-04-0303 April 1981 Quad-Cities Nuclear Power Station,Unit 1,Cycle 6 Startup Test Results. ML19318B6651980-06-19019 June 1980 Cycle 5 Startup Test Results. ML19321B1711980-03-12012 March 1980 Reactor Containment Bldg Integrated Leak Rate Test. ML19257D1571979-12-31031 December 1979 Quad-Cities Nuclear Power Station Units 1 & 2 Secondary Containment Leak Rate Test Summary, Per Tech Specs Section 6.6.C.3 ML19225A5521979-07-0505 July 1979 Reactor Containment Bldg Integrated Leak Rate Test, 790219-22 ML19263D2101979-03-0606 March 1979 Secondary Containment Leak Test Rept.Concludes Standby Gas Treatment Sys Maintains 1/4 Inch of Water Vacuum in Secondary Containment Bldg Under Calm Conditions W/Flow Rate No Higher than 4,000 Cfm ML17187A8031969-05-16016 May 1969 Cavitation Test Rept 12x14x14-1/2 Cvds Pump. 1998-09-24
[Table view] |
Text
.
4 i
QUAD-CITIES NL'LLEAR POWER STATION UNIT ONE CYCLE FOURTEEN STARTUP TEST RESULTS
SUMMARY
i TECHRI'DUICYCLl4 9412050199 941123 PDR ADOCK 05000254 P PDR
e-4 l'
TABLE OF CONTENTS TEST NO. TITLE PAGE 1 SHUTDOWN MARGIN 1 2 CORE VERIFICATION 1 3 INITIAL CRITICAL 2 4 TIP REPRODUCIBILITY 3 AND CORE POWER i
TECINtirr\U1CYCLl4 j i
e '
- 1. Shutdown Marain Demonstration and Control Rod Functional Checks ,
Purpose The purpose of this test is to demonstrate for this core loading in the most-reactive. condition during the-operating cycle, that
- the reactor can be made subcritical with the strongest control rod fully withdrawn and all other rods fully inserted.
Criteria If a shutdown margin of 0.290% ok (0.25% + R + B.C settling penalty) cannot be demonstrated with the strongest control rod ;
fully withdrawn, the core loading must be altered to achieve this margin. The core reactivity has been calculated to be at a maximum 0 MWD /ST into the cycle and R is given as 0.0Xok.
The control rod B,C settling penalty for Unit One is 0.04%ok.
Results and Discussion ,
s On July 8,1994 control rod E-5 was fully withdrawn to demonstrate ,
that the reactor would remain subcritical with the strongest rod .
out. This rod was calculated by Nuclear Fuel Services (NFS) to t have the highest worth with the core fully loaded. The strongest ;
rod out maneuver was performed to allow single control rod withdrawals for CRD testing.
Control rod functional subcritical checks were performed as part ;
of control rod friction testing. No unexpected reactivity insertions were observed when any of the 177 control rods were withdrawn.
Prior to the initial critical, NFS calculated the shutdown margin to be 1.22% ok (using a critical eigenvalue of 1.004) at 0 mwd /ST, which is the point of minimum shutdown margin for the cycle (R=0).
The difference between the estimated and actual critical eigenvalue was 0.494% ok. Corrections for temperature and period were -0.15% ok and .047% ok, respectively. Adding these ;
corrections to the NFS calculated value, the shutdown margin for ,
Cycle 14 was determined to be 1.517% ok.
- 2. Core Verification '
, Purpose The purpose of the core verification procedure is to verify proper core location and orientation for each fuel assembly. 1 I
l l
TECmRPTTUICYCLl4 }
.' i f
Criteria
~
Prior to reactor startup the actual core configuration shall be verified to be ' identical to the planned core configuration.
Results and Discussion The Unit One Cycle 14 core verification was completed on July 7, ,
1994. Fuel assembly orientation, seating, and serial number were verified for each assembly. .,
The first inspect' ion was made to verify orientation and seating of assemblies. A second pass was subsequently made to verify bundle - ,
serial numbers. The four assemblies in cell location 42-07 were '
found not to be properly seated. These assemblies were removed from the core and the fuel support piece at 42-07 was reseated.
The four assemblies were then placed back into their. proper :
locations and verified to be located and seated correctly. ' The 7 Cycle 14 core map is shown in Figure 1.
- 3. Initial Critical Prediction Purpose The purpose of this test is to demonstrate the ability of NFS to [
calculate control rod worths and shutdown margin by predicting the _;
in-sequence critical. .
Criteria ,
NFS' prediction for the critical rod pattern must _ agree within 1%. ,
Ak to the actual critical rod pattern. A discrepancy greater than j 1% Ak will be cause for an On-Site Review and investigation by NFS. ;
Results and Discussion ;
On August 19, 1994, at 1408 hours0.0163 days <br />0.391 hours <br />0.00233 weeks <br />5.35744e-4 months <br /> the reactor was brought critical with a reactor water temperature at the time of criticality ofl i 122oF. The difference between the expected critical rod pattern (at 68oF)~and the actual critical rod. pattern was 0.00894 from rod '
i worth tables supplied by NFS. The temperature effect was -0.0015 Ak from NFS supplied corrections. The excess reactivity from the -i 111 second period was 0.00047 Ak. These reactivities. sum to 1 0.00697 Ak difference (0.697% Ak) between the~ expected critical i rod pattern'and the actual rod pattern. This is within the 1% Ak- l criteria of this test, and NFS' ability to predict control rod t worths is, therefore, successfully demonstrated.
]
i l
l rscummuicycu4 2
o l
-4 4 '. - - Core Power Distribution Symmetry Analysis '
Purpose i The purpose of this test is to determine the magnitude of- -
indicated core power dist'ibution r asymmetries using data (TIP i traces and 00-1) collected in conjunction with the CMC update. !
Criteria A. The total TIP uncertainty (including random noise and geometric uncertainties' obtained by averaging the uncertainties for all data sets) must be less than 9%. ,
B. The gross check of TIP signal symmetry should yield a maximum deviation between symmetrically located pairs of less than 25%.
Results and Discussion Due to a forced shutdown, this portion of the startup test program .
has not been. completed. A supplement to this report will be l issued upon completion of the test or in three months, whichever is-earliest.
t i
TECihRmUICYCL14 3
FIGURE 1 CYCLE 14 .
QUAD CITIES UNIT 1 REACTOR [ ,
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 ,
60 tmn two tmn tune tes trax inus imm tm7 tum -
60 58 tum tras4 tm4: tmes inm tmsc tmn tmo in2ss imo tuo tuo4 58 56 (mn tms) tuss 2 tnne (mu tmsc tmo imio inns tmn (mn tmn tmst tusi tuss twn twie imx 56 54 tuu tusa tus4 tuss tus2 tmn uso msu vm msso uso vmo nos mus tmn tmso tun trau ims tvan 54 52 tmso tmv tvan iniss msor tma moos um tum mso4 twa (mu us.si tmn mn ms* tmsi ms4o tytm tras two tun 52 50 tus2 ten tea 3 tmo msx im4: m s3 m ai tmss vain tmo usu uni twsos u2n tmis um mo nun unn trTns tun tymn two 50 48 tuxi tvm tun ten tnm vmo (mu uns twso4 vmu tmsi uns two imis uns tmn msn (moi u2n tmn um tmso tmis tvm tm): twee 48 43 tmm tu4o imes msos vm4 vm uisi twoo2 msai msie unr vasi vas vmu msor va2n nx3 msn twni uni nun un vmu inm tvan imos 46 44 tmss tues .msn mo4 tmsi mu vma) vaso two msi tmis uin tmi4 twsti vaisi tmn va2n two mso vmss vam (moo vmes vasn twu tun 44 42 tras2 tmu tmso tmu mse vans twim van twns m st imo en teso was uns (mss um twns mn tmu mso4 tmsa v42n van tnm imis tun two 42 40 tus two mm imo2 msss was twns van tum7 um tum3 mss 4 twm uso twmi twn4 me tmn umis tmm us2n two vasn twsis uns nun tnm2 tnm tvm tmu 40 38 tmss two (nni mus una (neos mes vas4 mn twns vmu tms: unis tmos msn vms twns urn tme nxu twm va2n vmu uma twoon va274 nun tw tms4 tuos 38 33 tmn tmas (mas muo tmn ms, imn um tmn vaise twas vmu twne was two2 ima vmos (mn mn tem vmon tm3: unao mm un4 tmu vassa inns inm4 tm4o 36 34 tuu tmso imu n3soo msos twics va2m nw vain tmos una two em twas uin mss im3s was twns um inni vains vmu uns twoos van nuis (ms tnm3 tmn 34 32 ten im:7 inns urn twm unis twm vmu tmn mso twns van twsss mm tmn tum vain tmp van to mio imio nun twoos van 2 two vm tuis (mso tuui 32 3D teso inm inns msis (mn vans tme vmu twsu mso twn3 msse twm mm tw= twm vans ime msn twns va2m tws2 nxu twm vans tw man tmu inm tuns 30 28 ten tmn inne vmx ess twei v43is msas wx teos usu tmn um tmn wn vaan two urn tmst uxo ten uans uxn tam 2 twan uno msss imm imo tra 28 23 tous tuna inns usos twns mu tnm ua3a tm:4 wio twn2 vano imm u2o tmas two vam twna um tuns mn twn: vans (mss vana tmsa nuo imii tmso (mx 26 24 tuxi imu tmn mut vams twin vmis vmos v42s2 twas unn twne vars tmn vais nxu twn4 um twm moor tmss vam msas nuo tmrt uno vmir (mn in2s2 tun 24 22 tux 4 tms tmn tmo msss vazia twin mss 4 tmas unze twm vms: twns uns imu twns un. ims man twno um (mas van twu3 uns nun tmas inin trace twa 22 j 23 tuns tuus (mss inni um v4x4 twoo ms2e (Mn um tMss uns tmn m4s vam tma u2s tmn mat (mas van (M34 uns vant inm imis trats ime 20 18 tux 3 twn van unas (mse mo msa2 vasi twar u2si tmas uns twers twsis va2n twm vaan tmsa uxu nisse usm inns msa ux* tuoi tmu 18
, 10 tm* tun tmo msn msos vasa uru twem unsa van uso msse uxoo uxn una va m van nun LWan vam uxx n3soi un34 in N trao2 1923 16 14 inso two tun tmu imse vas2 tmi4 ums twue msas imx uns twus (mn vam (nm usu tmu tmn van m ai (mai inne imas tmso imu 14 12 tms4 tme tvm imis vm24 mso varu va2n twin wo twur vam um tmn vans twin um mu mso ums (ms4 ten tmu ten 12 i 10 two ten tuos tmis mso2 inm man vams imii van tmn imm una tms2 vans Exs tmn msn l
tms: tues tun lm4 10 l 8 imo (msi tus tuus tu4u imp vmso ums msso um4 nxie uxos vm ww 1 tmu teos (mss traos tmis imi 8 6 two in3n tuns tun tmoo imu tmu tmo tmn tms4 inn 4 tmse imo tniu tveoi tmas 1
tym4 tmas 6 4 tmp tuo2 tyT2is tv12sl tvTns tyf22o tvT2s2 lit 2ss tvT2? tvf24s (valo (m42 4 l 2 twa tuss 4 tmsi ruxs inne twa tuni tuus (mos imas 2 3 5 7 9 1
11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 lhpEM .; L.i:' . ;" ' her. Af v " " " " "
())
\ ,
l 4~
p i.3 ;.m yf