Interim Deficiency Rept,Item S-10 Re Masonry Wall Const Not Per Design Spec & FSAR Criteria.Initially Reported on 830513.Quality Confirmation Program Being Expanded to Include Reinsp & Verification of Masonry Walls
ML20080K188
Person / Time
Site: Zimmer
Issue date: 09/21/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0134, LOZ-83-134, S-10, NUDOCS 8309290040
Download: ML20080K188 (2)


Text

, .

. 4 i

l LI e

'A THE CINCINNATI GAS & ELECTRIC COMPANY -

CINCINNATt, OHIO 45201 Septembe r 21, 1983 LOZ-83-0134 J. WILLIAMS, Jft SENaOR vtCE PRESdDENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission j Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. J.G. Keppler Regional Administrator Gentlemen: l l

RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 l 10CFR50.55 (e) , ITEM S-10, MASONRY WALL '

CONSTRUCTION ?lOT PER DESIGN SPECIFICATION AND' FSAR CRITERIA W.O. 57300, JOB E-5590, FILE NO. 956C, S-10 This letter constitutes an interim report concerning the subject condition initially reported to the Commission on May 13, 1983 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e) . Based on a September 1,1983 telephone conversation between W. Forney (NRC) a nd D . S tephenson {

(CGEE),"an extension for submittal < of this report was granted I from'our' commitment date of September 12, 1983 to September 21,

~1983.

As indicated in our previous report, LOZ-83-0047, dated June-13,.1983, the Quality Confirmation Program (QCP) 'is being expanded to include reinspection and verification of-Category I Masonry Walls.- CGEE and Sargent & Lundy are presently developing a reinspection program to -ensure that the Masonry Walls will function as designed. The development of this program is expected to be completed by December 23, 1983 at which time a follow-up report will be submitted.

0 '

8309290040 830921

% D@4-eMq PDR ADOCK 05000350 } r- .

g .

S, - PDR. __ g

y-Mr. J.G. Keppler Regional Administrator September 21, 1983 LOZ-83-0134 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50,55 (e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY N IS ,'I . '

SENIOR VICE P SIDENT DJS/sfr i

cc: NRC Office of Inspection & Enforcement l Washington, D.C. 20555 NRC Senior Resident Inspector j ATTN: T.P. Gwynn NRC Zimmer Project Inspector, Region III 1