ML20087P367
| ML20087P367 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/30/1984 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20087P368 | List: |
| References | |
| 0210-L, 210-L, U-0704, U-704, NUDOCS 8404060342 | |
| Download: ML20087P367 (2) | |
Text
--
~
.. . s U- 0704 0210-L L 3 4 ( 2 9 )-8 4 (03 - 30 )-L ILLINDIS POWER 00MPANY CLINTON POWER STATION, P.o. BOX 678, CLINTON ILLINOIS 61727 March 30, 1984 Docket No.-50-461 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 o S
Subject:
Clinton Power Station Unit 1 FSAR Amendment No. 29
Dear Mr. Denton:
Illinois Power Company hereby files Amendment No. 29 dated March, 1984, for the Clinton Final Safety Analysis Report (CPS-FSAR). FSAR Amendment-No. 29 presents changes that update and clarify information. The major changes consist of:
a) Revisions to Chapter 13 to reflect the current organizational. structure,. training programs, plant procedures, and an updating of resumes in Appendix
-13A; b) Additional information in Section 3.9 on HVAC ductwork design; c) . Revisions to Section 3.9.on Fuel Assembly design; d) Changes to Section 9.5.on Fire Protection; e) Revisions to Chapter.17 on the Quality Assurance organization responsibilities. These changes do not reduce any quality program commitments; f)' Revisions to Appendix D on the TMI action plan responses, including.HPCS logic modifications.
i I
d.
@*Mwann, -
a- PDR
m
,- .. . ' h'
' U- 0704 0210-L L34 (29)-84 (03 -30 )-L March 30, 1984 Three (3)Lsigned originals and eighty-five (85) copies are furnished for amending.the FSAR sets provided to NRC per
- Sincerely yours,
'V
[ D. P. Hall Vice President
b1H: lam
. enclosures
' S u b s c r'i b e d a n'd sworn to before me the Godh. day of March, 1984.
114x $ Osw Notary Public My Commission E4 res.'./.b. . . /. . . .A..d..
I V
2 ud