Interim Deficiency Rept Re Lack of QA Program for Fire Protection Sys Installation.Document & Commitment Review Underway.Results Should Indicate That Branch Technical Position Apcsb 9.5-1,App A,Met.Next Rept Due by 830430
ML20070W099
Person / Time
Site: Zimmer
Issue date: 02/08/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2252, NUDOCS 8302180270
Download: ML20070W099 (1)


Text

~

I l

F Q l

\

(

k ,,g4[_M MIL' f CINCINNATl, OHIO 452o1 THE CINCINNATI GAS & ELECTRIC WM. H. ZIMMER NUCLEAR POWER STATION, UNIT 1 COMPANYFebruary 8, 1983 45153 QA-2252 P.O. BOX 201, MOSCOW, OH E A.BoRGM ANN

  • 1ENIOR VICC PRC5f DENT U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. J. G. Keppler Attention: Regional Administrator RE: WM. H. Z1hMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e) ITEM M-72, LACK OF QA PROGRAM FOR FP SYSTEM INSTALLATION - DOCKET No. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. 57300, FILE NO. NRC-8 Gentlemen: h ubject condition, This letter constitutes an interim report concerning t e stable deficiency under initially reported to the Commission as a potentially repor 10CFR50.55(e). i i lly anticipated, A document and commitment review, more extensive than or g nad commitments is in progress to identify the requirements and related the manner in which these were nical Position (BTP) APCSB 9.5-1, Appendix A, anIt is not possible to draw any definite conc implemented and documented.

from the review performed to date. that the design and i A, We anticipate that the results of this review will indicate thei requirements of BTP APCSB 9.5-1, Appen procurement controls implemented metand that documentation required fo lation and testing can be assembled.at which time a report will be submitted.

April 30, 1983 i port under 10CFR50.55(e).

We trust the above will be found acceptable as an inter m re Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By

~

[

E. A. BORGMANN 9302180270 830208 SENIOR VICE PRESIDENT PDR ADOCK 05000359 PDR S

FJS:jas cc: NRC Office of Inspection and Enforcement Washington, D.C. 20555 NRC Senior Resident Inspector )Cg07 Attn: W. F. Christianson Zimmer Project Inspector FEB 16 1983 Region III