ML021340543
| ML021340543 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/08/2002 |
| From: | Beasley J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LCV 1604-C | |
| Download: ML021340543 (2) | |
Text
J. Barnie Beasley, Jr., P.E. Southern Nuclear Vice President Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 L iffluAR I
MonFO "TIO 8Q==SUR WWJSNS SAEGUARDS INFORMATION)
UPNS-PRTON- THIS PAGE ISD)ECONTROLLED III I II I I I II i i in nil I II I I ii iI T Birmingham, Alabama 35201 Tel 205.992.7110 A
Fax 205.992.0403 SOUTHERN May 8, 2002 COMPANY Energy to Serve Your Worlds" Docket Nos.: 50-424 LCV 1604-C 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 Revised Response to Security Order Interim Compensatory Measure B.4.e Ladies and Gentlemen:
By letter dated March 18, 2002, Southern Nuclear Operating Company (SNC) provided responses to the Interim Compensatory Measures (ICM) contained in the February 25, 2002 Order to modify the Operating Licenses for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. SNC hereby revises its response to ICM B.4.e as shown in the enclosure to this letter. This information is being provided in accordance with the provisions of 10 CFR 50.4 (f).
J. B. Beasley, Jr. states that he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.
Sincerely, AJB easley, r.
Sworn to and subscribed before me this _ day of , 2002.
I) /
Notary Public My commission expires: /1 /6 1-I SAFEGARD INFORMATIN
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION )
UPON SEPARATION THIS PAGE ISDECONTROLLED )
( _E*&UAM WNORMATION, )
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION I
( UPON SEPARATION THIS PAGE ISDECONTROLLED U. S. Nuclear Regulatory Commission LCV 1604-C Page 2 JBB/BHW
Enclosure:
Revised Response to Interim Compensatory Measure B.4.e (Safeguards Information) cc: Southern Nuclear Operating Company Mr. J. T. Gasser (w/o enclosure)
Mr. M. Sheibani (w/o enclosure)
SNC Document Management U. S. Nuclear Regulatory Commission Mr. L.A. Reyes, Regional Administrator Mr. F. Rinaldi, Licensing Project Manager, NRR (w/o enclosure)
Mr. J. Zeiler, Senior Resident Inspector, Vogtle (w/o enclosure)
( ENCLOSURE CONTAINS SAFEGUARDS INFORMATION )
( UPON SEPARATION THIS PAGE ISDECONTROLLED )