ML20058K798

From kanterella
Revision as of 02:54, 26 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
AO 75-3:on 750128,both Unit 2 Safety Injection Pumps Incapable of Starting on Automatic SI Signal from Approx 0900 to 100 h.W/750129 Ltr
ML20058K798
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/29/1975
From: Clarity R
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
75-3, NUDOCS 9102140414
Download: ML20058K798 (2)


Text