DCL-03-006, Twenty-Day Response to NRC Order for Compensatory Measures Related to Access Authorization
| ML030360236 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/27/2003 |
| From: | Oatley D Pacific Gas & Electric Co |
| To: | Collins S Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-03-006, OL-DPR-80, OL-DPR-82 | |
| Download: ML030360236 (3) | |
Text
K ElectricCompany PacdicGas and Diablo Canyon Power Plant P0. Box 56 Avila Beach, CA 93424 January 27, 2003 800.545.6000 PG&E Letter DCL-03-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 ATIN: Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Room 5 D2, Mail Stop 0-5 E7 11555 Rockville Pike Rockville, MD 20852-2738 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Twenty-Day Response to NRC Order for Compensatory Measures Related to Access Authorization
Dear Mr. Collins:
This letter is in response to the NRC letter dated January 7, 2003, in which the NRC issued an Order to Pacific Gas and Electric Company (PG&E) that modifies the current operating licenses for Diablo Canyon Power Plant (DCPP), Units I and 2.
The Order was immediately effective and requires compliance with specific access authorization compensatory measures described in Attachment 2 to the Order.
The Order requires a response within twenty days. Enclosure 1 contains PG&E's twenty-day response to the Order for DCPP. Enclosure 2 contains PG&E's schedule for compliance with each requirement described in Attachment 2 to the Order.
This response is submitted in accordance with 10 CFR 2.202 and 10 CFR 73.21.
While not safeguards, the enclosures contain security information that should be withheld from public disclosure in accordance with 10 CFR 2.790. Ifyou have any questions, please contact me at 805-545-4350 or William Ryan at 805-545-3329.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 9 Comanche Peak 9 Diablo Canyon 9 Palo Verde e South Texas Project o Wolf Creek 1,AO
Document Control Desk PG&E Letter DCL-03-006 January 27, 2003 Page 2 Sincerely, azA!ýýe David H. Oatley Vice Presidentand GeneralManager- Diablo Canyon LMP/A0571827 Enclosures cclenc: Ellis W. Merschoff, Region IV David L. Proulx, Resident Girija S. Shukla, NRR Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway a Comanche Peak
- Diabto Canyon
- Palo Verde a South Texas Project e Wolf Creek
PG&E Letter DCL-03-006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
)) Docket No. 50-275 In the Matter of Facility Operating License PACIFIC GAS AND ELECTRIC COMPANY ) No. DPR-80
)
Diablo Canyon Power Plant ) Docket No. 50-323 Units I and 2 ) Facility Operating License
) No. DPR-82 AFFIDAVIT David H. Oatley, of lawful age, first being duly sworn upon oath states that he is Vice President and General Manager - Diablo Canyon of Pacific Gas and Electric Company; that he has executed the twenty-day response to the NRC Security Order dated January 7, 2003, on behalf of said company with full power and authority to do so; that he is familiar with the content thereof; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.
David H. Oatley Vice President and General Manager - Diablo Canyon Subscribed and sworn to before me this 27th day of January, 2003 Notary Public County of San Luis Obispo ...... .. . .
State of California CommiSSIOn Notary #c'roR38 Public - California 4 San Lui Obtspo County 1M *cann-L Exo am,*oun