ML20063G304
| ML20063G304 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/07/1994 |
| From: | Fenech R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20063G305 | List: |
| References | |
| NUDOCS 9402150412 | |
| Download: ML20063G304 (23) | |
Text
,
y
- }o . * ~
, -y "
g En i t
Tennessee Valey Autnonty. Post Office Box 2000. &cdy-Daisy; Tennessee 3737S 2000 l
Robert A. Fenech
%ce President. Segacyah Nacicar Plant February 7, 1994 ;
TVA-SQN-TS-93-11 10 CFR 50.90' U.S. Nuclear Regulatory Commission ATTN: Document Control Desk .
Washington, D.C. 20555 Gentlemen: ,
In the Matter of ) Docket Nos. 50-327 Tennessee Valley' Authority ) 50-328 ;
1 SEQUOYAH NUCLEAR PLANT (SQN) - TFCHNICAL SPECIFICATION (TS) CHANGE 93-11,
" SNUBBER TRENDING ANALYSIS REQUIREMENTS" >
In accordance with 10 CFR 50.'90, we are enclosing a requested amendment !
to Licenses DPR-77 and DPR-79 to change the'TSs of.SQN. Units 1 and 2.. !
The proposed change'will delete the prescriptive information contained !
within the Snubber Service Life Program of TS 3.7.9 and replace the wording with that from the NRC. approved Westinghouse Electric Corporation '
Standard TS, Revision 4a.- Additionally, changes'are being proposed based .;
upon previously received NRC comments. !
The proposed TS change is identified in. Enclosure 1. The justification '}
for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant -;
to 10 CFR 50.92 is'provided in Enclosure 3.: j TVA requests a 45-day implementation. period for this TS change following issuance. Since'the change is expected to be a resource savings that'is i applicable during refueling outages, TVA requests that this TS change be 3 approved as soon as possible. -l I
l
'm 9402150412 940207i.!? g; A PDR ADOCK._05000327 /'t g p PDR. m fj o: l
+. .
+ j U.S. - Nuclear Regulatory Comission ]
Page 2 . i February 7, 1994 >
i Please direct questions concerning this issue to W. C. Ludwig at. !
(615) 843-7460.
Sincerely,
.}
' =d l Robert A. Fenech ,
s Sworn to and subs ibed before me !
this M day of 1994 h%f Nota y Public l -- ;
1 My Comission Expires 77 1
Enclosures .'
cc (Enclosures) .,
Mr. D. E. LaBarge, Project Manager i U.S. Nuclear Regulatory. Comission -l One White Flint, North i 11555 Rockville Pike l Rockville, Maryland 20852-2739 :
Mr4 Michael H. Mobley, Director (w/o Enclosures)
Divieion.of Radiological Health 'l 3rd Y1oor L 8 C Annex 61 3hurch Street Pashv111e, Tennessee 37243-1532 I NRC Resident Inspector Sequoyah Nuclear Plant l 2600 Igou. Ferry Road !
b Soddy-Daisy, Tennessee 37379-3624 .i Regional Administrator U.S. Nuclear Regulatory Comission Region'II 101 Marietta. Street NW, Suite 2900.
Atlanta, Georgia 30323-2711
)
l