Advises That Util Will Not Submit Addl Proposed TS Change Re Station Batteries in Mar 1994,however Addl Change Will Be Submitted Once IEEE Std 450 Approved
ML20065G480
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/30/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9404130010
Download: ML20065G480 (2)


Text

' Sistion Support D psrtment ~

5Sh~

~

PECO ENERGY =; =g,,,,,

4 m a+un,acknoui~aro W1)w, PA iMm7 WM r

March 30,1994 -

  • Docket Nos. 50-352

-50 353 Ucense Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

' Limerick Generating Station, Units 1 and 2 Delayed Submittal of Proposed Technical Specifications Change Regarding Station Batteries Gentlemen:

By letter dated September 10,1993, PECO Energy Company rnade a commitment to submit an additional proposed Technical Specifications (TS) change regarding station battery TS Surveillance Requiremeris (SRs). The commitment was added to the September 10,1993 letter which was in response to a Request for Additional Information (RAI) regarding Technical Specifications (TS) Change Request No. 92-03-0 that proposed to increase the surveillance interval from a nominal 18 months to a nominal 24 months for certain TS SRs associated with instrument calibrations.

>; The commitment was to incorporate the modified performance test and frequency described in the 1993 draft revision of the Institute of Electrical and Electronics Engineers (IEEE) Standard 450, "lEEE Recommended Practice for Maintenance and Testing, and Replacement of Vented Load-Acid Batteries for Stationary Applications,"

into Umorick Generating Station TS SRs Sections 4.8.2.1.e, and 4.8.2.1.f. Based on discussions with the NRC about the draft 1EEE Standard 450 and the assumption -

made by both PECO and tha NRC that the draft was in its final version and was 9404130o10 94o33o I PDR~ ADDCK 0500o352 l P' PDR 3

'I

',, March 30,1994

.. Page2 expected to be issued shortly, PECO expected to submit the additional proposed TS change by the end of March,1994. However, since the September 10,1993 letter, the modified performance test described by the draft IEEE Standard 450 and its proposed substitution for the performance test has becomo an unrosolved issue warranting further review by members of the IEEE Battery Working Group (BWG). A meeting has been scheduled for April 12,1994 for the nuclear members of the BWG, to discuss whether the modified perforrnance test can satisfy the performance test criteria. After the April 12 meeting, we will be able to assess the information presented by the knowledgeablo parties and will be better informed to determine how this issue can be resolved in the most expeditious fashion in order to ensure appropriato LGS 24 month fuel cycle TS SRs.

Thorofore, we will not be submitting the additional proposed TS change in March of 1994 as stated in the September 10,1993 RAI letter; however, we will submit the additional proposed TS change once th- IEEE Standard 450 is approved. We will be able to support our current 24 month iuel cycles in accordance with our current TS SRs provided our current proposed TS Change Requests Nos. 92-02-0, and 92-03-0 are approved before the end of May,1994, if you have any questions, please do not hesitato to contact us.

Very truly yours,

h.  % .

G. A. Hungor, Jr., 1 Director Licensing Section Attachments cc: T. T. Martin, Administrator, Region I, USNRC (w/ attachments)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments)

W. P. Dornsife, Director, PA Bureau of Radiological Protection (w/ attachments)