April 09, 2008 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 12, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATIONLEAK BEFORE BREAK ANALYSES The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on February 12, 2008, to obtain clarification on Entergys response to a request for additional information (RAI) regarding the Indian Point license renewal application (LRA). By letter dated January 17, 2008, Entergy submitted its response to RAI regarding leak before break analyses. The staff reviewed the information contained therein, and requested clarification. provides a listing of the participants, and Enclosure 2 contains a listing of the items discussed with the applicant, including a brief description of the resolution of the items.
The applicant had an opportunity to comment on this summary.
\RA\
Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosures:
As stated cc w/encls: See next page
April 09, 2008 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 12, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATIONLEAK BEFORE BREAK ANALYSES The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on February 12, 2008, to obtain clarification on Entergys response to a request for additional information (RAI) regarding the Indian Point license renewal application (LRA). By letter dated January 17, 2008, Entergy submitted its response to RAI regarding leak before break analyses. The staff reviewed the information contained therein, and requested clarification. provides a listing of the participants, and Enclosure 2 contains a listing of the items discussed with the applicant, including a brief description of the resolution of the items.
The applicant had an opportunity to comment on this summary.
\RA\
Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosures:
As stated cc w/encls: See next page DISTRIBUTION: See next page ADAMS Accession No.: ML080800437 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME YEdmonds KGreen RFranovich, (BPham for)
DATE 04/08/08 04/04/08 04/0908
OFFICIAL RECORD COPY TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS FEBRUARY 12, 2008 PARTICIPANTS AFFILIATIONS John Tsao U.S. Nuclear Regulatory Commission (NRC)
Mike Stroud Entergy Nuclear Operations, Inc. (Entergy)
Nelson Azevedo Entergy Walt Wittich Entergy ENCLOSURE 1
CLARIFICATION ON RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION February 12, 2008 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on February 12, 2008, to discuss and clarify the response to a request for additional information (RAI) concerning the Indian Point Nuclear Generating Unit Nos. 2 and 3 license renewal application (LRA).
By letter dated December 21, 2007, the staff requested additional information leak before break analyses. By letter dated January 17, 2008, Entergy responded to the staffs RAI. Upon review of the information contained in Entergys response letter, the staff determined that additional clarification was warranted. The items requiring clarification are discussed below.
In its response to RAI 4.7.2-2, Page 6 of 13, second paragraph, the applicant stated that a fatigue crack growth analysis of the reactor vessel inlet nozzle to safe-end region was performed. This nozzle was selected because crack growth at this location is representative of the entire primary loop.
In its response to RAI 4.7.2-7(e), Page 10 of 13, the applicant stated that the junction of the hot leg and the reactor vessel outlet nozzle is the load limiting/bounding location. RAI 4.7.2-7(e) is related to the nozzle which is representative of the entire primary loop.
In its response to RAI 4.7.2-2, the applicant stated that the inlet nozzle is bounding but the response to RAI 4.7.2-7(e) states that the outlet nozzle is bounding.
Therefore, the staff asked the applicant to clarify the potential discrepancy.
Applicants clarification:
The applicant stated that the reactor pressure vessel (RPV) inlet nozzle is the component for which Westinghouse performed the generic study for the fleet to determine sensitivity of the fatigue crack growth. However, for IP2 and IP3, the plant-specific bounding component is the RPV outlet nozzle.
The staff finds that the applicant's response has clarified the issue.
ENCLOSURE 2
Letter to Entergy from K. Green, dated April 09, 2008 DISTRIBUTION:
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 12, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATIONLEAK BEFORE BREAK ANALYSES HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RidsNrrDlrRer1 RidsNrrDlrRer2 RidsNrrDlrRerb RidsNrrDlrRpob RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDraAplb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter RFranovich EDacus, OCA BPham GMeyer, RI KGreen MMcLaughlin, RI JCaverly NMcNamara, RI RAuluck DScrenci, RI OPA KChang NSheehan, RI OPA MKowal PCataldo, RI JBoska CHott, RI STurk, OGC DJackson, RI LSubin, OGC BWelling, RI BMizuno, OGC RConte, RI SBurnell, OPA ECobey, RI DMcIntyre, OPA MCox, RI TMensah, OEDO
Indian Point Nuclear Generating Units 2 and 3 cc:
Senior Vice President Mr. Paul Eddy Entergy Nuclear Operations, Inc. New York State Department P.O. Box 31995 of Public Service Jackson, MS 39286-1995 3 Empire State Plaza Albany, NY 12223-1350 Vice President Oversight Entergy Nuclear Operations, Inc. Regional Administrator, Region I P.O. Box 31995 U.S. Nuclear Regulatory Commission Jackson, MS 39286-1995 475 Allendale Road King of Prussia, PA 19406 Senior Manager, Nuclear Safety &
Licensing Senior Resident Inspectors Office Entergy Nuclear Operations, Inc. Indian Point 2 P.O. Box 31995 U.S. Nuclear Regulatory Commission Jackson, MS 39286-1995 P.O. Box 59 Buchanan, NY 10511 Senior Vice President and COO Entergy Nuclear Operations, Inc. Senior Resident Inspectors Office 440 Hamilton Avenue Indian Point 3 White Plains, NY 10601 U.S. Nuclear Regulatory Commission P.O. Box 59 Assistant General Counsel Buchanan, NY 10511 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Mr. Charles Donaldson, Esquire White Plains, NY 10601 Assistant Attorney General New York Department of Law Manager, Licensing 120 Broadway Entergy Nuclear Operations, Inc. New York, NY 10271 Indian Point Energy Center 450 Broadway, GSB Mr. Raymond L. Albanese P.O. Box 249 Four County Coordinator Buchanan, NY 10511-0249 200 Bradhurst Avenue Unit 4 Westchester County Mr. Paul D. Tonko Hawthorne, NY 10532 President and CEO New York State Energy Research and Mayor, Village of Buchanan Development Authority 236 Tate Avenue 17 Columbia Circle Buchanan, NY 10511 Albany, NY 12203-6399 Mr. William DiProfio Mr. John P. Spath PWR SRC Consultant New York State Energy, Research and 48 Bear Hill Road Development Authority Newton, NH 03858 17 Columbia Circle Albany, NY 12203-6399
Indian Point Nuclear Generating Units 2 and 3 cc:
Mr. Garry Randolph Mr. Robert Snook PWR SRC Consultant Assistant Attorney General 1750 Ben Franklin Drive, 7E Office of the Attorney General Sarasota, FL 34236 State of Connecticut 55 Elm Street Mr. William T. Russell P.O. Box 120 PWR SRC Consultant Hartford, CT 06141-0120 400 Plantation Lane Stevensville, MD 21666-3232 Ms. Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius, LLP Mr. Jim Riccio 1111 Pennsylvania Avenue, NW Greenpeace Washington, DC 20004 702 H Street, NW Suite 300 Mr. Paul M. Bessette, Esq.
Washington, DC 20001 Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Mr. Phillip Musegaas Washington, DC 20004 Riverkeeper, Inc.
828 South Broadway Mr. Martin J. ONeill, Esq.
Tarrytown, NY 10591 Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Mr. Mark Jacobs Washington, DC 20004 IPSEC 46 Highland Drive The Honorable Nita Lowey Garrison, NY 10524 222 Mamaroneck Avenue, Suite 310 White Plains, NY 10605 Mr. R. M. Waters Technical Specialist Licensing Ms. Joan Leary Matthews 450 Broadway Senior Counsel for Special Projects P.O. Box 0249 Office of General Counsel Buchanan, NY 10511-0249 NYS Department of Environmental Conservation Mr. Sherwood Martinelli 625 Broadway 351 Dyckman Albany, NY 12233-5500 Peekskill, NY 10566 Ms. Susan Shapiro, Esq.
21 Perlman Drive Spring Valley, NY 10977 Mr. John Sipos Assistant Attorney General New York State Department of Law Environmental Protection Bureau The Capitol Albany, NY 12224