ML17193B298

From kanterella
Revision as of 12:19, 8 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Tech Spec Table 3.6.1,removing Snubbers 18, 19 & 20 from HPCI Sys Piping,In Support of 810401 OL Amend Application.Max Piping Stress Is Above Allowable Limit W/Snubbers Present
Date released: 12/23/2019 Download: ML17193B298


Proposed Revision to Tech Spec Table 3.6.1
ML19343D118
Person / Time
Site: Dresden Constellation icon.png
Issue date: 04/03/1981
From:
COMMONWEALTH EDISON CO.
To:
References
Download: ML19343D118 (1)
Forwards Revised Tech Spec Table 3.6.1,removing Snubbers 18, 19 & 20 from HPCI Sys Piping,In Support of 810401 OL Amend Application.Max Piping Stress Is Above Allowable Limit W/Snubbers Present
ML17193B297
Person / Time
Site: Dresden Constellation icon.png
Issue date: 04/03/1981
From: Janecek R
COMMONWEALTH EDISON CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML17193B297 (2)