ML17209A417

From kanterella
Revision as of 10:36, 8 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-043/03L-0
Date released: 01/25/2018 Download: ML17209A417


LER 80-043/03L-0:on 800821,during Normal Operation,Cedm 39 Failed,Dropping CEA to Full Insertion.Cause of Failure Undetermined.Power Supply Unit Replaced.Cedm 39 Returned to Normal Operations
ML17266A372
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/18/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A372 (1)
Forwards LER 80-043/03L-0
ML17209A416
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/18/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209A416 (2)