ML17285B053

From kanterella
Revision as of 19:13, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License NPF-21,allowing Use of Cycle 6 Reload Fuel in Plant.Changes to Listed Tech Specs Requested.Supporting Reload Analysis Repts Encl.Proprietary GE & Abb Atom Repts Withheld (Ref 10CFR2.790(b)(4))
Date released: 11/03/2019 Download: ML17285B053


Washington Nuclear Plant-2 Cycle 6 Plant Transient Analysis.
ML17285B057
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1990
From: Krajicek J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
References
Download: ML17285B057 (58)
Washington Nuclear Plant-2 Cycle 6 Reload Analysis.
ML17285B056
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1990
From: Krajicek J, Leonard S
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
References
Download: ML17285B056 (56)
Washington Nuclear Plant-2 Cycle 6 Reload Summary Rept.
ML17285B055
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1990
From: Wolkenhauer W
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17285B055 (82)
Proposed Tech Specs Re Use of Cycle 6 Reload Fuel in Plant
ML17285B054
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/27/1990
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17285B054 (29)
Application for Amend to License NPF-21,allowing Use of Cycle 6 Reload Fuel in Plant.Changes to Listed Tech Specs Requested.Supporting Reload Analysis Repts Encl.Proprietary GE & Abb Atom Repts Withheld (Ref 10CFR2.790(b)(4))
ML17285B052
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/27/1990
From: Sorensen G
Washington Public Power Supply System
To:
NRC/IRM
References
Download: ML17285B052 (58)