ML17326A719

From kanterella
Revision as of 04:42, 7 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-016/03L-0
Date released: 05/31/2018 Download: ML17326A719


LER 80-016/03L-0:on 800720,during Automatic Load Sequence Timing Relay Surveillance Test,Timer for 1E-MDAFP Exceeded Max Allowable Time.Caused by Instrument Drift.Timer Reset & Retested
ML17331A421
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/19/1980
From: Rischling J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17331A421 (2)
Forwards LER 80-016/03L-0
ML17326A718
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/19/1980
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A718 (2)