ML17346B240

From kanterella
Revision as of 20:37, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Specs to Require That 18-month Insp of Each Diesel Generator Be Performed During Next Unit 3 Refueling Outage. Fee Paid
Date released: 07/31/2018 Download: ML17346B240


Proposed Tech Specs Requiring 18-month Insp of Diesel Generator Be Performed During Next Unit 3 Refueling Outage
ML17346B241
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/20/1986
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17346B241 (9)
Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Specs to Require That 18-month Insp of Each Diesel Generator Be Performed During Next Unit 3 Refueling Outage. Fee Paid
ML17346B239
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/20/1986
From: Woody C
FLORIDA POWER & LIGHT CO.
To: THOMPSON H L
Office of Nuclear Reactor Regulation
References
Download: ML17346B239 (8)