ML18051B390

From kanterella
Revision as of 00:15, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-20,revising Tech Spec 4.7.2 to Change Station Battery Svc & Discharge Tests from 18- & 60-month Intervals,Respectively,Per SEP Topic VIII-3.A, Station Battery Capacity Test....Fee Paid
Date released: 10/31/2018 Download: ML18051B390


Proposed Tech Spec 4.7.2 Change,Revising Frequency of Periodic Station Battery Svc & Discharge Tests from 18- & 60-month Intervals,Respectively,Per SEP Topic VIII-3.A, Station Battery Capacity Test Requirements.
ML18051B394
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/13/1985
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
TASK-08-03.A, TASK-8-3.A, TASK-RR
Download: ML18051B394 (2)
Application for Amend to License DPR-20,revising Tech Spec 4.7.2 to Change Station Battery Svc & Discharge Tests from 18- & 60-month Intervals,Respectively,Per SEP Topic VIII-3.A, Station Battery Capacity Test Requirements.
ML18051B391
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/13/1985
From: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
TASK-08-03.A, TASK-8-3.A, TASK-RR
Download: ML18051B391 (3)
Forwards Application for Amend to License DPR-20,revising Tech Spec 4.7.2 to Change Station Battery Svc & Discharge Tests from 18- & 60-month Intervals,Respectively,Per SEP Topic VIII-3.A, Station Battery Capacity Test....Fee Paid
ML18051B389
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/13/1985
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
References
TASK-08-03.A, TASK-8-3.A, TASK-RR
Download: ML18051B389 (2)