ML18064A503

From kanterella
Revision as of 21:49, 5 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
Date released: 10/31/2018 Download: ML18064A503


LER 94-019-00:on 941109,identified Failure to Test Redundant Equipment Per TS 3.3.2.f Prior Ro Removal of Electrical Breakers from Svc for Planned PM Due to Personnel Error. Administrative Procedure 5.14 Revised
ML18064A504
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1994
From: Gire P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18064A504 (5)
Forwards LER 94-019,Failure to Test Redundant Equipment Per TS 3.3.2.f Prior to Removal of Electrical Breakers from Svc for Planned Preventive Maintenance. LER Contains Four New Listed Commitments
ML18064A502
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1994
From: Haas K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18064A502 (2)