ML20002B975

From kanterella
Revision as of 11:18, 29 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-046/03L-0
Date released: 01/16/2020 Download: ML20002B975


LER 80-046/03L-0:on 801117,isolation Valve on Discharge Line from Drywell Equipment Sump G, RW-A0-94,would Not Open. Caused by Hard & Worn U-cup Seal in Piston Air Operator. New Piston U-cups Installed & Valve Retested
ML20002B977
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/15/1980
From: Scheer J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20002B977 (1)
Forwards LER 80-046/03L-0
ML20002B974
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/15/1980
From: Lessor L
NEBRASKA PUBLIC POWER DISTRICT
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML20002B974 (3)