ML20009D579

From kanterella
Revision as of 10:42, 28 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-015/03L-0
Date released: 01/23/2020 Download: ML20009D579


LER 81-015/03L-0:on 810618,switch Actuated at 32.8 Inches During Calibr of Isolation Condenser Steam/Condensate Line High Flow.Caused by Instrument Drift.Switch Reset
ML20009D581
Person / Time
Site: Dresden Constellation icon.png
Issue date: 07/13/1981
From: Mancini B
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20009D581 (2)
Forwards LER 81-015/03L-0
ML20009D578
Person / Time
Site: Dresden Constellation icon.png
Issue date: 07/13/1981
From: Scott D
COMMONWEALTH EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20009D578 (1)