ML20010E127

From kanterella
Revision as of 01:50, 28 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 81-030/03L-0,81-031/03L-0 & 81-032/03L-0
Date released: 01/24/2020 Download: ML20010E127


LER 81-032/03L-0:on 810727,TDAFP Could Not Meet Discharge Pressure & Flow Requirements Per Tech Specs.Caused by TDAFP Governor Valve Repair During Outage.Linkage Adjustments Were Not Made.Procedures Modified
ML20010E143
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/25/1981
From: Palmer R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20010E143 (2)
LER 81-031/03L-0:on 810807,612-ft Elevation Containment Inner Airlock Door Interlock Was Found Inoperable During Containment Entry.Caused by Broken Cable.Cable Replaced
ML20010E138
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/25/1981
From: Wizner D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20010E138 (2)
LER 81-030/03L-0:on 810727,pressurizer Pressure Channel NPP-153 Was Indicating Approx 100 Psi Higher than Normal During Unit Heatup.Caused by Pressurizer Pressure Transmitter Calibr Drift.Transmitter Calibr
ML20010E134
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/25/1981
From: Palmer R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20010E134 (1)
Forwards LERs 81-030/03L-0,81-031/03L-0 & 81-032/03L-0
ML20010E126
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/25/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20010E126 (1)