ML20010E810

From kanterella
Revision as of 23:38, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-073/03L-0
Date released: 01/24/2020 Download: ML20010E810


LER 81-073/03L-0:on 810728,high Pressure Core Injection Turbine Exhaust Diaphragm High Pressure Switch Actuated at 11 Psig.Caused by Switch Setpoint Drift.Barkdale Pressure Switch Recalibr
ML20010E813
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/20/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010E813 (2)
Forwards LER 81-073/03L-0
ML20010E809
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/20/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010E809 (1)