ML20010F453

From kanterella
Revision as of 23:46, 27 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend of License DPR-28 Submitted as Proposed Change 98 to App A,Tech Specs Re Scram Insertion Times,Control Rod Accumulators & Min Critical Power Ratio
Date released: 01/24/2020 Download: ML20010F453


Cycle 9 Core Performance Analysis.
ML20010F459
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 08/31/1981
From: Ansari A, Burns K, Candon J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
References
Download: ML20010F459 (105)
Proposed Revisions to Tech Specs 3.3,4.3,3.11C & Table 3.11-2 Re Scram Insertion Times,Control Rod Accumulators & Min Critical Power Ratio
ML20010F457
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/02/1981
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
References
Download: ML20010F457 (6)
Application for Amend of License DPR-28 Submitted as Proposed Change 98 to App A,Tech Specs Re Scram Insertion Times,Control Rod Accumulators & Min Critical Power Ratio
ML20010F452
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/02/1981
From: Heider L
VERMONT YANKEE NUCLEAR POWER CORP.
To:
References
Download: ML20010F452 (3)