Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept. Containment Vessel Has Been Assessed as Fully Capable of Performing Intended Function in Plant Operation
ML19337B628
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/29/1980
From: Crouse R
TOLEDO EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19337B629 List:
References
652, NUDOCS 8010080233
Download: ML19337B628 (1)


Text

0 e

C~ '  ; TOLEDO

EDISON September 29, 1980 Acranc P. CRouSE Docket No. 50-346 UU'"

License No. NPF-3 to191259-5221 Serial No. 652 Mr. Harold R. Denton, Director

  • Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

Attached please find 15 copies of the Primary Reactor Containment Integrated Leakage Rate Test report for the Davis-Besse Nuclear Power Station Unit 1, which is being submitted to the Nuclear Regulatory Commission in accordance with Appendix J of 10CFR Part 50.

The results of the test show that the actual measured containment vessel leakage, when the containment vessel is pressurized to the peak calculated accident pressure, is less than 75% of the maximum allowable leakage assumed in safety analyses. The containment vessel has, therefore, been assessed ~as being fully capable of performing its intended function in the operation of the Davis-Besse Nuclear Power Station Unit 1.

Yours very truly, f f .i :^

RPC/ljk ,

Attachment cc: Mr. Norman Haller., Director Of fice of Management Program Analysis Encl:, 2 Mr. Luis Reyes NRC Resident Inspector Encl: 1 8010080 THE TCLEGO EDI3ON COMPANY 233 EDISON PLAZA 300 MADISON AVENUE TOi.EDO, OH'O 43652