ML20002E153

From kanterella
Revision as of 23:52, 17 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1980
ML20002E153
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/10/1981
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20002E154 List:
References
PM-81-5, NUDOCS 8101260525
Download: ML20002E153 (1)


Text

.

G:crge Power Cor,pery Post Off:cs Com 442 Bailey. Georg:a 31513 Teleonone 912 367-7781 912 537-9444 Eawin 1. Hatch Nuclear Plant Georgia Power the sa#wn entic system January 10, 1981 PM-81-5 PLANT E. I. HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission .

Washington, D. C. 20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.

LAn c '

si- L u t; "Mfnahrf Plant Manager)

CLC/pebc 0

- f05 81033605454 ql