Similar Documents at Ginna |
---|
Category:Meeting Summary
MONTHYEARML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20205L3712020-07-23023 July 2020 and R.E. Ginna Nuclear Power Plant Summary of Meeting ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML20077G9742020-03-18018 March 2020 R. E. Ginna Nuclear Power Plant - Summary of March 2, 2020, Meeting Regarding License Amendment Request to Support Shutdown of Reactor During Upcoming Refueling Outage ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19253C7552019-09-10010 September 2019 Annual Assessment Meeting Summary ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18221A1102018-08-0808 August 2018 July 31, 2018 Summary of Public Meeting for R. E. Ginna ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17143A1712017-05-23023 May 2017 2017 Public Meeting Handout and Sign in Sheet ML17143A3542017-05-23023 May 2017 Summary of Public Meeting R.E Ginna Nuclear Power Plant ML16228A0622016-08-15015 August 2016 Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin ML16110A0562016-04-18018 April 2016 April 12, 2016, Summary of Public Annual Assessment Meeting for R.E. Ginna Nuclear Power Plant ML16109A2642016-04-12012 April 2016 4/12/2016 - R.E. Ginna Nuclear Power Plant Annual Assessment Meeting - Sign-In Sheet and Summary Data Sheet ML16085A3292016-04-0606 April 2016 Summary of March 22, 2016, Meeting with Exelon Generation Company, LLC, on Proposed License Amendment Request to Adopt ANSI 3.1-2014 Operating Training Standards ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16040A2182016-02-11011 February 2016 January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing Managers ML16035A1762016-02-11011 February 2016 Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on It'S Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183) ML15118A0232015-04-27027 April 2015 4/21/2015, Summary of Annual Assessment Meeting for R.E. Ginna Nuclear Power Plant ML14085A3302014-03-26026 March 2014 Summary of Annual Assessment Meeting for R.E. Ginna Nuclear Power Plant on 3/20/2014 ML13226A2362013-08-14014 August 2013 8/5/13 - Summary of Ceng/Nrc Annual Management Meeting ML13099A4252013-04-0808 April 2013 4/4/2013 - R. E. Ginna - Summary of Annual Assessment Open House ML13056A5342013-03-25025 March 2013 Summary of Category 1 Meeting with Constellation Energy Nuclear Group - Pre-Application Meeting to Discuss Proposed License Amendment for Transition to National Fire Protection Association'S Standard (NFPA) 805, for R.E. Ginna Nuclear ML13044A0892013-02-21021 February 2013 1/29/2013 - R. E. Ginna Summary of Category 1 Meeting with Constellation Energy Nuclear Group Proposed Diverse and Flexible Coping Strategies (FLEX) 2024-06-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 18, 2016 MEETING
SUMMARY
LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: R.E. GINNA NUCLEAR POWER PLANT
SUBJECT:
SUMMARY
OF PUBLIC MEETING On April 12, 2016, from 4:00 p.m. to 6:00 p.m., at the Town Hall, Ontario, NY, the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at the R.E. Ginna Nuclear Power Plant in 2015.
A notice of the open-house was issued March 15, 2016, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16076A135. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and fact sheets, and was available to discuss its assessment of the safety performance of the R.E. Ginna Nuclear Power Plant for the period of January 1, 2015, through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16061A186). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the R.E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public and local officials attended the open-house and were offered the opportunity to question the NRC regarding the R.E. Ginna Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.
/RA Andrew A. Rosebrook for/_
Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects
Enclosure:
Public Meeting Sign-In Sheet and Handout (ML16109A264)
ML16110A056 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR ADimitriadis/AAR for DATE 4/18/16 4/18/16 ML16109A264 Enclosure
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 18, 2016 MEETING
SUMMARY
LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: R.E. GINNA NUCLEAR POWER PLANT
SUBJECT:
SUMMARY
OF PUBLIC MEETING On April 12, 2016, from 4:00 p.m. to 6:00 p.m., at the Town Hall, Ontario, NY, the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at the R.E. Ginna Nuclear Power Plant in 2015.
A notice of the open-house was issued March 15, 2016, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16076A135. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and fact sheets, and was available to discuss its assessment of the safety performance of the R.E. Ginna Nuclear Power Plant for the period of January 1, 2015, through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16061A186). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the R.E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public and local officials attended the open-house and were offered the opportunity to question the NRC regarding the R.E. Ginna Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.
/RA Andrew A. Rosebrook for/_
Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects
Enclosure:
Public Meeting Sign-In Sheet and Handout (ML16109A264)
ML16110A056 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR ADimitriadis/AAR for DATE 4/18/16 4/18/16 ML16109A264 Enclosure