ML16110A056

From kanterella
Revision as of 03:38, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
April 12, 2016, Summary of Public Annual Assessment Meeting for R.E. Ginna Nuclear Power Plant
ML16110A056
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/18/2016
From: Anthony Dimitriadis
Reactor Projects Branch 1
To:
Rosebrook A
References
Download: ML16110A056 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 18, 2016 MEETING

SUMMARY

LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: R.E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 12, 2016, from 4:00 p.m. to 6:00 p.m., at the Town Hall, Ontario, NY, the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at the R.E. Ginna Nuclear Power Plant in 2015.

A notice of the open-house was issued March 15, 2016, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16076A135. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and fact sheets, and was available to discuss its assessment of the safety performance of the R.E. Ginna Nuclear Power Plant for the period of January 1, 2015, through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16061A186). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the R.E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and local officials attended the open-house and were offered the opportunity to question the NRC regarding the R.E. Ginna Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA Andrew A. Rosebrook for/_

Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet and Handout (ML16109A264)

ML16110A056 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR ADimitriadis/AAR for DATE 4/18/16 4/18/16 ML16109A264 Enclosure

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 18, 2016 MEETING

SUMMARY

LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: R.E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 12, 2016, from 4:00 p.m. to 6:00 p.m., at the Town Hall, Ontario, NY, the U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at the R.E. Ginna Nuclear Power Plant in 2015.

A notice of the open-house was issued March 15, 2016, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16076A135. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and fact sheets, and was available to discuss its assessment of the safety performance of the R.E. Ginna Nuclear Power Plant for the period of January 1, 2015, through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16061A186). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the R.E. Ginna Nuclear Power Plant can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and local officials attended the open-house and were offered the opportunity to question the NRC regarding the R.E. Ginna Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA Andrew A. Rosebrook for/_

Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet and Handout (ML16109A264)

ML16110A056 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR ADimitriadis/AAR for DATE 4/18/16 4/18/16 ML16109A264 Enclosure