Similar Documents at Ginna |
---|
Category:Graphics incl Charts and Tables
MONTHYEARNMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B0262018-05-23023 May 2018 R. E. Ginna - Plate G-3, Seismic Refraction Surveys, Seismic Refraction Line III and Iv. ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15334A4532015-12-0404 December 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request-Flood Causing Mechanism Reevaluation ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0315504242003-06-0303 June 2003 in Surge Example, Ginna Maximum System At'S During Heatups, & Ginna Maximum System At'S During Cooldowns ML18143A4451978-08-0303 August 1978 Spent Fuel Pool Cooling ML18143A4421978-08-0202 August 1978 R. E. Ginna - Response to Request, Attached Are Additional Detail on Flux Map Taken During Startup of Cycle 8 ML18142B0721978-07-28028 July 1978 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1978 ML18143A4501978-07-27027 July 1978 R. E. Ginna - 1978 Steam Generator Inspection Final Report and NRC Questionnaire Update ML18142A7031978-04-18018 April 1978 Response to NRC Request Consisting of Information Concerning Data Taken During the Startup of Cycle 7 at Subject Facility with Attachment Table Presenting Predicted Rod Worth and the Measured Rod Worths with and Without Control Rod ML18142B0711978-03-14014 March 1978 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1977 ML18192A0781977-05-11011 May 1977 R. E. Ginna - Steam Generator Inspection Final Report, May 11, 1977 ML18142B0701977-02-0303 February 1977 Forwards Semiannual Effluent Release Report for the Period of Jul. - Dec. 1976 ML18142B0691976-07-26026 July 1976 Forwards Semiannual Effluent Release Report for the Period of Jan. - Jun. 1976 ML18142C0691975-10-30030 October 1975 R. E. Ginna - 10/30/1975 Letter Transmittal of Request for Exemption from Certain Provisions of Appendix J to 10 C.F.R. Part 50 2020-04-24
[Table view] |
Text
+-
T ,
,,NOTES:
L$
tH- I+ ~TI-I~~
I
+
I
-+ TIME DISTANCE PLOTS SHOW INFORMATION COLLECTED FROH SHOT POINTS MADE AT SEVERAL LOCATIONS ALONG A SEISMIC LINE FOR CLARIFICATION TWO PLOT SYMBOLS HAVE BEEN USED TO INDICATE THE
'+- ORIGIN OF THIS ENERGY: FROM THE LEFT(')
FROM THE RIGHT +
. LJ -HtL APPARENT COMPRESSIONAL WAVE VELOCITIES ARE THOSE VELOCITIES WHICH ARE SHOWN BY THE RAW FIELD DATA. THEY ARE NOT THE TRUE COMPRESSIONAL WAVE VELOCITIES AS jt L.i T i I T
THEY HAVE NOT BEEN CORRECTED FOR SURFACE AND SUBSURFACE TOPOGRAPHY. WHEN THESE
-iCORRECTIONS HAVE BEEN MADE, A TRUE COMPRESSIONAL WAVE VELOCITY RESULTS, AS SHOWN IN THE SUBSURFACE CROSS SECTION.
+
I~T+ t ~ti . L- T+
Lit
+>> [T~~
I'+
L+
LT-
~+4 --t-II
+
L LLI L-Lt
'J 'PTL L'L
+t +
t I ++
I j .'P'. @tw
)I-+ +- p-t-pP,-tt
'j ig I-f
~f't "31 tt Tt, ttg Jt I+T J -~
I JJ j-I i
J t'ai.' +l -'
3t,T! jiT, OAMSS B MOORS
~
PLATE